Godavari Arch Bridge
The Godavari Arch Bridge is a bowstring-girder bridge that spans the Godavari River in Rajahmundry, India. It is the latest of the three bridges that span the Godavari river at Rajahmundry. The Havelock Bridge being the earliest, was built in 1897, and having served its full utility, was decommissioned in 1997.
The second bridge known as the Godavari Bridge is a truss bridge and is Asia's second longest railroad bridge.
The bridge is one of the longest span prestressed concrete arch bridges in Asia.
The Indian Railways who built this bridge have stated that "It is perhaps for the first time anywhere in the world that a bowstring arch girder using concrete has been constructed for such a long span of, and that too for the Railway loading." It has been widely used to represent Rajahmundry in arts, media, and culture. It is one of the recognised symbols of Rajahmundry.
Geography
The bridge is built across the Godavari River, the largest river in South India at over length. It is built in the region as the river enters into the deltaic reach before discharging into the sea downstream of the bridge. At the location of the bridge the Godavari river flows with a width of about, split in two channels with an island formation in between. The maximum discharge observed in the river is reported to be around 3 million m3/s and the maximum velocity of water flow as per second. The bridge is located in a cyclonic area where the wind speed touch per hour.The bridge is located in two channels, the Kovvur channel and the Rajahmundry channel, and hence the bridge is also known as the Kovvur-Rajahmundry Bridge. The Rajahmundry channel has a deep rocky bed, and even the water level is. Comparatively the Kovur channel is shallow with a water depth of about and riverbed is made up of clay deposits.
History
Earlier Bridges
This bridge is the third in the series of the bridges that spans the Godavari river at Rajahmundry. The earliest bridge is the Havelock bridge, which was built in 1897 by Frederick Thomas Granville Walton. It is long and is made of masonry piers and steel girders. It was decommissioned in 1997 as it had served its full utility. The Godavari Arch bridge was actually built to replace the Havelock bridge. Additionally, the Godavari Arch bridge is aligned parallel to the Old Godavari bridge, and is separated by a short distance of about 200 meters.The second bridge is a railroad bridge, the Godavari bridge, built in 1960's as a part of doubling of railway track between Chennai – Howrah. This is a truss bridge, with the superstructure made of steel. It is in active service and carries a single railway track in the lower level, and two-way road, pedestrian pathways on the upper level. Initial plans for the construction of the Godavari Arch bridge consisted of a steel superstructure like the Godavari bridge. But later the concept of prestressed concrete girders was considered, and subsequently the designing was continued with the concrete girders.
Planning
Godavari Arch Bridge was to be built to replace the Havelock Bridge, which had served its full utility. Initial plans made for the bridge considered a superstructure made of steel. But, as the usage of concrete as construction material had become popular since its introduction in the 1930s, the issue of type of superstructure was re–examined by the Indian Railways. It was decided to examine the possibility of evolving a prestressed concrete bridge with a span. Firms were pre-qualified for the purpose with preferred options suggested for submission of offers, and for the preference of steel girder or concrete girder.Among the three firms which were shortlisted to submit proposals, two firms opted for concrete bridge and one for steel bridge. On the basis of these proposals, the authorities at Indian Railways prepared the Terms of Reference prescribing the design criteria. Following this, the three qualified firms, the Research Design and Standards Organization and the Railway Board were taken into consideration to indicate their views and comments on the Terms of Reference. And, subsequently the design criteria for the bridge was finalised.
The proposals received from the three firms were examined by Proof Consultants who recommended that the design offered by Hindustan Construction Company be accepted. It proposed the bowstring-girder type concrete arch of span with prestressed concrete box girder to act as the tie. Following this recommendation, the proposal of Hindustan Construction Company was accepted considering its technical feasibility and financial viability. Hindustan Construction Company won the order to plan, design and build the bridge.
Construction
The bridge, built by the Hindustan Construction Company, for the Indian Railways, was designed by Bureau BBR, Switzerland, and checked by Leonardt Andrä and Partners, Germany.Construction on the bridge began in 1991 and lasted till 1997. It was commissioned for passenger traffic in March 1997 and became fully operational for running trains by the Indian Railways from 2003.
Description
Specifications
The twin arches, box girders, struts are all made of prestressed concrete.The twin arches have a constant width of and depth varying from at the springing to at the crown. These are connected laterally with struts and box girder.
There are 28 identical spans of twin arches, of parabolic profile, spaced at, each of width from centre to centre of the piers with a total length of.
The effective span from centre to centre of the bearings is.
Each girder is long.
The final dimensions of the box girder are × with thickness of the top slab of, the web of thickness and with the bottom slab thickness kept at.A diaphragm stiffens the box girder at each Dina Hanger location.
The substructure of the bridge consists of 28 piers.
Design aspects
The superstructure of the bridge is of the bow-string girder type. While designing, the projected speed for the trains was taken as 160 km per hour. Taking into consideration the cyclonic conditions, the wind speed considered without live load was per hour, and with dead load the speed considered was per hour. As the location of the bridge is in the Seismic Zone I, seismic load has not been accounted for in the design.The bridge is designed to run trains at a speed of per hour and is designed to withstand wind speed of per hour during cyclonic storms that are anticipated in and around Rajahmundry.
Arches
The arches are designed to share 80% of the dead load and live load transferred from the hangers and thus a plays a critical role of relieving the flexural and shear stresses on the girder. Twelve sinking supports are provided at each hanger location connecting with the girder.Hangers
Each span of the bridge has 24 hangers, which are further divided into six types depending on their length. Each Dina Hangar is made of 49 high tensile steel wires of diameter each. These wires run parallel to each other and are encased in a high tensile polythene pipe, which is cement grouted.Girders
The box girders are made of M42 grade concrete. Each girder was prestressed with 16 longitudinal cables, which in turn were prestressed to a force of 2950 kN each.The box girder, which functions as the deck of the bridge and carries the live load, comprises end diaphragm, which has inspection windows.
The design of the girder accounts for loading conditions of full span train load, half span train load, one third span train load and so forth with due accounting of temperature variation of ±. At each stage of casting of the girders forces generated in the arch section were studied and accounted. The girder casting also ensured that no cracks appeared in the arches at any stage.
Bearings
The bridge has been provided with pot bearings, of 1050 tonnes capacity. One each pier, the girder is supported on four pot bearings of three types: PNa, PNe, PN.The PNa type bearing on one pier and PNe type in the succeeding pier and PN type which is fixed type.
The PNa and PNe type of bearings have been pre-set for movement in the longitudinal direction and in the lateral direction and the centre line of top plate has been fixed relatively by / with respect to centre line of bottom plate of the bearing which will permit the movements due to creep, shrinkage and elastic deformation. Their placement ensures that only longitudinal movement takes place without permitting any lateral moment.
Three sets of bearings were imported from Switzerland, while the balance bearings were made by BBR Pvt Ltd, India.