Delta IV


Delta IV is a group of five expendable launch systems in the Delta rocket family introduced in the early 2000s. Originally designed by Boeing's Defense, Space & Security division for the Evolved Expendable Launch Vehicle program, the Delta IV became a United Launch Alliance product in 2006. The Delta IV is primarily a launch vehicle for United States Air Force military payloads, but has also been used to launch a number of U.S. government non-military payloads and a single commercial satellite.
The Delta IV originally had two main versions which allowed the family to cover a range of payload sizes and masses: the retired Medium and Heavy. As of 2019, only the Heavy remains active, with payloads that would previously fly on Medium moving to either the existing Atlas V or the forthcoming Vulcan. Retirement of the Delta IV is anticipated in 2024.
Delta IV vehicles are built in the ULA facility in Decatur, Alabama. Final assembly is completed at the launch site by ULA: at the Horizontal Integration Facility for launches from SLC-37B pad at Cape Canaveral and in a similar facility for launches from SLC-6 pad at Vandenberg Air Force Base.

History

The latest evolutionary development of the Delta rocket family, Delta IV was introduced to meet the requirements of the United States Air Force's Evolved Expendable Launch Vehicle program. While the Delta IV retains the name of the Delta family of rockets, major changes were incorporated. Perhaps the most significant change was the switch from kerosene to liquid hydrogen fuel, with new tankage and a new engine required.
During the Delta IV's development, a Small variant was considered. This would have featured the Delta II second stage, an optional Thiokol Star 48B third stage, and the Delta II payload fairing, all atop a single Common Booster Core. The Small variant was dropped by 1999.
In 2002, the Delta IV was first launched, with the RS-68 becoming the first large liquid-propellant rocket engine designed in the U.S. since the Space Shuttle main engine in the 1970s. The primary goal for the RS-68 was to reduce cost versus the SSME. Some sacrifice in chamber pressure and specific impulse was made, hurting efficiency; however, development time, part count, total cost, and assembly labor were reduced to a fraction of the SSME, despite the RS-68's significantly larger size.
The L3 Technologies Redundant Inertial Flight Control Assembly guidance system originally used on the Delta IV was common to that carried on the Delta II, although the software was different because of the differences between the Delta II and Delta IV. The RIFCA featured six ring laser gyroscopes and accelerometers each, to provide a higher degree of reliability.
Boeing initially intended to market Delta IV commercial launch services. However, the Delta IV entered the space launch market when global capacity was already much higher than demand. Furthermore, as an unproven design it had difficulty finding a market in commercial launches, and Delta IV launch costs are higher than comparable vehicles of the same era. In 2003, Boeing pulled the Delta IV from the commercial market, citing low demand and high costs. In 2005, Boeing stated that it sought to return the Delta IV to commercial service.
As of 2009, the USAF funded Delta IV EELV engineering, integration, and infrastructure work through contracts with Boeing Launch Services. On August 8, 2008, the USAF Space and Missile Systems Center increased the "cost plus award fee" contract with BLS for $1.656 billion to extend the period of performance through the. In addition a $557.1 million option was added to cover FY10. However, the Delta IV series was at that time launched by the United Launch Alliance, a joint venture between Boeing and Lockheed Martin.
In February 2010, naturalized citizen Dongfan Chung, an engineer working with Boeing, was the first person convicted under the Economic Espionage Act of 1996. Chung passed on classified information on designs including the Delta IV rocket and was sentenced to 15 years.
In March 2015, ULA announced plans to phase out the Delta IV Medium by 2018. The Delta IV will be replaced by the Atlas V in the near term and Vulcan in the far term. The Delta IV Medium was actually retired on 22 August 2019.
With the exception of the first launch, which carried the Eutelsat W5 commercial communications satellite, all Delta IV launches have been paid for by the US government. In 2015, ULA stated that a Delta IV Heavy is sold for nearly $400 million.

