Orient Heights is a rapid transit station in Boston, Massachusetts. The station serves the MBTA Blue Line. It is located off Bennington Street in East Boston's Orient Heights neighborhood. Formerly a Boston, Revere Beach and Lynn Railroad station under various names from 1875 to 1940, it reopened in 1952. The 1952-built station was closed in March 2013 for a complete rebuilding to provide full accessibility and reopened on November 26, 2013. Orient Heights station is the primary rapid transit connection for the Orient Heights neighborhood of East Boston, as well as for Winthrop. It also serves as a bus transfer station, with three routes connecting Winthrop and Orient Heights. Orient Heights Yard, the main Blue Line yard, branches off the main line just north of the station. Because of the proximity, Blue Line employees report to work at Orient Heights station.
History
BRB&L era
The narrow gaugeBoston, Revere Beach and Lynn Railroad opened from East Boston to Lynn on July 29, 1875. The BRB&L opened with Orient station, located north of the intersection of Bennington and Saratoga Street. It was soon replaced with Winthrop station located closer to Saratoga Street. The station was renamed as Winthrop Junction in 1877 when the Boston, Winthrop, and Point Shirley Railroad opened to Winthrop Center, and again as Orient Heights in April 1892. The station was the transfer point between the main line and the Winthrop Center branch during its short operation from 1877 to 1885, and between the main line and the Winthrop Loop after the latter's 1888 opening. By 1928 the line was electrified, with pre-pay stations - more a rapid transit line than a conventional railroad. However, due to the Great Depression, the BRB&L shut down on January 27, 1940.
In 1941, the Boston Elevated Railway bought the BRB&L right of way from Day Square to Revere Beach for use as a high-speed trolley line similar to the Ashmont–Mattapan High Speed Line; these plans were delayed by the onset of World War II. However, the 1926 Report on Improved Transportation Facilities and 1945–47 Coolidge Commission Report recommended that the East Boston Tunnel line, which had been converted to rapid transit from streetcars in 1924, be extended to Lynn via the BBRB&L route rather than using it for a trolley line. In 1947, the newly formed Metropolitan Transit Authority decided to build to Lynn as a rapid transit line, and construction began in October 1948. The first part of the Revere Extension opened to Orient Heights on January 5, 1952, with intermediate stations at and Day Square. The station was the terminus of the line until April 21, 1952, when station opened. Until September 1972, some trains terminated at Orient Heights rather than to provide more frequent service on the inner part of the line. During temporary construction and track work on the outer section of the line and during severe weather conditions, Orient Heights is sometimes used as the terminus, as its busways can accommodate the replacement bus service. From February 1 to December 16, 1981, Orient Heights–Wonderland buses operated on Sundays due to budget cuts. From June 25, 1994 to June 24, 1995, Orient Heights was the terminus at all times to permit reconstruction of the outer stations as part of the Blue Line Modernization Program.
Rebuilding
Until 2012, Orient Heights was the only Blue Line station in East Boston that had not yet been fully rebuilt for better accessibility.. Due to this distinction, until then it was the last remaining station in the MBTA that still had a 1967 system map, which showed the Charlestown and Washington Street Elevateds on the Orange Line and the Green Line A branch. The station was literally falling apart, with the sagging platforms held up by 2x4s. On October 5, 2011, the MBTA announced a $51 million ground-up rebuild of the station. The $51 million reconstruction of the crumbling station was expected to be paid for mostly by the Federal Transit Administration. Construction began in earnest in mid-2012 with the demolition of much of the 1952 station and the erection of temporary platforms. The first inbound elevator shaft was built in November 2012, with the first outbound shaft following soon after. The station closed on March 23, 2013, so that the remainder of the old station could be demolished and the new station built. Bus shuttles operated from Suffolk Downs during the closure, which ended on November 23, 2013.
Bus connections
Three MBTA bus routes operate out of Orient Heights:
: Orient Heights station–Jeffries Point
: Point Shirley, Winthrop–Orient Heights station via Revere Street
: Point Shirley, Winthrop–Orient Heights station via Winthrop Center
Route 120 uses the Bennington Street busway on the inbound side of the station. Routes 712 and 713, which are privately operated lines using MBTA-owned buses, use the Saratoga Street busway on the outbound side.