Qinghai–Tibet railway


The Qinghai–Tibet railway or Qingzang railway , is a high-elevation railway that connects Xining, Qinghai Province, to Lhasa, Tibet Autonomous Region of China.
The length of the railway is. Construction of the section between Xining and Golmud was completed by 1984. The section between Golmud and Lhasa was inaugurated on 1 July 2006, by CPC General Secretary Hu Jintao: the first two-passenger trains were "Qing 1" from Golmud to Lhasa, and "Zang 2" from Lhasa to Beijing. This railway is the first that connects the Tibet Autonomous Region to any other provinces. Tibet, due to its elevation and terrain, is the last provincial level region in China to have a railway. Testing of the line and equipment started on 1 May 2006. Passenger trains run from Beijing, Chengdu, Chongqing, Guangzhou, Shanghai, Xining, and Lanzhou and can carry between 800 and 1,000 passengers during peak season.
The line includes the Tanggula Pass, which, at above sea level, is the world's highest point on a railway. Tanggula railway station at is the world's highest railway station. The Fenghuoshan tunnel is the highest rail tunnel in the world at above sea level. The New Guanjiao Tunnel is the longest tunnel between Xining and Golmud, and the Yangbajing tunnel is the longest tunnel between Golmud and Lhasa. More than, over 80% of the Golmud–Lhasa section, is at an elevation of more than. There are 675 bridges, totalling ; about of track is laid on permafrost.

Stations

Within the Golmud to Lhasa section of the line there are 45 stations, 38 of which are unstaffed and monitored by the control center in Xining. Thirteen more stations are planned.

Trains and tickets

The trains are specially built for high elevation environments. The diesel locomotives for cargo were built by CSR Qishuyan and by CNR Erqi Locomotive, and the locomotives for passenger transportation were built by GE in Pennsylvania, and the passenger carriages are Chinese-made 25T carriages: on train Z21/Z22, between Beijing West and Lhasa, Bombardier Sifang Transportation made carriages on the Golmud-Lhasa section in deep green/yellow or deep red/yellow. Signs in the carriages are in Tibetan, Chinese, and English. The operational speed is and over sections laid on permafrost.
The railway from Golmud to Lhasa was completed on 12 October 2005, and it opened to regular trial service on 1 July 2006.
The locomotives are turbocharged to combat the power-reducing effect of having to run on about half an atmosphere of air due to extreme altitude.
At the beginning, only three trains ran: Beijing–Lhasa, Chengdu/Chongqing–Lhasa, and Lanzhou/Xining–Lhasa. Shanghai/Guangzhou–Lhasa service were added in October 2006. In July 2010 the Shanghai–Lhasa service became daily, and a daily service between Xining and Lhasa was added, but the service was then suspended for the winter season.
Since October 2006, five pairs of passenger trains run between Golmud and Lhasa, and one more pair between Xining and Golmud. The line has a capacity of eight pairs of passenger trains.

Oxygen supply and medical issues

The passenger carriages used on Lhasa trains are specially built and have an oxygen supply for each passenger. Every passenger train has a doctor.
A Passenger Health Registration Card is required to take the train between Golmud and Lhasa. The card can be obtained when purchasing the ticket. Passengers must read the health notice for high-elevation travel and sign the agreement on the card to take the train. On 28 August 2006, a 75-year-old Hong Kong man was reported to be the first passenger to die on the train, after he had suffered heart problems in Lhasa but insisted on travelling to Xining.

Construction

The capital of the Qinghai Province, Xining, became connected with the rest of the country by rail in 1959, when the Lanqing Railway from Lanzhou was completed.
The 815 km section of the future Qingzang Railway from Xining to Golmud, Qinghai opened to traffic in 1984. But the remaining section from Golmud to Lhasa could not be constructed until technical difficulties of building railroad tracks on permafrost were solved. This section was formally started on 29 June 2001, finished on 12 October 2005, and signaling work and track testing took another eight months. It was completed in five years at a cost of $3.68 billion.
Track-laying in Tibet was launched from both directions, towards Tanggula Mountain and Lhasa, from Amdo railway station on 22 June 2004. On 24 August 2005, track was laid at the railway's highest point, the Tanggula Pass, above sea level.
There are 44 stations, among them Tanggula Mountain railway station, at the world's highest. Peru's Ticlio railway station at is the highest in the Americas. The Qingzang Railway project involved more than 20,000 workers and over 6,000 pieces of industrial equipment, and is one of China's major accomplishments of the 21st century.
Bombardier Transportation built 361 high-altitude passenger carriages with special enriched-oxygen and UV-protection systems, delivered between December 2005 and May 2006. Fifty-three are luxury sleeper carriages for tourist services.
The construction of the railway was part of the China Western Development strategy, an attempt to develop the western provinces of China, which are much less developed than eastern China. The railway will be extended to Zhangmu via Shigatse to the west, and Dali via Nyingchi to the east. A further extension is planned to link Shigatse with Yadong near the China-India border. The railway is considered one of the greatest feats in modern Chinese history by the government, and as a result, is often mentioned on regular TV programs. Chinese-Tibetan folk singer Han Hong has a song called Tianlu praising the Qingzang Railway.

