The Longmont-based firm Flatiron Structures/Figg Engineering Group was chosen to build the bridge, and the company broke ground in October 1997. Construction proceeded faster than expected and was finished about a month early, on August 1, 2000. The final cost was $46.6 million. Funding to construct the Sagadahoc Bridge was available by 1997, but had to be committed by October of that year or the federal funds intended for it would expire. Beginning construction in the time required would not permit the traditional design, bid, and build process to be done, as it would have delayed construction by 18–24 months. MDOT decided to use a design/build process, which it had never done before. The quick construction schedule led to public concern over the aesthetics of the project. Due to that, MDOT created a Public Advisory Committee, hired a public relations firm, and held public hearings about the project to solicit public comment and input as to the aesthetics and the project contractor itself. Most aspects of the bridge were selected through public input, such as the bridge color, railings, lighting, and surrounding landscaping. The inclusion of a pedestrian underpass on the Woolwich side to access the bridge also came about due to public input. The adjoining Carlton Bridge remained after the Sagadahoc Bridge's opening to continue as a rail bridge only, with the upper road deck severed from land on both sides,preventing cars from driving on it. Continuing deterioration of that bridge will necessitate action in the future regarding its continued use, possibly including removal of the remaining road deck or the bridge's closure.
Name
Residents of both Bath and Woolwich, the two towns to be connected by the bridge, participated in the structure's naming process by submitting suggested names to their respective town clerk. A committee of five people from each town was created and together selected six names for further input. Large jars were then placed in public buildings through which residents selected their choice by placing a penny into the jar of their selected name. The name "Sagadahoc", meaning 'mouth of river', was selected and subsequently approved by the Maine Legislature.
Technical
The bridge carries four lanes of U.S. Route 1 over the Kennebec River with approximately of clearance at high tide. SR 127 partially travels underneath the bridge on the Woolwich side to interchange with US 1. The bridge also carries a bicycle/breakdown lane and a barrier-protected sidewalk, with a total deck width of.