Saturn V
Saturn V was an American super heavy-lift launch vehicle certified for human-rating used by NASA between 1967 and 1973. It consisted of three stages, each fueled by liquid propellants. It was developed to support the Apollo program for human exploration of the Moon and was later used to launch Skylab, the first American space station.
The Saturn V was launched 13 times from Kennedy Space Center with no loss of crew or payload. the Saturn V remains the tallest, heaviest, and most powerful rocket ever brought to operational status, and holds records for the heaviest payload launched and largest payload capacity to low Earth orbit of, which included the third stage and unburned propellant needed to send the Apollo command and service module and Lunar Module to the Moon.
As the largest production model of the Saturn family of rockets, the Saturn V was designed under the direction of Wernher von Braun at the Marshall Space Flight Center in Huntsville, Alabama, with Boeing, North American Aviation, Douglas Aircraft Company, and IBM as the lead contractors.
, the Saturn V remains the only launch vehicle to carry humans beyond low Earth orbit. A total of 15 flight-capable vehicles were built, but only 13 were flown. An additional three vehicles were built for ground testing purposes. A total of 24 astronauts were launched to the Moon in the four years spanning December 1968 through December 1972.
History
In September 1945, the US government brought the German rocket technologist Wernher von Braun and about seven hundred German rocket engineers and technicians to the United States for Operation Paperclip, a program authorized by President Truman.Von Braun was assigned to the Army's rocket design division due to his prior direct involvement in the creation of the V-2 rocket. Between 1945 and 1958, his work was restricted to conveying the ideas and methods behind the V-2 to American engineers. Despite von Braun's many articles on the future of space rocketry, the US government continued funding Air Force and Navy rocket programs to test their Vanguard missiles despite numerous costly failures.
The US Army and government began taking serious steps towards sending Americans into space in 1957, when the Soviets launched Sputnik 1 atop an R-7 ICBM, which is capable of carrying a thermonuclear warhead to the US. They turned to von Braun's team, who had created and experimented with the Jupiter series of rockets.
The Juno I rocket launched the first American satellite in January 1958, and was part of the last-ditch plan for NACA to participate in the Space Race. Von Braun considered the Jupiter series to be a prototype and referred to it as "an infant Saturn".
Saturn development
The Saturn program was named for the next planet after Jupiter. Its design stemmed from the designs of the Jupiter series rockets. As the success of the Jupiter series became evident, the Saturn series emerged.Between 1960 and 1962, the Marshall Space Flight Center designed a series of Saturn rockets that could be deployed for various Earth orbit or lunar missions.
NASA planned to use the Saturn C-3 as part of the Earth orbit rendezvous method, with at least four or five launches needed for a single lunar mission.. However, the MSFC planned an even bigger rocket, the C-4, which would use four F-1 engines in its first stage, an enlarged C-3 second stage, and the S-IVB, a stage with a single J-2 engine, as its third stage. The C-4 would need only two launches to carry out an EOR lunar mission.
On January 10, 1962, NASA announced plans to build the C-5. The three-stage rocket would consist of: the S-IC first stage, with five F-1 engines; the S-II second stage, with five J-2 engines; and the S-IVB third stage, with a single J-2 engine. The C-5 was designed for a payload capacity to the Moon.
The C-5 would undergo component testing even before the first model was constructed. The S-IVB third stage would be used as the second stage for the C-IB, which would serve both to demonstrate proof of concept and feasibility for the C-5, but would also provide flight data critical to development of the C-5. Rather than undergoing testing for each major component, the C-5 would be tested in an "all-up" fashion, meaning that the first test flight of the rocket would include complete versions of all three stages. By testing all components at once, far fewer test flights would be required before a crewed launch.
The C-5 was confirmed as NASA's choice for the Apollo program in early 1963, and was named the Saturn V. The C-1 became the Saturn I, and C-1B became Saturn IB. Von Braun headed a team at the MSFC to build a vehicle capable of launching a crewed spacecraft to the Moon.
Before they moved under NASA's jurisdiction, von Braun's team had already begun work on improving the thrust, creating a less complex operating system, and designing better mechanical systems. During these revisions, the team rejected the single engine of the V-2's design and moved to a multiple-engine design. The Saturn I and IB reflected these changes but were not large enough to send a crewed spacecraft to the Moon. These designs, however, provided a basis for which NASA could determine its best method towards landing a man on the Moon.
The Saturn V's final design had several key features. Engineers determined that the best engines were the F-1s coupled with the new liquid hydrogen propulsion system called J-2, which made the Saturn C-5 configuration optimal. By 1962, NASA had finalized its plans to proceed with von Braun's Saturn designs, and the Apollo space program gained speed.
