Minidoka Project


The Minidoka Project is a series of public works by the U.S. Bureau of Reclamation to control the flow of the Snake River in Wyoming and Idaho, supplying irrigation water to farmlands in Idaho. One of the oldest Bureau of Reclamation projects in the United States, the project involves a series of dams and canals intended to store, regulate and distribute the waters of the Snake, with electric power generation as a byproduct. The water irrigates more than a million acres of otherwise arid land, producing much of Idaho's potato crop. Other crops include alfalfa, fruit and sugar beets. The primary irrigation district lies between Ashton in eastern Idaho and Bliss in the southwestern corner of the state. Five main reservoirs collect water, distributing it through of canals and of lateral distribution ditches.

History

Early studies for irrigation in southern Idaho began in 1889-90 by the U.S. Geological Survey. The data developed were made available to the Reclamation Service after the passage of the 1902 Reclamation Act. The Minidoka Project was established in 1904, with construction of Minidoka Dam starting the same year. Water could flow to the north bank of the Snake by gravity, but pumping was required for the south bank. The project was designed to combine flood control and impoundment of spring runoff for use later in the growing season. Jackson Lake and Palisades Reservoir are regulated to keep the flow at Heise, Idaho from exceeding.
The Minidoka Project contributed to the settlement of the Snake River Plain and river valley, converting semi-arid land to productive farmland. Population rose from a few thousand people in 1915 to more than 200,000 by the 1980s.
During the 1930s the project used labor provided by the Civilian Conservation Corps to construct canals. Later, during World War II, 10,000 Japanese-American internees were held at what is now Minidoka National Historic Site in Jerome County, Idaho. Internees worked on canal maintenance and provided agricultural labor. Population at the Minidoka camp declined to 6500 in 1944, before it was finally closed. The former CCC Camp BR-56 at Paul housed some of the internees in 1943, as well as 148 more internees moved from the Manzanar camp in California. Following the closure of the Minidoka camp, the facilities were used Veterans' Resettlement Program to house returning World War II veterans.

Facilities

The project's dams and reservoirs comprise:
The five main reservoirs are connected by a network of canals and pumping stations to regulate and distribute the water, supplying more than.

Associated projects

on the Snake in Idaho and Wyoming is operated by the Bureau of Reclamation, but is not part of the Minidoka Project. Operated as the separate Palisades Project, the zoned earthfill dam is operated in coordination with the Minidoka and Michaud Flats projects, storing and generating up to 176 megawatts of power. Palisades was built in the 1950s to address downstream water shortfalls.
The Michaud Flats project serves with a pumping station on the left bank of the Snake, just below American Falls Dam, and 25 wells.
The Teton Basin Project on the upper Teton River in eastern Idaho comprised the Teton Dam and reservoir. The dam failed on June 6, 1976 as the reservoir was being filled, leading to extensive flooding in the Minidoka project area. The Ririe Project in the Willow Creek drainage stores up to of drainage from the Caribou Range.