Line 2 (Hangzhou Metro)


Line 2 of the Hangzhou Metro is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.
The first phase of the line, between and stations, entered operation on 24 November 2014 after six years of construction. It was extended to on 3 July 2017, and then to on 27 December in the same year.

Opening timeline

Stations