With the configuration finalized, NASA turned its attention to mission profiles. Despite some controversy, a lunar orbit rendezvous for the lunar module was chosen over an Earth orbital rendezvous. Issues such as type of fuel injections, the amount of fuel needed for the trip, and rocket manufacturing processes were resolved, and the designs for the Saturn V were selected. The stages were designed by von Braun's Marshall Space Flight Center in Huntsville, and outside contractors were chosen for the construction: Boeing, North American Aviation, Douglas Aircraft, and IBM.
Selection for Apollo lunar landing
Early in the planning process, NASA considered three methods for the Moon mission: Earth orbit rendezvous, direct ascent, and lunar orbit rendezvous. A direct ascent configuration would require an extremely large rocket to send a three-man spacecraft to land directly on the lunar surface. An EOR would launch the direct-landing spacecraft in two smaller parts which would combine in Earth orbit. A LOR mission would involve a single rocket launching two spacecraft: a mother ship, and a smaller, two-man landing module which would rendezvous back with the main spacecraft in lunar orbit. The lander would be discarded and the mother ship would return home.At first, NASA dismissed LOR as a riskier option, as a space rendezvous had yet to be performed in Earth orbit, much less in lunar orbit. Several NASA officials, including Langley Research Center engineer John Houbolt and NASA Administrator George Low, argued that a lunar orbit rendezvous provided the simplest landing on the Moon with the most cost–efficient launch vehicle, and the best chance to accomplish the lunar landing within the decade. Other NASA officials were convinced, and LOR was officially selected as the mission configuration for the Apollo program on November 7, 1962. Arthur Rudolph became the project director of the Saturn V rocket program in August 1963. He developed the requirements for the rocket system and the mission plan for the Apollo program. The first Saturn V launch lifted off from Kennedy Space Center and performed flawlessly on November 9, 1967, Rudolph's birthday. He was then assigned as the special assistant to the director of MSFC in May 1968 and subsequently retired from NASA on January 1, 1969. During his tenure he was awarded the NASA Exceptional Service Medal and the NASA Distinguished Service Medal. On July 16, 1969, the Saturn V launched Apollo 11, putting man on the Moon.
Technology
The Saturn V's size and payload capacity dwarfed all other previous rockets successfully flown at that time. With the Apollo spacecraft on top, it stood tall, and, ignoring the fins, was in diameter. Fully fueled, the Saturn V weighed and had a low Earth orbit payload capacity originally estimated at, but was designed to send at least to the Moon.Later upgrades increased that capacity; during the final three Apollo lunar missions it deployed about to LEO and sent up to spacecraft to the Moon. At a height of, the Saturn V was taller than the Statue of Liberty from the ground to the torch, and taller than the Big Ben clock tower.
In contrast, the Mercury-Redstone Launch Vehicle used on Freedom 7, the first crewed American spaceflight, was approximately longer than the S-IVB stage and delivered less sea level thrust than the Launch Escape System rocket mounted atop the Apollo command module.The Apollo LES fired for a much shorter time than the Mercury-Redstone ; thus the Redstone still delivered a much greater total impulse of, versus for the Apollo LES.
The Saturn V was principally designed by the Marshall Space Flight Center in Huntsville, Alabama, although numerous major systems, including propulsion, were designed by subcontractors. It used the powerful F-1 and J-2 rocket engines for propulsion, which shattered the windows of nearby houses when they were tested at Stennis Space Center. Designers decided early on to attempt to use as much technology from the Saturn I program as possible. Consequently, the S-IVB-500 third stage of the Saturn V was based on the S-IVB-200 second stage of the Saturn IB. The instrument unit that controlled the Saturn V shared characteristics with the one carried by the Saturn IB.
The Saturn V is primarily constructed by aluminum. It was also made of titanium, polyurethane, cork and asbestos. Blueprints and other Saturn V plans are available on microfilm at the Marshall Space Flight Center.
