Line 3 (Harbin Metro)


Line 3 of the Harbin Metro is a rapid transit line in Harbin, running from Harbinxizhan to Yidaeryuan. The line is 5.45 km long with 5 stations, all of which are underground, and it commenced operations on 26 January 2017.

History

The first phase of the line, from Harbinxizhan to Yidaeryuan, commenced operations on 26 January 2017.
Harbindajie station opened as an infill station on June 16, 2017. Harbindajie station renamed to Kaishengyuanguangchang station on March 20, 2019.
SegmentCommencementLengthStationName
Harbinxizhan — Yidaeryuan26 January 20173Phase 1
Kaishengyuanguangchang16 June 2017infill station1

Stations

Rolling stock

Services on the line are provided by six-car Type B trains, which have a total capacity of 1440. These trains are the same as those which run on Line 1.

Future Development

The second phase of the line, which extends it to the southeast and northwest, began construction in 2017. It consists of 30 stations, of which 19 are on the southeastern portion and the remaining 11 on the northwestern. The southeastern portion would commence operations in 2021, while the northwestern would do so in 2023.
Eventually, the line is planned to run in a circle around Harbin and would be long, with 34 stations.