The Tokwe Mukorsi Dam is a concrete-face rock-fill dam on the Tokwe River, just downstream of its confluence with the Mukorsi River, about south of Masvingo in Masvingo Province, Zimbabwe. It is tall and creates a reservoir, the largest inland dam in the country. The associated hydroelectric power station has a installed capacity.
Construction on the dam began in June 1998 but stalled in 2008. Salini Impregilo began to finish the dam in 2011. Heavy flooding in February 2014 caused a partial failure on 4 February, on the downstream face of the dam. By late February the dam had not been fully breached but the unplanned rising reservoir behind the dam caused evacuations upstream. Both upstream and downstream, over 20,000 people were evacuated. Construction of the dam was suspended in June 2014 due to a lack of funding. In May 2016 the government released $35 million to Salini Impregilio to enable the Italian contractor resume construction work that stopped two years ago owing to payment problems. The Dam was eventually completed in December 2016 and commissioned in May 2017.

Gallery