Stages
The Saturn V consisted of three stages—the S-IC first stage, S-II second stage and the S-IVB third stage—and the instrument unit. All three stages used liquid oxygen as the oxidizer. The first stage used RP-1 for fuel, while the second and third stages used liquid hydrogen. Whereas LH2 has a much higher energy density to be lifted into orbit by mass, RP-1 has a much higher energy density by volume. Consequently, RP-1 was chosen for the first stage propellant because the volume of LH2 required would have been more than three times greater and would have created much higher aerodynamic drag during the boost phase through the atmosphere. The upper stages also used small solid-propellant ullage motors that helped to separate the stages during the launch, and to ensure that the liquid propellants were in a proper position to be drawn into the pumps.S-IC first stage
The S-IC was built by the Boeing Company at the Michoud Assembly Facility, New Orleans, where the Space Shuttle external tanks would later be built by Lockheed Martin. Most of its mass at launch was propellant: RP-1 fuel with liquid oxygen as the oxidizer. It was tall and in diameter, and provided over of thrust. The S-IC stage had a dry weight of about ; when fully fueled at launch, it had a total weight of. It was powered by five Rocketdyne F-1 engines arrayed in a quincunx. The center engine was held in a fixed position, while the four outer engines could be hydraulically turned with gimbals to steer the rocket. In flight, the center engine was turned off about 26 seconds earlier than the outboard engines to limit acceleration. During launch, the S-IC fired its engines for 168 seconds and at engine cutoff, the vehicle was at an altitude of about, was downrange about, and was moving about.S-II second stage
The S-II was built by North American Aviation at Seal Beach, California. Using liquid hydrogen and liquid oxygen, it had five Rocketdyne J-2 engines in a similar arrangement to the S-IC, also using the outer engines for control. The S-II was tall with a diameter of, identical to the S-IC, and thus was the largest cryogenic stage until the launch of the Space Shuttle in 1981. The S-II had a dry weight of about ; when fully fueled, it weighed. The second stage accelerated the Saturn V through the upper atmosphere with of thrust in a vacuum.When loaded, significantly more than 90 percent of the mass of the stage was propellant; however, the ultra-lightweight design had led to two failures in structural testing. Instead of having an intertank structure to separate the two fuel tanks as was done in the S-IC, the S-II used a common bulkhead that was constructed from both the top of the LOX tank and bottom of the LH2 tank. It consisted of two aluminum sheets separated by a honeycomb structure made of phenolic resin. This bulkhead had to insulate against the temperature difference between the two tanks. The use of a common bulkhead saved by both eliminating one bulkhead and reducing the stage's length. Like the S-IC, the S-II was transported from its manufacturing plant to the Cape by sea.
S-IVB third stage
The S-IVB was built by the Douglas Aircraft Company at Huntington Beach, California. It had one J-2 engine and used the same fuel as the S-II. The S-IVB used a common bulkhead to separate the two tanks. It was tall with a diameter of and was also designed with high mass efficiency, though not quite as aggressively as the S-II. The S-IVB had a dry weight of about and, fully fueled, weighed about.The S-IVB was the only rocket stage of the Saturn V small enough to be transported by Aero Spacelines Pregnant Guppy.
Instrument unit
The instrument unit was built by IBM and was placed on top of the third stage. It was constructed at the Space Systems Center in Huntsville, Alabama. This computer controlled the operations of the rocket from just before liftoff until the S-IVB was discarded. It included guidance and telemetry systems for the rocket. By measuring the acceleration and vehicle attitude, it could calculate the position and velocity of the rocket and correct for any deviations.Range safety
In the event of an abort requiring the destruction of the rocket, the range safety officer would remotely shut down the engines and after several seconds send another command for the shaped explosive charges attached to the outer surfaces of the rocket to detonate. These would make cuts in fuel and oxidizer tanks to disperse the fuel quickly and to minimize mixing. The pause between these actions would give time for the crew to escape via the Launch Escape Tower or the propulsion system of the Service module. A third command, "safe", was used after the S-IVB stage reached orbit to irreversibly deactivate the self-destruct system. The system was inactive as long as the rocket was still on the launch pad.Comparisons
Titan II
The Saturn V had a much lower thrust-to-weight ratio than Titan II GLV, the launch system used by Project Gemini, NASA's second human spaceflight program. Richard F. Gordon, Jr. described Saturn V as "an old man's ride", with "a lot more shake-rattle-and-roll" but milder thrust. Buzz Aldrin and other Apollo 11 astronauts agreed that unlike Titan, they could not tell when Saturn V liftoff occurred except from instruments.Soviet N1-L3
The Soviet space program's counterpart to the Saturn V was Sergei Korolev's N1-L3. The Saturn V was taller, heavier, and had a greater payload capacity, both to low Earth orbit and to translunar injection. The N-1 was a three-stage launch vehicle with more liftoff thrust and a larger first stage diameter than the Saturn V. It was to carry the L3 vehicle into orbit.The N1 never became operational; each of its four test launches resulted in catastrophic vehicle failure early in flight, and the program was canceled. Korolev elected to cluster 30 relatively small engines for the first stage, rather than develop a large engine like the Rocketdyne F-1.
The three-stage Saturn V grew over its lifetime to a peak thrust of at least and a lift capacity of to LEO. The AS-510 mission had a liftoff thrust of. The AS-513 mission had slightly greater liftoff thrust of. By comparison, the N-1 had a sea-level liftoff thrust of about. No other operational launch vehicle has surpassed the Saturn V in height, weight, total impulse, or payload capability. The closest contenders were the US Space Shuttle, the Soviet Energia, and the Falcon Heavy vehicle, manufactured by SpaceX.
