Wuhan Metro is a rapid transit system serving the city of Wuhan, China. Owned and operated by Wuhan Metro Group Co., Ltd., the network now includes 9 lines, 228 stations, and of route length. Line 1, the first line in the system, opened on, which made Wuhan become the seventh city in mainland China with rapid transit system, after Beijing, Tianjin, Shanghai, Guangzhou, Changchun, and Dalian. Line 2 opened on and is the first underground rail line crossing the Yangtze River. Commuting across the Yangtze River and Han River has been the bottleneck of Wuhan traffic. However, the appearance of Wuhan Metro greatly relieved this problem. With 1.22 billion annual passengers in 2019, Wuhan Metro is the sixth-busiest rapid transit system in mainland China. There are a number of lines or sections under construction. The government of Wuhan City promised the citizens that at least two lines or sections open every year. Due to the COVID-19 pandemic, the entire network was out of service from 23 January 2020 to 27 March 2020.
History
Preliminary studies of urban rail transit systems were prompted by the city shortly after a Belgian Railways delegation visit in 1984. Following the demolition of old Beijing-Hankou Railway, the city of Wuhan planned to utilize the corridor to construct the city's first rapid transit rail line. In September 1992, the Wuhan Metro Construction Group was established by Wuhan Municipal Construction Commission and a supervision group, led by the mayor Qian Yunlu, was subsequently formed in 1993 to facilitate the project's funding, planning, logistics, and organization. Yet, it was seven years before the city was able to fund construction.In October 1999, the National Planning Commission approved the Wuhan "Light Rail" project, signalling the start of serious work on the rail transit project. On October 2, 2000, the Wuhan Municipal Government ratified the establishment of the Wuhan Rail Transit Co., Ltd., and contracted construction, operation, administration and related real estate development to the corporation.
In December 2000, the National Planning Commission accepted a feasibility report on the project and approved construction on phase 1 of Line 1. On December 23, 2000, the project broke ground and comprehensive construction began.
In 2002, with the anticipation of an economic boom and increasing demand for urban rail transit, Wuhan Municipal Government approved the city's first long-term rail transit master plan. On July 28, 2004, the ten-station long "light rail" line was opened to the public and entered revenue service in August. However, low ridership discouraged the city from funding the extension project, for which ground had been broken on December 15, 2005, and a 4-year delay in construction ensued. In April 2006, the NDRC ratified a six-year construction/operation plan, but it was not until a year later on April 9, 2007, that NDRC accepted the feasibility report for line 1, phase 2 and approved construction on the project.
In the interim, construction began on the Fanhu station of the fully underground line 2 on November 16, 2006, as a response to the six-year plan adopted by NDRC earlier. Construction also began on the underground line 4 stations of Wuchang railway station in June, and Wuhan railway station in September, as parts of the integral capital project to revamp and construct the Wuhan Railway Hub.
In May 2007, the Hubei Provincial Development and Reform Commission approved preliminary designs on Line 1, phase 2, and comprehensive construction subsequently commenced in June. On May 15, the city government approved the establishment of Wuhan Metro Group Co., Ltd., which would replace the Wuhan Rail Transit Co., Ltd and assume its responsibilities and benefits.
On September 12, 2007, the NDRC accepted the feasibility report to Line 2, phase 1, and preliminary designs were approved by the HDRC in December 2007. However, it was not until September 2008 that land purchases and funding were facilitated and comprehensive construction began to take place. In October 2009, drilling of the Yangtze River tunnel started.
On March 13, 2009, the NDRC accepted a feasibility report to Line 4, phase 1. On May 13, 2009, the HDRC ratified preliminary designs on Line 4, phase 1. Comprehensive construction ensued on the Wuchang segment of Line 4. A more ambitious urban rapid transit plan was submitted for NDRC review in October 2009, and in late November, on-site panel investigations were conducted by China International Engineering Consulting Corporation.
In February 2010 's first commercial property topped out in Hanxi 1st Road station. On July 29, Line 1 phase 2 entered revenue service from Dijiao to Dongwu Boulevard. Despite plans to extend the westernmost terminus to Jinshan Avenue in Dongxihu District, the station was never built. A short stub with crossover tracks was constructed behind Dongwu Boulevard. Zhuyehai, a station in Qiaokou District, remained non-operational in spite of the existence of complete platforms. Neither exits nor staircases had been built yet. It was due to open when the Wuhan IKEA store was completed in late 2014.
A revised and more detailed construction plan was accepted by the NDRC on January 31, 2011. The plan specified the city's plan to complete construction on Line 3, 4, 6, 7 and 8 before 2017. Beginning on March 1, Line 1 subdivided its fare zones from 3 to 5 and lowered maximum fare from 5 CNY / ride to 4 CNY / ride. Wuhan Tong cardholders will receive a 20 percent discount on single ride fares. On April 9, Line 1 welcomed its 100,000,000th customer, who was awarded a one-year pass to the Metro. On September 9, preliminary designs on Line 4, phase 2 was approved by HDRC.
On February 17, 2012, the NDRC accepted a feasibility report on line 3, phase 1, the fourth line in Wuhan Metro's grid and the first to cross the Han River, connecting the boroughs of Hankou and Hanyang. A feasibility report to Line 6—the second Hankou-Hanyang connection—was also approved by the NDRC on December 21, 2012. Seven days later, line 2 entered revenue service, connecting some of the most populated areas of Hankou, Wuchang, and the Optics Valley.
On April 12, 2013, the NDRC granted acceptance to a feasibility report of Line 8, phase 1, which connects Hankou and Wuchang via the Second Yangtze River Bridge corridor. Construction began in June 2013 and was completed in December 2017.
.