RS-68A booster engine upgrade

The possibility of a higher performance Delta IV was first proposed in a 2006 RAND Corporation study of national security launch requirements out to 2020. A single National Reconnaissance Office payload required an increase in the lift capability of the Delta IV Heavy. Lift capacity was increased by developing the higher-performance RS-68A engine, which first flew on June 29, 2012. ULA phased out the baseline RS-68 engine with the launch of Delta flight 371 on March 25, 2015. All following launches have used the RS-68A, and the engine's higher thrust allowed the use of a single standardized CBC design for all Delta IV Medium and M+ versions. This upgrade reduced cost and increased flexibility, since any standardized CBC could be configured for zero, two, or four solid boosters. However, the new CBC led to a slight performance loss for most medium configurations. The Delta IV Heavy still requires non-standard CBCs for the core and boosters.
Payload capacities after RS-68A upgrade
VersionFairingCBCsSRBsPayload to LEO
407 km x 51.6°
Payload to GTO
1800 m/s residual
Launches to date
Medium4 m108,510 kg4,440 kg0
M+4 m1212,000 kg6,390 kg2
M+5 m1210,220 kg5,490 kg2
M+5 m1412,820 kg7,300 kg4
Heavy5 m3025,980 kg14,220 kg4

Payload capacities with original RS-68

Version

Fairing

CBCs

SRBs

Payload to LEO
407 km x 51.6°

Payload to GTO
1800 m/s residual

Launches to date
Medium4 m108,800 kg4,540 kg3
M+4 m1211,920 kg6,270 kg13
M+5 m1210,580 kg5,430 kg1
M+5 m1413,450 kg7,430 kg4
Heavy5 m3022,980 kg13,400 kg7

*Masses include a Payload Attach Fitting.

Proposed upgrades that were not implemented

Possible future upgrades for the Delta IV included adding extra strap-on solid motors, higher-thrust main engines, lighter materials, higher-thrust second stages, more strap-on CBCs, and a cryogenic propellant cross feed from strap on boosters to the common core.
At one point NASA planned to use Delta IV or Atlas V to launch the proposed Orbital Space Plane, which eventually became the Crew Exploration Vehicle and then the Orion. Orion was intended to fly on the Ares I launch vehicle, then the Space Launch System after Ares I was cancelled.
In 2009 The Aerospace Corporation reported on NASA results of a study to determine the feasibility of modifying Delta IV to be human-rated for use in NASA human spaceflight missions. According to Aviation Week the study, "found that a Delta IV heavy could meet NASA's requirements for getting humans to low Earth orbit."
A proposed upgrade to the Delta IV family was the addition of extra solid motors. The Medium+ would have used existing mount points to pair the four GEM-60s of the M+ with the upper stage and fairing of the. An M+ would have had a GTO payload of 7,500 kg, a LEO payload of 14,800 kg, and could have been available within 36 months of the first order. It was also considered to add extra GEM-60s to the M+, which would have required adding extra attachment points, structural changes to cope with the different flight loads, and launch pad and infrastructure changes. The Medium+ and would have flown with six and eight SRBs respectively, for a maximum of up to 9,200 kg/20,200 lb to GTO with the M+. The Medium+ and could have been available within 48 months of the first order.

Planned successor

The Vulcan rocket is planned to replace the Atlas V and Delta IV rockets. Vulcan is projected to enter service by 2021, using the Blue Origin BE-4 methane-fueled rocket engine. The Delta IV Heavy and Atlas V are expected to stay in service for a few years after Vulcan's inaugural launch, and the Heavy is expected to be discontinued by 2024.