Saturn V | N1-L3 | |
Diameter, maximum | ||
Height w/ payload | ||
Gross weight | ||
First stage | S-IC | Block A |
Thrust, SL | ||
Burn time, s | 168 | 125 |
Second stage | S-II | Block B |
Thrust, vac | ||
Burn time, s | 384 | 120 |
Orbital insertion stage | S-IVB | Block V |
Thrust, vac | ||
Burn time, s | 147 | 370 |
Total impulse | ·s | ·s |
Orbital payload | ||
Injection velocity | ||
Payload momentum | 2.105 slug-ft/s | 1.6644 slug-ft/s |
Propulsive efficiency | 12.14% | 9.31% |
Earth departure stage | S-IVB | Block G |
Thrust, vac | ||
Burn time, s | 347 | 443 |
Total impulse | ·s | ·s |
Translunar payload | ||
Injection velocity | ||
Payload momentum | 1.1129 slug-ft/s | 5.724 slug-ft/s |
Propulsive efficiency | 6.17% | 3.12% |
U.S. Space Shuttle
The Space Shuttle generated a peak thrust of, and payload capacity to LEO was, which was about 25 percent of the Saturn V's payload. Its total mass in orbit, including the Orbiter, was about, compared to the Apollo 15 total orbital mass of the S-IVB third stage and Apollo spacecraft's, some heavier than the Shuttle was rated to carry to LEO.Soviet Energia/Buran
had a liftoff thrust of. It flew twice in 1987 and 1988, the second time as the launcher for the Buran spacecraft. However, both the Energia and Buran programs were canceled in 1993. Hypothetical future versions of Energia might have been significantly more powerful than the Saturn V, delivering of thrust and being able to deliver up to to LEO in the "Vulkan" configuration. Planned uprated versions of the Saturn V using F-1A engines would have had about 18 percent more thrust and payload. NASA contemplated building larger members of the Saturn family, such as the Saturn C-8, and also unrelated rockets, such as Nova, but these were never produced.Space Launch System
NASA's Space Launch System, planned for its maiden flight in 2021, is planned to be tall with payload in its final configuration, and lift up to into low Earth orbit.Other vehicles
Some other recent US launch vehicles have significantly lower launch capacity to LEO than Saturn V: the US Delta IV Heavy's capacity is, the Atlas V 551 has a capacity of, and the Falcon Heavy vehicle, manufactured by SpaceX, has the maximum payload capacity of. The European Ariane 5 ES delivers up to and the Russian Proton-M can launch.Assembly
After the construction and ground testing of a stage was completed, it was shipped to the Kennedy Space Center. The first two stages were so massive that the only way to transport them was by barge. The S-IC, constructed in New Orleans, was transported down the Mississippi River to the Gulf of Mexico.After rounding Florida, the stages were transported up the Intra-Coastal Waterway to the Vehicle Assembly Building. This was essentially the same route which would be used later by to ship Space Shuttle external tanks. The S-II was constructed in California and traveled to Florida via the Panama Canal. The third stage and Instrument Unit could be carried by the Aero Spacelines Pregnant Guppy and Super Guppy, but could also have been carried by barge if warranted.
Upon arrival at the Vertical Assembly Building, each stage was inspected in a horizontal position before being oriented vertically. NASA also constructed large spool-shaped structures that could be used in place of stages if a particular stage was delayed. These spools had the same height and mass and contained the same electrical connections as the actual stages.
NASA stacked the Saturn V on a Mobile Launcher, which consisted of a Launch Umbilical Tower with nine swing arms, a "hammerhead" crane, and a water suppression system which was activated prior to launch. After assembly was completed, the entire stack was moved from the Vehicle Assembly Building to the launch pad using the Crawler Transporter. Built by the Marion Power Shovel Company, the CT ran on four double-tracked treads, each with 57 "shoes". Each shoe weighed. This transporter was also required to keep the rocket level as it traveled the to the launch site, especially at the 3 percent grade encountered at the launch pad. The CT also carried the Mobile Service Structure, which allowed technicians access to the rocket until eight hours before launch, when it was moved to the "halfway" point on the Crawlerway.
Lunar mission launch sequence
The Saturn V carried all Apollo lunar missions, which were launched from Launch Complex 39 at the John F. Kennedy Space Center in Florida. After the rocket cleared the launch tower, flight control transferred to Mission Control at the Johnson Space Center in Houston, Texas.An average mission used the rocket for a total of just 20 minutes. Although Apollo 6 experienced three engine failures, and Apollo 13 one engine shutdown, the onboard computers were able to compensate by burning the remaining engines longer to achieve parking orbit.
