Northern Busway, Auckland


The Northern Busway is a segregated busway that runs along the eastern side of the Northern Motorway, part of State Highway 1, in the north of Auckland, New Zealand, linking the North Shore with the northern end of the Auckland Harbour Bridge. The busway consists of two-way lanes running between Constellation Station and Akoranga Station, and from Akoranga Station a southbound-only lane that joins the harbour bridge approaches just south of the Onewa Road on-ramp system.
Six stations provide access points for passengers to board; some stations have park and ride parking spaces; others have drop off and pick up zones only.
City-bound Northern Express services commence from Hibiscus Coast Station or Albany Station and travel on local roads to Constellation Station, from where they travel on the dedicated busway lanes; from Albany, the lanes reduced travel time to Britomart Transport Centre from around one hour by car during peak hours to about half an hour by bus. In the reverse direction, NX1 and NX2 services leaving the city travel north to the Akoranga off-ramp, cross over the motorway, and enter Akoranga Station, from where they travel north on the busway lanes. The busway lanes are also an important transport link within the North Shore, where they are the spine of the bus-based public transport system.

History

Background

Prior to 2000, indicative scheme and station planning was undertaken by International Transport Planning Consultants who were engaged by Serco on behalf of Transit.
In 2000, the North Shore Busway Office was established with a team to focus both on the overall scheme as well as the station components. This reflected the nature of the proposed funding. McCormack Rankine undertook refined schematic design and the Busway Team focused on the community consultation and funding programmes.
The ARC held a regional Station Theming Design Competition in 2001 to select a consultant to develop a Theming Manual for application across all major public transport stations to the Auckland Region. This provided a distinctive design signature to the region visually linking all public transport facilities. MARIO MADAYAG/Jasmax Architects were selected as winners for the competition with part of their benefit being their commission on this concept design exercise. The ARC separately engaged MARIO MADAYAG/Jasmax to develop the Theming Manuals within the set parameters of that project. The project ran in parallel with the Busway Station Concept design exercise but was heavily integrated as the pedestrian overbridge, stair lift towers and waiting enclosure developed concepts for the Busway were integrated with the Theming Manual.

Concept, design and construction

Concept design for the busway was developed by MRCagney, with detailed design and consultation completed by Mario Madayag Architecture, Jasmax, Beca Group, Opus and Connell Wagner. Fletcher Construction was responsible for construction. Akoranga, Smales Farm, and Sunnynook stations were built by NZ Strong Construction.
Difficulties encountered included the nearby residential areas, the predominantly soft ground, and environmental efforts to protect New Zealand dotterel breeding grounds. Construction employed around 300 people at its peak, with around a million man-hours being invested, including shifts during 512 nights.

Operation

The busway was officially opened in February 2008 after several years of construction, though the Albany and Constellation stations had been operating since December 2005 using the normal Northern Motorway lanes. It was credited with reducing peak traffic on the Northern Motorway by around 500 cars each rush hour one month after opening, and about 39% of passengers on the Northern Express bus service had never used public transport before. The busway was initially used by 70 buses per hour during peak time.
In 2008, the busway received the 'Shell Bitumen Excellence Award for a Major Roading Project' and the 'Roading New Zealand Supreme Award'. In June 2009, it received the Ingenium 'Excellence Award'.
In June 2010, the busway carried its 5 millionth passenger and was estimated to remove the equivalent of about 5,100 cars in the morning peak, with 80 buses per hour during peak times.
By mid-2011, frequency of the Northern Express had risen to every three minutes during the morning peak hour, five minutes during the 'shoulder peak'.
In 2015, some Northern Express services were extended to Hibiscus Coast Busway Station.
In 2017, Auckland Transport's projections indicated that the busway would reach maximum capacity in 2026, twenty years earlier than originally expected. AT's report said that increased patronage would "manifest in overcapacity conditions and poor operational performances" at Albany, Sunnynook and Akoranga stations. AT was investigating a range of improvements, including lengthening station platforms. A decision on a timeline for conversion of the busway to a rail link was expected to be announced before the end of 2017. In the 12 months to December 2018, the busway carried nearly 6 million passengers.

Funding

The busway became fully operational in 2009, with some final sections being completed with little publicity, for around NZ$290–294 million: $210 million for the busway and $84 million for the stations. The project was funded by Transit New Zealand, ARTA, Auckland City Council and North Shore City Council.

Infrastructure

Busway

The busway has two lanes for 6.2 km running parallel with the eastern side of the Northern Motorway from Constellation Station at the Constellation Drive/Upper Harbour Highway interchange to Akoranga Station at the Esmonde Road interchange, from where a one-way southbound bus lane extends a further 2.5 km to south of the Onewa Road interchange, where it merges with the motorway for the Harbour Bridge. There are no dedicated bus lanes on the harbour bridge itself.
Its use is limited to buses of 25+ seat capacity, emergency and maintenance vehicles, and the SkyBus North Harbour services that run between Albany and Auckland Airport. The busway has been designed for possible use by car pools.

Bus stations

The busway includes six dedicated stations, some with extensive park-and-ride car parks. Feeder bus services serve the stations, allowing transfer.
The stations are :
All stations provide shelter and cycle parking and were designed with public safety in mind, such as with glass walls, low planting, night lighting and CCTV to enhance security.

Other structures

Major related structures are the new Esmonde Interchange and Tristram Avenue Viaduct, which crosses the often-congested Tristram Avenue via grade separation. The viaduct has 12 spans of 30 m each, with the foundation piles being 1.5 m thick.

Electricity transmission cables

Cable ducts were placed beneath the busway during the construction in 2005, to provide for the future installation of electricity transmission cables. The cables installed in these ducts during 2012 and 2013 form part of a major upgrade to the security of supply to North Auckland and Northland.

Plans

The dedicated busway lanes will be extended northwards from Constellation Station to Albany Station.
An extension towards Orewa in the north is being debated for the long-term future. It was originally expected to cost around NZ$500 million, although the success of the scheme has now sparked potentially more extensive schemes for between NZ$700 million and NZ$1.2 billion to at least Silverdale, with up to five tunnels and seven bridges, including a motorway flyover between Constellation and Albany stations. Plans in 2008 included additional stations at Rosedale and Redvale.
In December 2017, plans were released for a $70 million station at Rosedale, situated between the Albany and Constellation stations. The station would be sited on Arrenway Drive with platforms extending across Rosedale Road for bus transfers to other routes. A construction start date of mid-2019 and opening in 2021 were proposed.

Conversion to rail-based transit

The Northern Busway's usage is tracking towards capacity being reached by 2030. Auckland Transport have studied the future mass transit needs for the North Shore, with light rail being determined the most flexible mode compared to other rail-based options. This may use a tunnel to access Auckland city centre as part of the proposed second Auckland Harbour crossing.