On 23 January 2020, the entire metro network was shut down, along with all other public transport in the city, including national railway and air travel, to halt the spread of COVID-19 pandemic in Hubei.
On 28 March 2020, six lines resumed operations, after a two-month lockdown. On, Line 8 Phase 1 resumed operations. On, Line 8 Phase 3, Line 11, Yangluo line resumed operations.
Timeline of service expansion
Lines
Line 1
Line 1 is a elevated urban rail line entirely located in the borough of Hankou. It runs a northwest–southeast route that approximately parallels with Jiefang Avenue for its entire length. There are 27 planned stations, among which 25 are operational. Line 1 operates 33 four-car train sets, 12 of which are manufactured by Changchun Railway Vehicles, and 21 by Zhuzhou Electric Locomotive Co., Ltd.On July 28, 2004, the first phase of Line 1 began service from Huangpu Road to Zongguan. On July 28, 2010, Line 1 extended from both ends after the completion of phase 2. The phase 3 expansion, which extends the northeast terminus to Hankou North Station, entered revenue service on May 28, 2014. The phase 4 expansion, which extends to Jinghe Station from Dongwu Boulevard. The phase 4 opened on Dec 26th, 2017. Line 1's color is blue.
Line 2
Line 2 is a underground subway connecting the boroughs of Hankou and Wuchang. Upon completion, Line 2 was the first subway in China to cross the mighty Yangtze River. It runs in a northwest–southeast route and crosses the Yangtze River near Jianghan Road, and Jiyuqiao in Wuchang. Tunnel drilling concluded on February 26, 2012. Revenue service of Line 2 began on December 28, 2012. Line 2 operates 41 six-car train sets, all of which were manufactured by Zhuzhou Electric Locomotive Co., Ltd.Line 2 is set to be extended towards both directions. The southern extension will bring the southeast terminus from Optics Valley Square to 6th Gaoxin Road, and the northwest extension plan will bring the northwest terminus from Jinyintan to Wuhan Tianhe International Airport, providing convenient access for airport and residential areas en route. Early on, construction work on both extensions was expected to commence in 2013, and the tentative completion dates was set at 2015. In May 2014, it was reported that the construction work on the southern extension would start within 2014, with was the completion by February 19, 2019. Line 2's color is pink.
Line 3
Overall construction of Line 3 was approved by National Development and Reform Commission on Feb 23, 2012, and officially started on Mar 31, 2012. Line 3 went into operation on December 28, 2015. Line 3's color is dark yellow. Line 3 cars are Type B and manufactured by CRRC Changchun Railway Vehicles.Line 4
Line 4 is mostly underground. It will run in an east–west route serving the Hanyang and Wuchang distincts. The first phase linking Wuchang and Wuhan railway stations opened on December 28, 2013; since that day, all three main railway stations of Wuhan are connected by the Metro. The second phase of Line 4 will crossing the Yangtze River to Hanyang opened in 2014. Line 4's color is light green. Line 4 cars are Type B and manufactured by CRRC Zhuzhou Electric Locomotive.Line 6
Line 6 opened in 2016.And it is the first line of Wuhan Metro to use high capacity A size trains with overhead lines. Line 6's color is green. Line 6 uses Type A cars manufactured by CRRC Zhuzhou Electric Locomotive.
Line 7
Line 7 is a rapid transit line in Wuhan. The line runs from Garden Expo North in Dongxihu District to Qinglongshan Ditiexiaozhen in Jiangxia District. It serves residential & business areas such as Nanhu, Wuhan CBD and Wuhan Financial street. Line 7 reserves Wuhan Metro's highest capacity rolling stock to date featuring 8 Type-A car train sets accommodating 2480 people, compared to the standard 6 cars found on other lines. It is also the fastest urban line in the system, with trains capable of reaching the speed of 100 km/h compared to 80 km/h on other lines.Line 8
Line 8 currently consists of two separate parts. Line 8 Phase 1 was opened in 2017, and Line 8 Phase 3 was opened in 2019. Presently there are 12 stations on the Phase 1 section and 3 on the Phase 3 section. The Phase 2 that is under construction will connect the two parts by the end of 2020.Line 11
Line 11 was opened on 1 October 2018 on National Day. Line 11 uses Type A cars manufactured by CRRC Changchun Railway Vehicles.Yangluo Line
The Yangluo Line is a rapid transit line that forms part of the Wuhan Metro system. Coloured magenta on the metro map, the line in its current form runs from Houhu Boulevard to Jintai, a total distance of. The line connects the urban area of Hankou and Yangluo, Xinzhou District.Services
Service routes
are used on Line 2, Line 4, and Line 7, while the other lines only operate the full length of the route. As far as Line 2, Line 4, and Line 7 are concerned, the short turns alternate with the full routes.- Line 2
- *Short turn: Jinyintan — Optics Valley Railway Station
- *Full route: Tianhe International Airport — Fozuling
- Line 4
- *Short turn: Yulong Road — Wuhan Railway Station
- *Full route: Bailin — Wuhan Railway Station
- Line 7
- *Short turn: Garden Expo North — Banqiao
- *Full route: Garden Expo North — Qinglongshan Ditiexiaozhen
Opening hours
Ticketing
Fares vary based on the distance travelled.Discount
Most Passagers enter and exit the system using a proximity card called Wuhan Tong, which is available at all metro stations. Passagers who pay metro fare with a Wuhan Tong Card can receive a 10% discount.Besides the metro, Passengers can also pay tram, bus, and ferry fees by Wuhan Tong within Wuhan.Multi-day pass
There are three kinds of multi-day pass cards valid for one, three, and seven days respectively.- One-day pass: ¥18 each and valid for 1 day;
- Three-day pass: ¥45 each and valid for 3 days;
- Seven-day pass: ¥90 each and valid for 7 days.