S-train (Copenhagen)
The Copenhagen S-train is the S-train of Copenhagen, Denmark. It is a hybrid urban-suburban rail serving the Copenhagen urban area, with the notable exception of Amager. The average distance between stations is 2.0 km, shorter in the city core and inner boroughs, longer at the end of lines that serve suburbs. Of the 86 stations, 32 are located within the central ticket fare zones, 1 and 2. The S-tog is analogous to S-Bahn systems in Germany, and is a separate system from the Copenhagen Metro, which operates in the city centre, Frederiksberg, and Amager.
On weekdays all stations are served at least every 10 minutes until the evening. There are six main lines and one peak hour support line. Since all lines, with exception of one, use the same path through the city core, train departures occur every second minute there, at the general limit of metro lines. On most suburban lines, trains depart every five minutes. On Sundays these time intervals are doubled.
The first line was opened in 1934, which was Klampenborg-Copenhagen H-Vanløse-Frederiksberg, with more lines soon after. Most were converted from steam operated railways to electric, metro-like operation and stations. Today the network forms the heart of public transport in the city, serving more than 357,000 passengers a day. The S-train is owned and run by DSB S-tog A/S. Similar to the S-Bahn systems of Berlin, Vienna and Hamburg, the S-train network covers the entire greater urban area.
The system is complemented by the Copenhagen Metro, regional trains, local diesel-powered trains within Metropolitan Copenhagen, an extensive bus network and two lines of shuttle boats called "harbour buses". The different networks use a common system for fare zones and tickets.
Copenhagen's two different city rail systems, the S-train and the Metro, serve more than half a million people a day, and the city's bus terminals are often adjacent to an S-train or Metro station. As of January 2009 there are 170 km of double track and 84 S-train stations, of which eight are in neighbouring towns outside greater Copenhagen. At most of the termini other types of train are available for travel to the more remote towns in the metropolitan area or to the rest of Zealand and the other islands between the Great Belt and Øresund. Trains across Øresund to Scania and its main city, Malmö, connect with the S-train network in the city centre.
In the city centre, the trains run underground in two tunnel sections, also served by regional trains. Elsewhere they are in the open, occasionally above or below street level. There is only one underground station, Nørreport, but many stations are elevated above street level. Flintholm, Ny Ellebjerg and Danshøj stations have tracks crossing each other at different levels with platforms on each level, while at Ryparken they are on the same level. The "ring line" or F line has an elevated section including Nørrebro Station, which offers a view of some of the most populous areas of the city, Nørrebro and Nordvest. Also, the junctions of the Farumbane with the other lines at Ryparken and Svanemøllen include a short elevated section and a short northbound tunnel, respectively. Within the city core the stations are either elevated or lower than the street level.
The S-train system has been entirely one-man operated since 1978. Since 2009 free Wi-Fi Internet access has been available throughout the entire S-train system
Network
The network consists of a central section that splits into three radial lines at each end, reaching the outer suburbs and neighbouring towns.The northern radials are:
- Farumbanen ' to Farum.
- Nordbanen ' to Holte and Hillerød.
- Klampenborgbanen ' to Klampenborg.
- Køge Bugt-banen ' to Hundige, Solrød Strand and Køge.
- Vestbanen ' to Høje Taastrup.
- Frederikssundbanen ' to Ballerup and Frederikssund.
- Ringbanen going between Hellerup in the north and Ny Ellebjerg in the south.
Services
The December 2014 timetable has seven lines, each with a letter designation. Most run from about 0500 to about 0100 each day, with a train every 10 minutes in daylight hours and one every 20 minutes in the early morning and evening/night. The 10-minute interval begins later and ends earlier on weekends. Exceptions are service F, which runs once every 5 minutes ; H, every 20 minutes in daytime to Østerport; and Bx, as an extra line on the Vestbanen and Hareskovbanen in the morning and afternoon.E, H and Bx skip certain stops to provide faster travel time, but no trains skip stops inside the ring line.
The network is slightly different on weekdays, weekends and nights.
As of January 2019, the line layout was changed on the northern branches as follows:
- Line A serves Nordbanen to Hillerød, with limited stops.
- Line B serves Hareskovbanen to Farum
- Line Bx serves Hareskovbanen to Farum, with limited stops and only in the rush hours
- Line E serves Nordbanen, to Holte
Weekday services
Earlier timetables also had express services that skipped stops inside the ring line.
Weekend services
In the weekends, only lines A, B, C and F run, operating six times an hour between 1000 and 1800 and every 20 minutes outside this timespan. The weekend services are:Night services
Starting November 2009, the network has had distinct night services that depart twice every hour on Friday and Saturday night. The night services are:There is one service for each of the radials at night, stopping at every station.
Future
Two new stations are scheduled to be built: Favrholm and Vinge, close to Frederikssund.Since 30 trains per hour per direction now run between Dybbølsbro and Svanemøllen, building a new tunnel, running north–south in densely populated areas, has been discussed.
The Vestbane line may easily be extended from Høje Taastrup to Roskilde, since tracks already exist. This has been discussed on several occasions, and is currently being investigated. Extension from Klampenborg to Elsinore would prove more difficult, but the issue has been mentioned. A problem is the lack of more capacity in the central tunnel.
