PSLV-C5
PSLV-C5 was the fifth operational launch and overall eighth mission of the Polar Satellite Launch Vehicle program. This launch was also the fifty-second launch by the Indian Space Research Organisation since its first mission on 1 January 1962. The vehicle carried and injected India's remote sensing satellite Resourcesat-1 into a sun-synchronous orbit; this was the heaviest and most sophisticated satellite built by IRSO through 2003. PSLV-C5 was launched at 04:52 hours Coordinated Universal Time on 17 October 2003 from Satish Dhawan Space Centre.
Mission highlights
PSLV-C5 was the fifth operational and overall eighth mission of the PSLV program. The vehicle carried and injected the heaviest and most sophisticated remote sensing satellite built by the ISRO through 2003, Resourcesat-1.Mission parameters
- Mass:
- * Total liftoff weight:
- * Payload weight:
- Overall height:
- Propellant:
- * First stage: Solid HTPB based
- * Second stage: Liquid UH 25 +
- * Third stage: Solid HTPB based
- * Fourth stage: Liquid MMH + MON
- Engine:
- * First stage: Core + 6 strap-on Propellant strap on motors
- * Second stage: Vikas
- * Third stage: PS 3
- * Fourth stage: PS 4
- Thrust:
- * First stage: 4,762 + 645 x 6 kN
- * Second stage: 800 kN
- * Third stage: 246 kN
- * Fourth stage: 7.3 x 2 kN
- Altitude:
- Maximum velocity:
- Duration: 1,084 seconds
Payload
Country | Name | Nos | Mass | Type | Objective |
India | IRS-P6 | 1 | 1,360 kg | Satellite | Earth observation |
Launch and planned flight profile
PSLV-C5 was launched at 04:52 hours Coordinated Universal Time on 17 October 2003 from Satish Dhawan Space Centre. The mission was planned with pre-flight prediction of covering overall altitude of. The flight profile was as follows:Stage | Time | Altitude | Velocity | Event | Remarks |
First stage | T+0 | 0.02 | 452 | Ignition of PS 1 | Lift off |
First stage | T+1.2 | 0.02 | 452 | Ignition of 4 ground-lit PSOM | |
First stage | T+25 | 2.348 | 543 | Ignition of 2 air-lit PSOM | |
First stage | T+68 | 23.230 | 1,156 | Separation of 4 ground-lit PSOM | |
First stage | T+90 | 41.844 | 1,609 | Separation of 2 air-lit PSOM | |
First stage | T+113.01 | 67.353 | 1,991 | Separation of PS 1 | |
Second stage | T+113.21 | 67.578 | 1,990 | Ignition of PS 2 | |
Second stage | T+157.01 | 115.706 | 2,316 | Separation of heat shield | |
Second stage | T+265.73 | 244.864 | 4,153 | Separation of PS 2 | |
Third stage | T+266.93 | 246.531 | 4,149 | Ignition of HPS 3 | |
Third stage | T+522.85 | 591.593 | 5,854 | Separation of HPS 3 | |
Fourth stage | T+556.5 | 626.557 | 6,768 | Ignition of PS 4 | |
Fourth stage | T+1,017.0 | 826.388 | 7,426 | Cut-off of PS 4 | |
Fourth stage | T+1,084.0 | 827.032 | 7,440 | Resourcesat-1 separation | Mission complete |