River Kinder


The River Kinder is a small river, only about long, in northwestern Derbyshire, England. Rising on the peat moorland plateau of Kinder Scout, it flows generally westwards to its confluence with the River Sett at Bowden Bridge. En route it flows through the Kinder Gates rocks, over the waterfall known as Kinder Downfall, and through Kinder Reservoir, built in 1903–12 by the Stockport Corporation Water Works. Until the 19th century at least, the name was formerly also applied to the River Sett as far as its confluence with the River Goyt in New Mills.

Kinder Downfall

Kinder Downfall is the tallest waterfall in the Peak District, with a fall. The waterfall was formerly known as Kinder Scut, and it is from this that the plateau derives its name. Although usually little more than a trickle in summer, in spate conditions it is impressive. In certain wind conditions, the water is blown back on itself, and the resulting cloud of spray can be seen from several miles away. The Pennine Way crosses the River Kinder above Kinder Downfall. When frozen in hard winters, the waterfall is a venue for ice-climbing, and it is also the highlight of a fell race that bears its name.

Kinder Reservoir

Corporation took over Stockport and District Waterworks Company in 1899 and immediately started investigating potential new water supplies. James Mansergh, consulting engineer, identified a site above Hayfield. Abram Kellett of Ealing was contracted to build a masonry dam and a standard gauge railway to convey materials and workers to the site. Two farms were demolished during the construction. Work started in 1903 but geological difficulties prompted suspension of construction in 1905 and eventually a change in design to a clay/earth dam. Stockport Corporation and the original contractor resorted to the courts over financial issues and the Corporation's unilateral termination of the contract. Construction eventually resumed in 1908, under the supervision of G H Hill and Sons. The opening ceremony was held on 11 July 1912. The reservoir has a capacity of approximately and a surface area of. The adjacent filter house was decommissioned in 1996, following the opening of the new Wybersley Water Treatment Works at High Lane, near Stockport, to which the reservoir's water is now piped for treatment.