S-IC sequence
The first stage burned for about 2 minutes and 41 seconds, lifting the rocket to an altitude of and a speed of and burning of propellant.At 8.9 seconds before launch, the first stage ignition sequence started. The center engine ignited first, followed by opposing outboard pairs at 300-millisecond intervals to reduce the structural loads on the rocket. When thrust had been confirmed by the onboard computers, the rocket was "soft-released" in two stages: first, the hold-down arms released the rocket, and second, as the rocket began to accelerate upwards, it was slowed by tapered metal pins pulled through dies for half a second.
Once the rocket had lifted off, it could not safely settle back down onto the pad if the engines failed. The astronauts considered this one of the tensest moments in riding the Saturn V, for if the rocket did fail to lift off after release they had a low chance of survival given the large amounts of propellant. A fully fueled Saturn V exploding on the pad would have released the energy equivalent of. To improve safety, the Saturn Emergency Detection System inhibited engine shutdown for the first 30 seconds of flight.
It took about 12 seconds for the rocket to clear the tower. During this time, it yawed 1.25 degrees away from the tower to ensure adequate clearance despite adverse winds; this yaw, although small, can be seen in launch photos taken from the east or west. At an altitude of the rocket rolled to the correct flight azimuth and then gradually pitched down until 38 seconds after second stage ignition. This pitch program was set according to the prevailing winds during the launch month.
The four outboard engines also tilted toward the outside so that in the event of a premature outboard engine shutdown the remaining engines would thrust through the rocket's center of mass. The Saturn V reached at over in altitude. Much of the early portion of the flight was spent gaining altitude, with the required velocity coming later. The Saturn V broke the sound barrier at just over 1 minute at an altitude of between. At this point, shock collars, or condensation clouds, would form around the bottom of the command module and around the top of the second stage.
At about 80 seconds, the rocket experienced maximum dynamic pressure. The dynamic pressure on a rocket varies with air density and the square of relative velocity. Although velocity continues to increase, air density decreases so quickly with altitude that dynamic pressure falls below max q.
Acceleration increased during S-IC flight for three reasons. First, increased acceleration increased the propellant pressure at the engines, increasing the flow rate somewhat. This was the least important factor, though this feedback effect often led to an undesirable thrust oscillation called pogo. Second, as it climbed into thinner air F-1 engine efficiency increased significantly, a property of all rockets. The combined thrust of five engines on the pad was about, reaching nearly at altitude. Third, and most importantly, the rocket's mass rapidly decreased.
The propellant in just the S-IC made up about three-quarters of Saturn V's entire launch mass, and it was consumed at. Newton's second law of motion states that force is equal to mass multiplied by acceleration, or equivalently that acceleration is equal to force divided by mass, so as the mass decreased, acceleration rose. Including gravity, launch acceleration was only g, i.e., the astronauts felt g while the rocket accelerated vertically at g. As the rocket rapidly lost mass, total acceleration including gravity increased to nearly 4 g at T+135 seconds. At this point, the inboard engine was shut down to prevent acceleration from increasing beyond 4 g.
When oxidizer or fuel depletion was sensed in the suction assemblies, the remaining four outboard engines were shut down. First stage separation occurred a little less than one second after this to allow for F-1 thrust tail-off. Eight small solid fuel separation motors backed the S-IC from the rest of the vehicle at an altitude of about. The first stage continued ballistically to an altitude of about and then fell in the Atlantic Ocean about downrange.
The engine shutdown procedure was changed for the launch of Skylab to avoid damage to the Apollo Telescope Mount. Rather than shutting down all four outboard engines at once, they were shut down two at a time with a delay to reduce peak acceleration further.
S-II sequence
After S-IC separation, the S-II second stage burned for 6 minutes and propelled the craft to and, close to orbital velocity.For the first two uncrewed launches, eight solid-fuel ullage motors ignited for four seconds to accelerate the S-II stage, followed by the ignition of the five J-2 engines. For the first seven crewed Apollo missions only four ullage motors were used on the S-II, and they were eliminated completely for the final four launches. About 30 seconds after first stage separation, the interstage ring dropped from the second stage. This was done with an inertially fixed attitude—orientation around its center of gravity—so that the interstage, only from the outboard J-2 engines, would fall cleanly without hitting them, as the interstage could have potentially damaged two of the J-2 engines if it was attached to the S-IC. Shortly after interstage separation the Launch Escape System was also jettisoned.
About 38 seconds after the second stage ignition the Saturn V switched from a preprogrammed trajectory to a "closed loop" or Iterative Guidance Mode. The instrument unit now computed in real time the most fuel-efficient trajectory toward its target orbit. If the instrument unit failed, the crew could switch control of the Saturn to the command module's computer, take manual control, or abort the flight.