Completed extensions

On 17 August 2008, a railway spokesman confirmed plans to add six more rail lines connecting to the Qinghai–Tibet railway, including from Lhasa to Nyingchi and from Lhasa to Shigatse, both in the Tibet Autonomous Region. Three lines will originate from Golmud in Qinghai province and run to Chengdu in Sichuan province, Dunhuang in Gansu province, and Korla of the Xinjiang Uygur Autonomous Region. The sixth will link Xining, the capital of Qinghai, with Zhangye in Gansu. The six lines are expected to be in operation before 2020. Construction work of the Lhasa–Shigatse extension began on 26 September 2010; it was opened in August 2014.
The construction of Dunhuang–Golmud railway began in December 2012 and finished on 18 December 2019. This new railway extends the existed Yinmaxia station on the Qinghai–Tibet Railway to Dunhuang, Gansu, establishing a direct connection between Xinjiang and Tibet.

Addition of Capacity and Electrification

Given that the Sichuan-Tibet railway are expected to complete relatively later with less capacity, the Qinghai–Tibet railway is expected to add cargo capacity to fulfill the demand of material transportation. 13 stations along the Qinghai–Tibet railway has received extension of lanes, or was built from scratch. This will allow the daily train received from Lhasa Railway station to expand from 6 to 12-14. An electrification feasibility study is also in progress.

Connection to Nepal

In a meeting between Chinese and Nepalese officials on 25 April 2008, the Chinese delegation announced the intention to extend the Qingzang railway to Zhangmu on the Nepalese border. Nepal had requested that the railway be extended to enable trade and tourism between the two nations. The section Lhasa-Shigatse opened in August 2014. In June 2018, China and Nepal signed a series of agreements including the construction of Shigatse-Kathmandu railway during Nepali prime minister Oli's visit to China. Construction is expected to be complete by 2024.

Potential link to India

In 2010, a Chinese Ministry of Railways spokesman announced that it would be extending the Qinghai–Tibet Railway southward to Shigatse, but it has yet to confirm an extension to India, Bangladesh and other railway networks.
The extension to the Shigatse region and Nyingchi has been confirmed by the relevant government departments in Tibet. The Qinghai–Tibet Railway will be connecting close to India. An official in charge of the Tibet Autonomous Region Development and Reform Commission had pointed out: "Tibet Railway is completed, with Lhasa as the basis, will be built east of Lhasa to Nyingchi line from Lhasa to Shigatse west building line of the south building of the Qinghai-Tibet Shigatse to East Asia and other three Railway Line. These extensions will be opened to traffic within a decade. then, the three railway extension will form a large Y-shape, the length will be over two thousand kilometers".
Although the Chinese government never planned an extension to India, many people have embarked on the possibility of this. Qinghai People's Congress Vice Secretary General Liu Palit is one of them. In an interview, 21st Century Business Herald interview, he supported a motion to establish a connection between the Pacific and Indian railway bridge on land, possibly linking the east coast port city of Lianyungang, eastern China, Xi'an, Lanzhou, Xining, Lhasa, Shigatse, through Nepal, and finally arriving in Patna, India, New Delhi, Mumbai and Karachi, China and India and Pakistan to achieve rail transport.
Liu Palit has stated regarding the Qinghai-Tibet Plateau in South Asia continental bridge, "The past is not the Qinghai-Tibet Railway, which route is the only choice, now, starting from Tibet, a land bridge political more meaningful". If the idea of the railway arrived in Nepal's plains region of Nepal, it is very easily connected with the Indian railway network. Experts said that "if the railway opened in Nepal, but also enable the railway system in India and Bangladesh, Nepal, and China through connectivity, all countries will benefit."

