Stade Nuclear Power Plant


Stade Nuclear power plant operated from 1972 to 2003 in Bassenfleth close to the Schwinge river mouth into the Elbe river. It was the first nuclear plant shut down after Germany's nuclear phase out legislation and is currently being decommissioned.
The station is on the left bank of the Elbe in Stadersand, a locality of Stade, to the west of Hamburg in Lower Saxony beside Schilling Power Station, which has also been shut down. It was a light water reactor.

History

The power plant was built by Siemens and went online on May 19, 1972 shortly after having reached the first criticality on January 8, 1972.
Between March, 1972 and November, 2003 the plant supplied electrical power of 662 MW / 630 MW, as well as 1,892 MW thermal power. Until September 7, 2005, the power plant ran in "post-operational" mode, and has been in "residual" mode since then.
In 31 years of operation, 157 fuel elements were consumed, including, from December 15, 1988 onwards, fuel elements containing 4% uranium. Starting in 1984, the nearby saltern was supplied with process steam. This was the first time a nuclear power station had supplied thermal energy. On Friday, November 14, 2003, at 8:32 a.m. the Stade nuclear power plant was shut down. E.ON, the company operating the plant at the time, cited economic reasons. Some suggested there were also political reasons.

Decommissioning

The power plant was decommissioned in five phases, which were expected to be completed by 2015.
On April 27, 2005 the last fuel cells were removed from the plant.
The Department of the Environment of Lower Saxony authorized the storage of weak nuclear waste until 2046.

Consequences

After shutdown of the Stade nuclear power plant, the operation of the nearby saltern has been shut down also.
Meanwhile it is planned to construct a black coal power plant with almost the same power as the KKS. This requires extension of the harbour of Stade-Bützfleth with a coal terminal for 1.7 million t black coal.