About 90 seconds before the second stage cutoff, the center engine shut down to reduce longitudinal pogo oscillations. At around this time, the LOX flow rate decreased, changing the mix ratio of the two propellants and ensuring that there would be as little propellant as possible left in the tanks at the end of second stage flight. This was done at a predetermined delta-v.
Five level sensors in the bottom of each S-II propellant tank were armed during S-II flight, allowing any two to trigger S-II cutoff and staging when they were uncovered. One second after the second stage cut off it separated and several seconds later the third stage ignited. Solid fuel retro-rockets mounted on the interstage at the top of the S-II fired to back it away from the S-IVB. The S-II impacted about from the launch site.
On the Apollo 13 mission, the inboard engine suffered from major pogo oscillation, resulting in an early automatic cutoff. To ensure sufficient velocity was reached, the remaining four engines were kept active for longer than planned. A pogo suppressor was fitted to later Apollo missions to avoid this, though the early engine 5 cutoff remained to reduce g-forces.
S-IVB sequence
Unlike the two-plane separation of the S-IC and S-II, the S-II and S-IVB stages separated with a single step. Although it was constructed as part of the third stage, the interstage remained attached to the second stage.During Apollo 11, a typical lunar mission, the third stage burned for about 2.5 minutes until first cutoff at 11 minutes 40 seconds. At this point it was downrange and in a parking orbit at an altitude of and velocity of. The third stage remained attached to the spacecraft while it orbited the Earth one and a half times while astronauts and mission controllers prepared for translunar injection.
rocket stage, shortly after transposition and docking with the Lunar Module
This parking orbit was quite low by Earth orbit standards, and it would have been short-lived due to aerodynamic drag. This was not a problem on a lunar mission because of the short stay in the parking orbit. The S-IVB also continued to thrust at a low level by venting gaseous hydrogen, to keep propellants settled in their tanks and prevent gaseous cavities from forming in propellant feed lines. This venting also maintained safe pressures as liquid hydrogen boiled off in the fuel tank. This venting thrust easily exceeded aerodynamic drag.
For the final three Apollo flights, the temporary parking orbit was even lower, to increase payload for these missions. The Apollo 9 Earth orbit mission was launched into the nominal orbit consistent with Apollo 11, but the spacecraft were able to use their own engines to raise the perigee high enough to sustain the 10-day mission. The Skylab was launched into a quite different orbit, with a perigee which sustained it for six years, and also a higher inclination to the equator.
On Apollo 11, TLI came at 2 hours and 44 minutes after launch. The S-IVB burned for almost six minutes giving the spacecraft a velocity close to the Earth's escape velocity of. This gave an energy-efficient transfer to lunar orbit, with the Moon helping to capture the spacecraft with a minimum of CSM fuel consumption.
About 40 minutes after TLI the Apollo command and service module separated from the third stage, turned 180 degrees, and docked with the Lunar Module that rode below the CSM during launch. The CSM and LM separated from the spent third stage 50 minutes later. This process is known as Transposition, docking, and extraction.
If it were to remain on the same trajectory as the spacecraft, the S-IVB could have presented a collision hazard so its remaining propellants were vented and the auxiliary propulsion system fired to move it away. For lunar missions before Apollo 13, the S-IVB was directed toward the Moon's trailing edge in its orbit so that the Moon would slingshot it beyond earth escape velocity and into solar orbit. From Apollo 13 onwards, controllers directed the S-IVB to hit the Moon. Seismometers left behind by previous missions detected the impacts, and the information helped map the internal structure of the Moon.
On September 3, 2002, astronomer Bill Yeung discovered a suspected asteroid, which was given the discovery designation J002E3. It appeared to be in orbit around the Earth, and was soon discovered from spectral analysis to be covered in white titanium dioxide, which was a major constituent of the paint used on the Saturn V. Calculation of orbital parameters led to tentative identification as being the Apollo 12 S-IVB stage. Mission controllers had planned to send Apollo 12's S-IVB into solar orbit after separating from the Apollo spacecraft, but it is believed the burn lasted too long, and hence did not send it close enough to the Moon, remaining in a barely stable orbit around the Earth and Moon. In 1971, through a series of gravitational perturbations, it is believed to have entered in a solar orbit and then returned into weakly captured Earth orbit 31 years later. It left Earth orbit again in June 2003.
