Toh Guan MRT station


Toh Guan MRT station is a proposed Mass Rapid Transit station on the Jurong Region Line in Jurong East, Singapore. Announced on 9 May 2018, it will be constructed as part of Phase 2 of the JRL.
When completed in 2027, the station is to be located in the Jurong East planning area at the junction of with Toh Guan Road and Jurong East Avenue 1 to the north.

History

On 9 May 2018, LTA announced that Toh Guan station would be part of the proposed Jurong Region line. The station will be constructed as part of Phase 2, JRL, consisting of 7 stations between Tengah and Pandan Reservoir, and is expected to be completed in 2027.
The Contract J109 for the design and construction of Toh Guan Station and associated viaducts was awarded to Daewoo Engineering & Construction Co. Pte Ltd - Yongnam Engineering and Construction Pte Ltd Joint Venture at a sum of S$320.4 million in July 2020. Construction is expected to start in 2020. The Contract J109 also includes the design and construction of the Jurong Town Hall and Pandan Reservoir stations and the associated viaducts.

Location

The station complex will be straddled over the existing Jurong East Central, with the junction with Toh Guan Road and Jurong East Avenue 1 to the north, and the junction with Jurong East Street 21 to the south. It is located in the Jurong East planning area between the Yuhua East and Toh Guan Subzones, parallel to the North South line approach tracks to Jurong East station, nested within housing estates.
Access to the station will be via 2 exits on each side of the Jurong East Central.