Moomba Adelaide Pipeline System
The Moomba Adelaide Pipeline System is a natural gas pipeline delivering gas from the Cooper Basin gas wells near Moomba to Adelaide, with spur pipelines to Angaston and Whyalla. It can also receive gas from Southeastern Queensland through the QSN Link pipeline owned by APA Group.
The pipeline was developed by the Government of South Australia and commenced operation on 28 November 1969. It was privatised in 1995 and bought by QIC Global Infrastructure, the parent company of Epic Energy in April 2013.
The pipeline system now consists of a total of of high pressure gas pipelines, including of laterals. The main lateral spurs are the one to Port Pirie and Whyalla and the one to Angaston. The Angaston spur can also feed gas into the Riverland Pipeline owned by Envestra, which supplies gas to Murray Bridge, Berri and Mildura.
The main pipeline is long and in diameter. The lateral to Port Pirie is at continuing to Whyalla at. The Angaston lateral is of diameter. There are also several loops at the southern end.
The Reeves Plains Power Station is proposed to be constructed adjacent to the pipeline and draw gas directly from it.