Vehicle description

Delta IV Medium

The Delta IV Medium was available in four configurations: Medium, Medium+, Medium+, and Medium+.
The Delta IV Medium was the most basic Delta IV. It featured a single CBC and a modified Delta III second stage, with 4-meter liquid hydrogen and liquid oxygen tanks and a 4-meter payload fairing. The Delta IV Medium was capable of launching 4,200 kg to geosynchronous transfer orbit. From Cape Canaveral, GTO is 1804 m/s away from GEO. The mass of fairing and payload attach fittings have been subtracted from the gross performance. It flew last time on 22 August 2019.
The Delta IV Medium+ had the same CBC and DCSS as the Medium, but with the addition of two Orbital ATK-built 1.5-m diameter solid rocket booster Graphite-Epoxy Motors strap-on boosters to increase payload capacity to 6,150 kg to GTO.
The Delta IV Medium+ was similar to the Medium+, but had a 5-m–diameter DCSS and payload fairing for larger payloads. Because of the extra weight of the larger payload fairing and second stage, the Medium+ could launch 5,072 kg to GTO.
The Delta IV Medium+ was similar to the Medium+, but used four GEM-60s instead of two, enabling it to lift 6,882 kg to GTO.
To encapsulate the satellite payload, a variety of different payload fairings were available. A stretched Delta III 4 meter diameter composite payload fairing was used on 4 meter Medium versions, while an enlarged, 5 meter diameter composite fairing was used on 5 meter Medium versions.

Delta IV Heavy

The Delta IV Heavy combines a diameter DCSS and payload fairing with two additional CBCs. These are strap-on boosters which are separated earlier in the flight than the center CBC. As of 2007, a longer 5 meter diameter composite fairing was standard on the Delta IV Heavy, with an aluminum isogrid fairing also available. The aluminum trisector fairing was built by Boeing and derived from a Titan IV fairing. The trisector fairing was first used on the DSP-23 flight. The Delta IV with the extended fairing is over tall.

Common Booster Core

Each Delta IV consists of at least one Common Booster Core. Each CBC is powered by one Aerojet Rocketdyne RS-68 engine, which burns liquid hydrogen and liquid oxygen.
On flights of the Medium, the RS-68 ran at 102% rated thrust for the first few minutes of flight, and then throttled down to 58% rated thrust before main engine cutoff. On the Heavy, the main CBC's engine throttles down to 58% rated thrust around 50 seconds after liftoff, while the strap-on CBCs remain at 102%. This conserves propellant and allows the main CBC to burn after booster separation. After the strap-on CBCs separate, the main CBC's engine again throttles up to 102% before throttling back down to 58% prior to main engine cutoff.
The RS-68 engine is mounted to the lower thrust structure of the CBC by a four-legged thrust frame and enclosed in a protective composite conical thermal shield. Above the thrust structure is an aluminum isogrid liquid hydrogen tank, followed by a composite cylinder called the centerbody, an aluminum isogrid liquid oxygen tank, and a forward skirt. Along the back of the CBC is a cable tunnel to hold electrical and signal lines, and a feedline to carry the liquid oxygen to the RS-68 from the tank. The CBC is of a constant, 5-meter diameter.

Delta Cryogenic Second Stage

The upper stage of the Delta IV is the Delta Cryogenic Second Stage. The DCSS is based on the Delta III upper stage but has increased propellant capacity. Two versions have been produced: a 4-meter diameter DCSS that was retired with the Delta IV Medium and a 5-meter diameter DCSS that remains in service with the Delta IV Heavy. The 4 m diameter version lengthened both Delta III propellant tanks, while the 5-meter version has an extended diameter liquid hydrogen tank and a further lengthened liquid oxygen tank. Regardless of the diameter, each DCSS is powered by one RL10B2 engine, with an extendable carbon-carbon nozzle to improve specific impulse. Two different interstages are used to mate the first stage and DCSS. A tapering interstage that narrowed down from 5 m to 4 m diameter was used to mate the 4 m DCSS to the CBC, while a cylindrical interstage is used to mate the 5 m DCSS. Both interstages were built from composites and enclosed the liquid oxygen tank, with the larger liquid hydrogen tank making up part of the vehicle's outer mold line.