Engineering challenges

There are many technical difficulties for such a railway. About half of the second section was built on barely permanent permafrost. In the summer, the uppermost layer thaws, and the ground becomes muddy. The heat from the trains passing above is able to melt the permafrost even with a small change in temperature. The main engineering challenge, aside from oxygen shortages, is the weakness of the permafrost. For areas of permafrost that are not very fragile, an embankment of large rocks is sufficient. Meanwhile, in the most fragile areas, the rail bed must be elevated like a bridge. The engineers dealt with this problem in the areas of weakest permafrost by building elevated tracks with pile-driven foundations sunk deep into the ground. Similar to the Trans-Alaska Pipeline System, portions of the track are also passively cooled with ammonia-based heat exchangers.
Due to Climate change, temperatures in the Tibetan Plateau may be considered to increase by an estimated two to three degrees Celsius. This change is sufficient to melt the permafrost and thereby affect the integrity of the entire system. The effects of climate change have yet to be seen.
The air in Tibet is much thinner, with oxygen partial pressure being 35% to 40% below that at sea level. Special passenger carriages are used, and several oxygen factories were built along the railway. Each seat in the train is equipped with an oxygen supply outlet for any possible emergency. The Chinese government claimed that no construction workers died during the construction due to altitude sickness related diseases. The railway passes the Kunlun Mountains, an earthquake zone. The 7.8 Kunlun earthquake struck in 2001. Dozens of earthquake monitors have been installed along the railway.

Impact

Economic

With limited industrial capacity in Tibet, the Tibetan economy heavily relies on industrial products from more developed parts of China. Transport of goods in and out of Tibet was mostly through the Qingzang Highway connecting Tibet to the adjacent Qinghai province, which was built in the early 1950s. The length and terrain have limited the capacity of the highway, with less than 1 million tons of goods transported each year. With the construction of the Qingzang railway, the cost of transportation of both passengers and goods should be greatly reduced, allowing for an increase in volume—the cost per tonne-kilometer will be reduced from 0.38 RMB to 0.12 RMB. It is projected that by 2010, 2.8 million tons will be carried to and from Tibet, with over 75% carried by the railway. Before the railway, the purchasing power of 100 RMB in Lhasa was only commensurate with 54 RMB in coastal regions of China, mainly due to high transport costs. The railway could elevate living standards along the route.

Social

As reported by Xinhua News, the Qingzang railway has promoted the inheritance of Tibetan culture and religion, as the opening of the railway has increased the number of worshippers from all over the country coming to Lhasa. It also advantages tibetans with accessibility to the rest part of China for tertiary education, employment, and market for local industries. Qiangba Puncog, former Chairman of the Tibet Autonomous Region People's Government, has appreciated the railway for introducing more tourism industries to the region with jobs for the local people.
On the other hand, Tibetan Independence groups has critizied Chinese government for having built the railway to strengthen its political control over Tibet. In particular, groups such as the International Campaign for Tibet have alleged that the railway will marginalize Tibetans in the Tibet Autonomous Region by encouraging further Han migration from the rest of China.

Environmental

The environmental impact of the new railway is an ongoing concern. The increase in passenger traffic will result in greater tourism and economic activity on the Tibetan Plateau, and the construction of the railway may also negatively impact the local environment. For example, interference on earth, vegetation, and surface water heat exchange, which may cause freeze-thaw erosion and melting of ice if not handled properly.
To reduce the interference, trash and excrement on the trains are collected into two sealed containers in each car, and are taken out at the big stations. There are also concerns from the China Meteorological Administration that melting, due to global warming, of the permafrost in Tibet on which part of the railway is placed may threaten the railway within the 21st century.
The railway would make coal, which is not produced in Tibet, an affordable replacement of wood, the main fuel source for rural inhabitants in certain regions of Tibet. The traditional method of cutting trees for fuel damages the ecosystem and takes decades to recover in the harsh ecological condition of Tibet. Therefore, the abundant coal and petroleum resources brought by the railway from Northwest China into Tibet could positively shift the region's energy structure and prevent deforestation.
The effects of this railway on wild animals such as Tibetan antelope and plants are currently unknown. 33 wildlife crossing railway bridges were constructed specifically to allow continued animal migration. is the Google Maps satellite image of one such bridge.

Rolling stock

Since the opening of Qingzang Railway, scenery as viewed from the railway has become internationally famous:
Xining to Golmud:
Golmud to Lhasa: