The road-cum-rail bridge is built across the Godavari River as it enters into the deltaic reach before debouching into the sea downstream of the bridge, the second largest river in India. At the location of the bridge, near Rajahmundry, the river flows with a width of about, split in two channels with an island formation in between. The maximum discharge observed in the river is reported to be around 3 million m3/s and the maximum velocity of water flow as per second
History
Construction
During the Third Five-Year plan doubling of railway track between Chennai-Howrah was planned. Most of the route had been doubled except the small stretch of track between Kovvur and Rajahmundry where a bridge had to be built to span the three kilometer long Godavari River. During 1964, the construction of second bridge across Godavari river at Rajahmundry was sanctioned as a part of doubling of track between Kovvur and Rajahmundry. But there had been a persistent demand from local population for construction of a road link between Kovvur and Rajahmundry, which would essentially link East Godavari and West Godavari districts. The Andhra Pradesh State Government came forward with the proposal to add a road deck over the rail bridge under construction as a part of doubling the railway track between Chennai-Howrah. It was commissioned by South Central Railway division of Indian Railways. Construction of the bridge began in the early 1970s by Braithwaite, Burn & Jessop Construction Company, a group company of Bharat Bhari Udyog Nigam Limited. When completed it was Asia's longest rail -cum- road bridge. It was inaugurated by the then President of India, Fakhruddin Ali Ahmed in 1974.
Sister bridges
Old Godavari bridge
The Old Godavari Bridge or Havelock Bridge was built in 1900 by Mr.F.T.G.Walton, now decommissioned, this bridge has 56 spans and is 2754 m long. It was constructed with stone masonry and steel girders and certainly a marvel of British engineering. The New Godavari Bridge was made as a substitute for it.
Godavari arch bridge
Godavari Bridge is the newest bridge constructed among the three. Constructed by the Hindustan Construction Company, this bridge is a modern-day engineering feat. The bridge is made of bow string girder arches. The bridge is fit for 350 km/h rail services. The bridge was opened for rail traffic in 2003.
Fourth Godavari bridge
New Kovvur–Rajahmundry 4th Bridge was opened to traffic in 2015.