Launch sites

Delta IV launches occur from either of two rocket launch complexes. Launches on the East coast of the United States use Space Launch Complex 37 at the Cape Canaveral Air Force Station. On the West coast, polar-orbit and high-inclination launches use Vandenberg Air Force Base's Space Launch Complex 6.
Launch facilities at both sites are similar. A Horizontal Integration Facility is situated some distance from the pad. Delta IV CBCs and second stages to be mated and tested in the HIF before they are moved to the pad. The partial horizontal rocket assembly of the Delta IV is somewhat similar to the Soyuz launch vehicle, which is completely assembled horizontally. The Space Shuttles, the past Saturn launch vehicles, and the upcoming Space Launch System are assembled and rolled out to the launch pad entirely vertically.
Movement of the Delta IVs among the various facilities at the pad is facilitated by rubber-tired Elevating Platform Transporters and various transport jigs. Diesel engine EPTs are used for moving the vehicles from the HIF to the pad, while electric EPTs are used in the HIF, where precision of movement is important.
The basic launchpad structure includes a flame trench to direct the engine plume away from the rocket, lightning protection, and propellant storage. In the case of Delta IV, the vehicle is completed on the launch pad inside a building. This Mobile Service Tower provides service access to the rocket and protection from the weather and is rolled away from the rocket on launch day. A crane at the top of the MST lifts the encapsulated payload to the vehicle and also attached the GEM-60 solid motors for Delta IV Medium launches. The MST is rolled away from the rocket several hours before launch. At Vandenberg, the launch pad also has a Mobile Assembly Shelter, which completely encloses the vehicle; at CCAFS, the vehicle is partly exposed near its bottom.
Beside the vehicle is a Fixed Umbilical Tower, which has two or three swing arms. These arms carry telemetry signals, electrical power, hydraulic fluid, environmental control air flow, and other support functions to the vehicle through umbilical lines. The swing arms retract at T-0 seconds once the vehicle is committed to launch.
Under the vehicle is a Launch Table, with six Tail Service Masts, two for each CBC. The Launch Table supports the vehicle on the pad, and the TSMs provide further support and fueling functions for the CBCs. The vehicle is mounted to the Launch Table by a Launch Mate Unit, which is attached to the vehicle by bolts that sever at launch. Behind the Launch Table is a Fixed Pad Erector, which uses two long-stroke hydraulic pistons to raise the vehicle to the vertical position after being rolled to the pad from the Horizontal Integration Facility. Beneath the Launch Table is a flame duct, which deflects the rocket's exhaust away from the rocket or facilities.

Vehicle processing

Delta IV CBCs and DCSSs are assembled at ULA's factory in Decatur, Alabama. They are then loaded onto the M/V Delta Mariner, a roll-on/roll-off cargo vessel, and shipped to either launch pad. There, they are offloaded and rolled into a Horizontal Integration Facility. For Delta IV Medium launches, the CBC and DCSS were mated in the HIF. For Delta IV Heavy launches, the port and starboard strap-on CBCs are also mated in the HIF.
Various tests are performed, and then the vehicle is rolled horizontally to the pad, where the Fixed Pad Erector is used to raise the vehicle to the vertical position. At this time, the GEM-60 solid motors, if any are required, are rolled to the pad and attached to the vehicle. After further testing, the payload is transported to the pad, hoisted into the MST by a crane, and attached to the vehicle. Finally, on launch day, the MST is rolled away from the vehicle, and the vehicle is ready for launch.