Skylab
In 1965, the Apollo Applications Program was created to look into science missions that could be performed using Apollo hardware. Much of the planning centered on the idea of a space station. Wernher von Braun's earlier plans employed a "wet workshop" concept, with a spent S-II Saturn V second stage being launched into orbit and outfitted in space. The next year AAP studied a smaller station using the Saturn IB second stage. By 1969, Apollo funding cuts eliminated the possibility of procuring more Apollo hardware, and in fact forced the cancellation of some later Moon landing flights. This freed up at least one Saturn V, allowing the wet workshop to be replaced with the "dry workshop" concept: the station would be built on the ground from a surplus Saturn IB second stage and launched atop the first two live stages of a Saturn V. A backup station, constructed from a Saturn V third stage, was built and is now on display at the National Air and Space Museum.Skylab was the only launch not directly related to the Apollo lunar landing program. The only significant changes to the Saturn V from the Apollo configurations involved some modification to the S-II to act as the terminal stage for inserting the Skylab payload into Earth orbit, and to vent excess propellant after engine cutoff so the spent stage would not rupture in orbit. The S-II remained in orbit for almost two years, and made an uncontrolled re-entry on January 11, 1975.
Three crews lived aboard Skylab from May 25, 1973, to February 8, 1974. Skylab remained in orbit until July 11, 1979.
Proposed post-Apollo developments
After Apollo, the Saturn V was planned to be the prime launch vehicle for Prospector, a proposed robotic rover, to be launched to the Moon, similar to the Soviet Lunokhod rovers Lunokhod 1 and Lunokhod 2; the Voyager Mars probes; and a scaled-up version of the Voyager interplanetary probes. It was also to have been the launch vehicle for the nuclear rocket stage RIFT test program and the later NERVA. All of these planned uses of the Saturn V were cancelled, with cost being a major factor. Edgar Cortright, who had been the director of NASA Langley, stated decades later that "JPL never liked the big approach. They always argued against it. I probably was the leading proponent in using the Saturn V, and I lost. Probably very wise that I lost."The canceled second production run of Saturn Vs would very likely have used the F-1A engine in its first stage, providing a substantial performance boost. Other likely changes would have been the removal of the fins, a stretched S-IC first stage to support the more powerful F-1As, and uprated J-2s or an M-1 for the upper stages..
A number of alternate Saturn vehicles were proposed based on the Saturn V, ranging from the Saturn INT-20 with an S-IVB stage and interstage mounted directly onto an S-IC stage, through to the Saturn V-23 which would not only have five F-1 engines in the first stage, but also four strap-on boosters with two F-1 engines each: giving a total of thirteen F-1 engines firing at launch.
Lack of a second Saturn V production run killed this plan and left the United States without a super heavy-lift launch vehicle. Some in the U.S. space community came to lament this situation, as continued production would have allowed the International Space Station, using a Skylab or Mir configuration with both U.S. and Russian docking ports, to be lifted with just a handful of launches. The Saturn-Shuttle concept also would have eliminated the Space Shuttle Solid Rocket Boosters that ultimately precipitated the Challenger accident in 1986.
Cost
From 1964 until 1973, $6.417 billion in total was appropriated for the Research and Development and flights of the Saturn V, with the maximum being in 1966 with $1.2 billion. That same year, NASA received its biggest budget of $4.5 billion, about 0.5 percent of the gross domestic product of the United States at that time.Two of the largest reasons for the cancellation of the last three Apollo missions were the heavy investments in Saturn V and the Vietnam War continuing to require ever increasing amounts of money and resources from the U.S. In the time frame from 1969 to 1971 the cost of launching a Saturn V Apollo mission was between $185,000,000 to $189,000,000, of which $110 million were used for the production of the vehicle.
Saturn V vehicles and launches
Proposed successors
U.S. proposals for a rocket larger than the Saturn V from the late 1950s through the early 1980s were generally called Nova. Over thirty different large rocket proposals carried the Nova name, but none were developed.Wernher von Braun and others also had plans for a rocket that would have featured eight F-1 engines in its first stage, like the Saturn C-8, allowing a direct ascent flight to the Moon. Other plans for the Saturn V called for using a Centaur as an upper stage or adding strap-on boosters. These enhancements would have enabled the launch of large robotic spacecraft to the outer planets or send astronauts to Mars. Other Saturn V derivatives analyzed included the Saturn MLV family of "Modified Launch Vehicles", which would have almost doubled the payload lift capability of the standard Saturn V and were intended for use in a proposed mission to Mars by 1980.
In 1968, Boeing studied another Saturn-V derivative, the Saturn C-5N, which included a nuclear thermal rocket engine for the third stage of the vehicle. The Saturn C-5N would carry a considerably greater payload for interplanetary spaceflight. Work on the nuclear engines, along with all Saturn V ELVs, ended in 1973.