Connecting Copenhagen Airport, Kastrup, to the network has been proposed, although it is already served by both regional trains and the Copenhagen Metro.
The Danish Transport Authority has suggested converting the F-line of the S-train network to metro standard as an M5 line, The only current interchange between the F line and the metro network are Flintholm Station and Nørrebro Station.
The F line is planned be driverless and 24/7 in 2024/2026.
The line Jægersborg-Hillerød has been upgraded from the proprietary HKT train control system to CBTC.
Technical overview
S-trains run on standard-gauge tracks and are powered via overhead wires. The voltage is 1,500 or 1,650 volts DC, indicating that it varies considerably with the loading and distance from a feeder station. Power is drawn from the national grid through 38 feeder stations. They have to be relatively close to each other because the large currents in the overhead wires would lead to unacceptably large transmission losses otherwise.The primary signalling system is a fixed-block cab signalling system called HKT which transmits data to the trains through low-bandwidth audio frequency induction loops between the rails. Different frequency combinations encode different target speeds; when a train enters a block with a lower target speed than its current speed it will initiate service braking until the two match. This allows blocks to be much shorter than the full-speed braking distance, but as the braking profile is encoded in the transmitted target speed it only works where all trains have similar braking characteristics.
Lineside light signals are also provided in case of HKT failures or the occasional visit of a non-S-train, but the lineside blocks are longer so capacity in this mode is reduced. Precise train positions are visible on all lines in Byens puls.
Rolling stock
The S-train has seen four types of rolling stock. Currently, only fourth-generation trains operate, after the retirement of the second and third generation trains in 2007 and 2006 respectively.First generation (1934-1978)
The first generation was introduced in 1934 at the opening of the network, and consisted of three carriages per train set, manufactured from 1934 to 1962. :da:Frichs|Frichs A/S supplied the electric components while Scandia supplied the car bodies and non-electric components. They were retired in 1978, and one was used as a heritage train until 2003, when DSB decided to discontinue its use. They are the longest serving S-train rolling stock to date, in continuous service for 44 years.Second generation (1967-2007)
The second generation was built from 1967 to 1978 by Frichs A/S and Scandia. They saw the introduction of the signature red colour that was to characterize subsequent generations of rolling stock.There have been three different formations: the first, had a motor car with first-class seating and a second-class trailer; the second, had second-class seating only; and the third, a motor car with driver's cab, a trailer, a motored trailer and a driving trailer without motor.
They ran until January 7, 2007. All have been scrapped except for a few set aside for museum use. An official ceremony was held on February 3, 2007 with the last trip. One train is set to be restored by DJK, who are now the owners of the train, so it can eventually make its way back to the tracks on special occasions such as anniversaries.
Third generation (1986-2006)
The third generation were built by the Swedish industrial firm ASEA from 1985 to 1986. Despite possessing a much improved level of passenger comfort as compared to the previous two generations of rolling stock, it suffered a much higher rate of failure as compared to its predecessors. Twelve trains in 4-car formation were built, and it first entered service in 1986 on the Vestbane and the Nordbane between Holte and Høje Taastrup. They were the first S-train rolling stock to feature electronic chopper control. In 1995, 4 trains were scrapped and the remaining 8 trains were refurbished and reassigned to the Ringbane, where they remained in service until an incident where a child was trapped between the doors forced their early retirement in June 2006. When attempts to sell them failed, they were transported to Holbæk harbour on August 23, 2007 in order to be scrapped.Fourth generation (1996-present)
The fourth generation, in service since 1996, are distinguished by their plump appearance due to their curved sides.They are usually 8-car articulated units supplied by Alstom-LHB and Siemens with prefabricated friction stir welded aluminium roof panels made by Marine Aluminium from Sapa extrusions, and were manufactured from 1996 to 2007. The cars are shorter than conventional railway cars; each has a single axle under one end, the other end being supported by the neighbouring car.. They have automatic Scharfenberg couplers at the ends; in peak hours most trains consist of two coupled units, giving a total train length of 168 meters. They have video surveillance to ensure passenger and staff security and to prevent acts of vandalism. These trains introduced air conditioning in the interior and regenerative braking to the network, increasing energy efficiency. At present, there are 105 8-car trains.
An accident involving an 8-car fourth-generation train in 2002 caused it to be scrapped, necessitated the construction of 4-car sets to relieve the shortage of trains. These 4-car units can run solo in low-traffic intervals. At present, there are 31 4-car trains serving the S-train network.
The top speed of fourth-generation trains is, although on many parts of the network their speed is limited to - due to the limitations of the signalling system, and on the Ringbane they travel at.
Origin of the name
The letter S in "S-train" does not abbreviate any particular word. It originates in hexagonal illuminated "S" signs that were put up at stations before the opening in 1934. These signs may have been inspired by similar signs at the S-Bahn systems in Berlin and Hamburg, but their official purpose appears to have been to mark the location of a Station.In February–March 1934, the newspaper Politiken asked its readers to coin a name for the new network. "S-train" was the winning proposal, made independently by several readers. The judges' panel cited a long list of possible explanations, including choices such as "state railways", "city railway", "Greater Copenhagen", "sun", "lake", "forest", "beach", "snow", "skiing", "skating", "sleigh", all of which start with an S in Danish. This demonstrates that the initial marketing of the S-trains emphasized recreational day trips from the city to the countryside.