Delta IV launches in chronological order

No.Date/Time
TypeSerial no.Start placePayloadPayload typeOrbitOutcomeRemarks
12002-11-20
22:39
Medium+293Eutelsat W5Commercial communications satelliteGTOFirst Delta IV launch
22003-03-11
00:59
Medium296CCAFS SLC-37BUSA-167 Military communications satelliteGTOFirst Delta IV Medium launch
First USAF EELV mission
32003-08-29
23:13
Medium301CCAFS SLC-37BUSA-170 Military communications satelliteGTO
42004-12-21
21:50
Heavy310CCAFS SLC-37BDemoSat / 3CS-1 / 3CS-2Demonstration payloadGSO
  • First Delta IV Heavy launch
  • Premature cutoff of CBCs
  • DemoSat reached incorrect orbit, 3CS failed to reach orbit
52006-05-24
22:11
Medium+315CCAFS SLC-37BGOES 13 Weather satelliteGTO
62006-06-28
03:33
Medium+317VAFB SLC-6USA-184 Reconnaissance satelliteMolniyaFirst Delta IV launch from Vandenberg
72006-11-04
13:53
Medium320VAFB SLC-6USA-192 Military weather satelliteSSOFirst Delta IV launch into a LEO/SSO, last flight of Delta IV Medium
82007-11-11
01:50
Heavy329CCAFS SLC-37BUSA-197 Missile warning satelliteGSOFirst Delta IV launch contracted by United Launch AllianceLaunch delayed due to damage to launch pad caused by a liquid oxygen leak
92009-01-18
02:47
Heavy337CCAFS SLC-37BUSA-202 Reconnaissance satelliteGSO
102009-06-27
22:51
Medium+342CCAFS SLC-37BGOES 14 Weather satelliteGTO
112009-12-06
01:47
Medium+346CCAFS SLC-37BUSA-211 Military communications satelliteGTOFirst Delta IV Medium+ launch
122010-03-04
23:57
Medium+348CCAFS SLC-37BGOES 15 Weather satelliteGTO
132010-05-28
03:00
Medium+349CCAFS SLC-37BUSA-213 Navigation SatelliteMEO
142010-11-21
22:58
Heavy351CCAFS SLC-37BUSA-223 Reconnaissance satelliteGSO
152011-01-20
21:10
Heavy352VAFB SLC-6USA-224 Reconnaissance satelliteLEOFirst Delta IV Heavy launch from Vandenberg
162011-03-11
23:38
Medium+353CCAFS SLC-37BUSA-227 Reconnaissance satelliteGTO
172011-07-16
06:41
Medium+355CCAFS SLC-37BUSA-232 Navigation SatelliteMEO
182012-01-20
00:38
Medium+358CCAFS SLC-37BUSA-233 Military communications satelliteGTO
192012-04-03
23:12
Medium+359VAFB SLC-6USA-234 Reconnaissance satelliteLEOFirst flight in the Medium+ version
202012-06-29
13:15
Heavy360CCAFS SLC-37BUSA-237 Reconnaissance satelliteGSOFirst flight of the RS-68A engine
212012-10-04
12:10
Medium+361CCAFS SLC-37BUSA-239 Navigation SatelliteMEOUpper stage anomaly caused by fuel leak, payload still reached planned orbit
222013-05-25
00:27
Medium+362CCAFS SLC-37BUSA-243 Military communications satelliteGTO
232013-08-08
00:29
Medium+363CCAFS SLC-37BUSA-244 Military communications satelliteGTO
242013-08-28
18:03
Heavy364VAFB SLC-6USA-245 Reconnaissance satelliteLEO
252014-02-21
01:59
Medium+365CCAFS SLC-37BUSA-248 Navigation SatelliteMEO
262014-05-17
00:03
Medium+366CCAFS SLC-37BUSA-251 Navigation SatelliteMEO
272014-07-28
23:28
Medium+368CCAFS SLC-37BAFSPC-4 Space surveillance and technology demonstratorGEOFirst use of secondary payload adapter on a Delta rocket
282014-12-05
12:05
Heavy369CCAFS SLC-37BOrion MPCV EFT-1Uncrewed Capsule Test FlightMEO
292015-03-25
18:36
Medium+371CCAFS SLC-37BUSA-260 Navigation SatelliteMEOFinal launch with baseline RS-68 engine
302015-07-24
00:07
Medium+372CCAFS SLC-37BUSA-263 Military communications satelliteGTO
312016-02-10
11:40
Medium+373VAFB SLC-6USA-267 Reconnaissance satelliteLEO
322016-06-11
17:51
Heavy374CCAFS SLC-37BUSA-268 Reconnaissance satelliteGSO
332016-08-19
04:52
Medium+375CCAFS SLC-37BAFSPC-6 Space surveillanceGEO
342016-12-07
23:53
Medium+376CCAFS SLC-37BUSA-272 Military communications satelliteGTO
352017-03-19
00:18
Medium+377CCAFS SLC-37BUSA-275 Military communications satelliteGTO
362018-01-12
22:11
Medium+379VAFB SLC-6USA-281 Reconnaissance satelliteLEOFinal flight of Delta IV M+ variant
372018-08-12
07:31
Heavy380CCAFS SLC-37BParker Solar ProbeSolar ProbeHeliocentricFirst use of Delta IV Heavy with Star 48BV third stage
382019-01-19
19:10
Heavy382VAFB SLC-6USA-290 Reconnaissance satelliteLEO
392019-03-16
00:26
Medium+383CCAFS SLC-37BUSA-291 Military communications satelliteGTOFinal flight of Delta IV M+ variant
402019-08-22
13:06
Medium+384CCAFS SLC-37BUSA-293 Navigation SatelliteMEOFinal flight of the Delta IV Medium and the Delta IV M+ variant

