Tōhoku Main Line


The Tōhoku Main Line is a 575.7 km long railway line in Japan operated by the East Japan Railway Company. Although officially the line starts from Tokyo Station in Chiyoda, Tokyo, most of the long-distance trains actually begin at Ueno Station in Taitō, Tokyo, and pass through such cities as Saitama, Utsunomiya, Fukushima, and Sendai, before reaching the end of the line in Morioka. The line originally extended to Aomori, but was truncated upon the extension of the Tōhoku Shinkansen beyond Morioka, which mostly parallels the Tōhoku Main Line.
The 159.9 km long portion of the line between Ueno Station and Kuroiso Station in Nasushiobara, Tochigi is often referred to as the Utsunomiya Line. A portion of the Tōhoku Main Line is also shared with the Keihin-Tōhoku Line and the Saikyō Line.

Station list

These lists are separated by service patterns provided on the Tōhoku Main Line.

Ueno – Kuroiso

The section between and is known as the Utsunomiya Line.

Kuroiso – Shin-Shirakawa

Shin-Shirakawa – Fukushima

Fukushima – Sendai

Kogota – Ichinoseki

Ichinoseki – Morioka

Ueno – Kuroiso

Kuroiso – Shin-Shirakawa

The construction of the Tōhoku Main Line began in the Kantō region and extended to the north end of Honshu, and the city of Aomori. It is one of oldest railway lines in Japan, with construction beginning in the late 19th century. Until November 1, 1906, the current Tōhoku Main Line was run by a private company Nippon Railway.
In 1883, the first segment between Ueno and Kumagaya opened. In 1885, it was extended to Utsunomiya, but the Tone River had to be crossed by boat. Following construction of the Tone River Bridge in 1886, Utsunomiya and Ueno were directly connected. The line gradually extended further to the north; to Kōriyama, Sendai, Ichinoseki and Morioka. In 1891, the segment between Morioka and Aomori opened, creating the longest continuous railway line in Japan.
After 1906, the line was nationalized and became the Tohoku Main Line operated by the Ministry of Railways. When Tokyo Station opened in 1925, the Tōhoku Main Line was extended from Ueno to the new station. Until the 1950s, this segment was used and many trains ran through both the Tōkaidō Main Line and Tohoku Main Line. However, when the Tohoku Shinkansen opened, it occupied land previously used for the tracks of mid and long-distance Tohoku Main Line trains. As a result, only a small number of commuter lines such as the Keihin-Tohoku Line now operate to Tokyo from the north, making Tokyo Station's status as part of the Tōhoku Main Line somewhat circumspect. This is set to change in March 2015 when the under-construction Ueno-Tokyo Line is completed, facilitating through service between the Tōkaidō Line and the Utsunomiya and Joban Lines.
In 2002, the Tohoku Shinkansen was extended from Morioka to Hachinohe and the operations of the local track segment between those two cities was turned over to Iwate Ginga Railway and Aoimori Railway. With the extension of the Tōhoku Shinkansen to Shin-Aomori station in 2010, the segment between Hachinohe and Aomori was delegated to the Aoimori Railway Company. The shortened Tōhoku Main Line is now the second-longest line in Japan, after the Sanin Main Line.

Double-tracking

The Tokyo to Omiya section was double-tracked between 1892 and 1896, extended to Furukawa in 1908, Koyama the following year, and to Utsunomiya in 1913.
The Iwanuma - Sendai - Iwakiri section was double-tracked between 1920 & 1923 and the Utsunomiya - Iwanuma section between 1959 and 1964. The Iwakiri - Morioka - Aomori section was double-tracked between 1951 and 1968, including the 17 km realigned section between Iwakiri and Atago in 1962.

Electrification

The 7 km Tokyo to Tabata section was electrified at 1,500 V DC in 1909, extended to Akabane in 1928, Omiya in 1932 and Kuroiso in 1959. Electrification was then continued north at 20 kV AC, reaching Fukushima in 1960, Sendai in 1961, Morioka in 1965, and Aomori in 1968.

Former connecting lines

Saitama Prefecture