South Acton station (MBTA)
South Acton is an MBTA Commuter Rail station in Acton, Massachusetts. It serves the Fitchburg Line. It is located off Route 27 near Route 2 in the South Acton area. It is the busiest station on the Fitchburg line, averaging 991 weekday boardings. It serves as a park and ride station for Acton and other suburbs of Boston, with a 287-space parking lot owned by the town.
There has been a station on the Fitchburg mainline at the South Acton site since 1844; until 1958 it also served a branch line to Maynard which in earlier years had extended through Hudson to Marlborough. This unused right-of-way became the Assabet River Rail Trail. South Acton has had continuous Boston commuter service since its inception except for five months in 1965 during the transition from fully private railroad operations to state subsidy.
As part of a $277 million project upgrading the Fitchburg Line, South Acton station has been completely rebuilt with two handicapped-accessible high-level platforms connected with an overhead pedestrian bridge, as well as a drop-off lane off Maple Street. The work began in 2012 and the new station opened on December 19, 2015.
History
B&M era
The Fitchburg Railroad began serving the town with a stop, located off of School Street east of Main Street, when it reached the town on October 1, 1844. The railroad completed the first station in 1845 and, when the new station was built in 1892, the old station was moved to Jones Farm and used as a fire station until 1927. The new South Acton Station served the Boston & Maine Railroad until the company sold the building in the early 1970s after it exited the passenger transportation business. This station burned in 1984 and was torn down.South Acton served as a station stop for both the Fitchburg Branch and Marlborough Branch of the B&M. The Marlborough Branch split off from the Fitchburg Railroad west of the station. The station also maintained a two-stall round house, a freight house, and a turntable, located off the Marlborough Branch. Marlborough Branch passenger service ended in 1939, though freight service continued on the line until around 1970. The stub of the branch at South Acton was used as a siding to turn RDC trains until its abandonment in 1979. The right-of-way has since been reused for the Assabet River Rail Trail on its Hudson and Marlborough section. In 2018 rail trail construction will be completed on a 3.4 mile section starting at train station and extending southeast through Maynard to the Maynard/Stow border.
MBTA era
The Massachusetts Bay Transportation Authority was formed in August 1964 to subsidize suburban commuter rail service. On January 17, 1965, northside services were cut to the boundaries of the MBTA funding district. The Fitchburg Line was cut to West Concord until June 28, 1965 when it was reopened to Ayer, restoring service to Ayer. After service to Ayer was discontinued on March 1, 1975, South Acton was the end of the line until service was restored as far as Gardner on January 13, 1980. During that time, the line was known as the South Acton Line.In the 1980s, the Town of Acton and the MBTA moved the station stopping point two tenths of a mile westward, off of Central Street west of Main Street, to provide expanded on-site parking. The original parking lot is now the "overflow" parking lot; portions of the former platform remain in the brush off the north side of the tracks.
Fitchburg Line upgrades
Until 2011, the main double-track section of the Fitchburg Line ended a quarter mile east of the station, with a short second under the Main Street bridge to allow a trainset to sit while preparing for an inbound run. The 1980s-constructed station had a single low platform, which was not handicapped accessible, serving the single track. As part of the ongoing upgrades to the Fitchburg Line infrastructure, South Action station was rebuilt and opened 2015, as the second track was added to the Acton-Ayer section of the line. The new station has separate platforms for inbound and outbound service; both platforms are full-length high-level for accessible boarding. They are connected by a pedestrian bridge which includes ADA-required elevators.A single-platform design was considered in 2009, but the imposing design and the need for large ramps were disliked by town residents. The two-platform design, accepted in 2010, eliminated the need for large ramps and allowed for Maple Street access. The new design was largely based on community input.
A small drop-off lane was built on the south side of the tracks off Maple Street, next to the new inbound platform. However, daily parking capacity was not immediately increased. Additional service and parking at Littleton/Route 495, additional parking at Ayer, and the opening of Wachusett should help to mitigate the demand for parking at South Acton.
On June 11, 2012, the MBTA opened bids for the $9.622 million construction project. Construction preparation began in September 2012. During the periods where the 1980s-built station platform was closed, temporary platforms east of the station and west of the station were used to board passengers. These platforms were installed in October and November 2012; ceremonial groundbreaking was held in December.
The station site was prepared during the winter of 2012-2013, and work on the high-level inbound platform began in April 2013. Foundations for the inbound platform and the pedestrian bridge were laid in 2013. The subcontractor for the steel bridge structure was replaced due to compliance issues in 2013, delaying plans to have the project open by early 2015. The inbound platform was constructed in mid-2014, followed by the outbound platform in November 2014.
The new station was largely complete by the end of November 2015 and opened on December 19, 2015. On January 30, 2016, the MBTA held an opening ceremony with local and state officials.
Service
Until 2014, South Acton was the only station other than Porter and North Station served by all Fitchburg Line trains, for a total of about 16 daily round trips. About one-third of these trips terminated at South Acton, while the others continued to Fitchburg. All short turn trains were extended to Littleton/Route 495 station on August 4, 2014. However, as a high-ridership station, South Acton is still served by all trains.Ridership
South Acton averaged 991 weekday boardings in 2013, making it the most heavily used inbound station on the Fitchburg Line. It is the sole train station in Acton, a town with over 20,000 residents. The station also serves commuters from Route 2, which is to the north. The western expressway portion of Route 2 terminates in Acton, making South Acton convenient for many riders.Ridership is also high due to the high number of trains that serve the station. Some commuters will drive inbound to South Acton from areas further outbound on the line in order to have a larger selection of trains. However, with more trains running to Littleton/Route 495 station and increased parking planned there, more commuters may drive there instead due to its closer proximity to Route 2.
Parking
There are 300 parking spaces, including 6 handicapped-accessible spaces, at South Acton split between two lots. The main lot contains 282 spaces, which are split between 155 resident permit parking spaces and 107 daily 12-hour spaces. The secondary "overflow" lot is located two-tenths of a mile from the station on School Street and contains 15 resident permit parking spaces. Resident parking permits cost $200 annually, whereas the daily 12-hour spaces cost $6 a day.Although service increases at Littleton/Route 495, a new garage at North Leominster, and the opening of Wachusett are expected to bleed off demand, insufficient parking at South Acton is considered a town concern. Although no firm plans were in place, town officials stated in January 2014 that they were considering adding parking spots to serve the station and the Assabet River Rail Trail. In February 2015, the town reported that it was considering the purchase of a property to create an additional 100-space parking lot on the south side of the station. Because many spots at the station are reserved for Acton residents, many commuters from other towns find difficulty parking at the station.
South Acton also has bicycle parking areas with 100 spots to accommodate commuters who do not wish to drive to the station. The completion of the Assabet River Rail Trail will eventually allow bicycle commuting from Hudson and Maynard to the station. A Minuteman Bike Share station is also located at South Acton station.
Connecting service
In 2010, the Town of Acton launched a shuttle service named MinuteVan between the station and a satellite parking area in West Acton. In November 2015, the town added Cross Acton Transit, an hourly fixed-route bus service that connects the North Acton, West Acton, and Acton villages to the station.The Maynard/Acton Commuter Shuttle service between downtown Maynard and South Acton station was piloted from October 2016 to January 2017. It became permanent in 2017.