The Comet HLLV was a massive heavy lift launch vehicle designed for the First Lunar Outpost program which was in the design phase from 1992–1993 under the Space Exploration Initiative. It was a Saturn V derived launch vehicle with over twice the payload capability and would have relied completely on existing technology. All of the engines were modernized versions of their Apollo counterparts and the fuel tanks would be stretched. Its main goal was to support the First Lunar Outpost program and future manned Mars missions. It was designed to be as cheap and easy to operate as possible.
In 2006, as part of the proposed Constellation program, NASA unveiled plans to construct two Shuttle Derived Launch Vehicles, the Ares I and Ares V, which would use some existing Space Shuttle and Saturn V hardware and infrastructure. The two rockets were intended to increase safety by specializing each vehicle for different tasks, Ares I for crew launches and Ares V for cargo launches. The original design of the heavy-lift Ares V, named in homage to the Saturn V, was in height and featured a core stage based on the Space Shuttle External Tank, with a diameter of. It was to be powered by five RS-25s and two five-segment Space Shuttle Solid Rocket Boosters. As the design evolved, the RS-25 engines were replaced with five RS-68 engines, the same engines used on the Delta IV. The switch from the RS-25 to the RS-68 was intended to reduce cost, as the latter was cheaper, simpler to manufacture, and more powerful than the RS-25, though the lower efficiency of the RS-68 required an increase in core stage diameter to, the same diameter as the Saturn V's S-IC and S-II stages.
In 2008, NASA again redesigned the Ares V, lengthening the core stage, adding a sixth RS-68 engine, and increasing the SRBs to 5.5 segments each. This vehicle would have been tall and would have produced a total thrust of approximately at liftoff, more than the Saturn V or the Soviet Energia, but less than the Soviet N-1. Projected to place approximately into orbit, the Ares V would have surpassed the Saturn V in payload capability. An upper stage, the Earth Departure Stage, would have utilized a more advanced version of the J-2 engine, the J-2X. Ares V would have placed the Altair lunar landing vehicle into low Earth orbit. An Orion crew vehicle launched on Ares I would have docked with Altair, and the Earth Departure Stage would then send the combined stack to the Moon.
After the cancellation of the Constellation program – and hence Ares I and Ares V – NASA announced the Space Launch System heavy-lift launch vehicle for beyond low Earth orbit space exploration. The SLS, similar to the original Ares V concept, will be powered by four RS-25 engines and two five-segment SRBs. Its Block 1 configuration will lift approximately to LEO. Block 1B will add the Exploration Upper Stage, powered by four RL10 engines, to increase payload capacity. An eventual Block 2 variant will upgrade to advanced boosters, increasing LEO payload to at least.
One proposal for advanced boosters would use a derivative of the Saturn V's F-1, the F-1B, and increase SLS payload to around to LEO. The F-1B is to have better specific impulse and be cheaper than the F-1, with a simplified combustion chamber and fewer engine parts, while producing of thrust at sea level, an increase over the approximate achieved by the mature Apollo 15 F-1 engine,
NASA SLS deputy project manager Jody Singer of the Marshall Space Flight Center in Huntsville, in 2012 stated that the vehicle will have a launch cost of approximately $500 million per launch, with a relatively minor dependence of costs on launch capability.
Saturn V displays
- Two at the U.S. Space & Rocket Center in Huntsville:
- *SA-500D is on horizontal display made up of its S-IC-D, S-II-F/D and S-IVB-D. These were all test stages not meant for flight. This vehicle was displayed outdoors from 1969 to 2007, was restored, and is now displayed in the Davidson Center for Space Exploration.
- * Vertical display built in 1999 located in an adjacent area.
- One at the Johnson Space Center made up of the first stage from SA-514, the second stage from SA-515, and the third stage from SA-513. With stages arriving between 1977 and 1979, this was displayed in the open until its 2005 restoration when a structure was built around it for protection. This is the only display Saturn consisting entirely of stages intended to be launched.
- One at the Kennedy Space Center Visitor Complex, made up of S-IC-T and the second and third stages from SA-514. It was displayed outdoors for decades, then in 1996 was enclosed for protection from the elements in the Apollo/Saturn V Center.
- The S-IC stage from SA-515 is on display at the Infinity Science Center in Mississippi.
- The S-IVB stage from SA-515 was converted for use as a backup for Skylab, and is on display at the National Air and Space Museum in Washington, D.C.
Media
Saturn V in fiction
Film footage of the Saturn V appears in the TV episode "", originally broadcast on March 29, 1968. Saturn V and the Apollo program are not mentioned by name, but the rocket was used as a stand-in for the launching of a fictional "orbital nuclear warhead platform by the United States, countering a similar launch by other powers". Pre-launch footage comes from the unflown SA-500F Facilities Integration Vehicle and Apollo 6, while launch footage comes from Apollo 4NASA sites