This list was last updated on August 22, 2019. For future launches, see List of Thor and Delta launches.

Notable launches

The first payload launched with a Delta IV was the Eutelsat W5 communications satellite. A Medium+ from Cape Canaveral carried the communications satellite into geostationary transfer orbit on 20 November 2002.
Heavy Demo was the first launch of the Delta IV Heavy in December 2004 after significant delays due to bad weather. Due to cavitation in the propellant lines, sensors on all three CBCs registered depletion of propellant. The strap-on CBCs and then core CBC engines shut down prematurely, even though sufficient propellant remained to continue the burn as scheduled. The second stage attempted to compensate for the shutdown and burned until it ran out of propellant. This flight was a test launch carrying a payload of:
NROL-22 was the first Delta IV launched from SLC-6 at Vandenberg Air Force Base. It was launched aboard a Medium+ in June 2006 carrying a classified satellite for the U.S. National Reconnaissance Office.
DSP-23 was the first launch of a valuable payload aboard a Delta IV Heavy. This was also the first Delta IV launch contracted by the United Launch Alliance, a joint venture between Boeing and Lockheed Martin. The main payload was the 23rd and final Defense Support Program missile-warning satellite, DSP-23. Launch from Cape Canaveral occurred on November 10, 2007.
NROL-26 was the first Delta IV Heavy EELV launch for the NRO. USA 202, a classified reconnaissance satellite, lifted off 18 January 2009.
NROL-32 was a Delta IV Heavy launch, carrying a satellite for NRO. The payload is speculated to be the largest satellite sent into space. After a delay from 19 October 2010, the rocket lifted off on 21 November 2010.
NROL-49 lifted off from Vandenberg AFB on January 20, 2011. It was the first Delta IV Heavy mission to be launched out of Vandenberg. This mission was for the NRO and its details are classified.
On October 4, 2012, a Delta IV M+ experienced an anomaly in the upper stage's RL10B-2 engine which resulted in lower than expected thrust. While the vehicle had sufficient fuel margins to successfully place the payload, a GPS Block IIF satellite USA-239, into its targeted orbit, investigation into the glitch delayed subsequent Delta IV launches and the next Atlas V launch due to commonality between the engines used on both vehicles' upper stages. By December 2012, ULA had determined the cause of the anomaly to be a fuel leak, and Delta IV launches resumed in May 2013. After two more successful launches, further investigation led to the delay of Delta flight 365 with the GPS IIF-5 satellite. Originally scheduled to launch in October 2013, the vehicle lifted off on February 21, 2014.
A Delta IV Heavy launched the Orion spacecraft on an uncrewed test flight, EFT-1, on December 5, 2014. The launch was originally planned for December 4, but high winds and valve issues caused the launch to be rescheduled for December 5.
The second GPS Block III satellite was launched with the final Delta IV Medium in the + configuration on 22 August 2019.