Kárahnjúkar Hydropower Plant


Kárahnjúkar Hydropower Plant, officially called Fljótsdalur Power Station is a hydroelectric power plant in Fljótsdalshérað municipality in eastern Iceland, designed to produce annually for Alcoa's Fjarðaál aluminum smelter to the east in Reyðarfjörður. With the installed capacity of, the plant is the largest power plant in Iceland. The project, named after the nearby Kárahnjúkar mountains, involves damming the rivers Jökulsá á Dal and Jökulsá í Fljótsdal with five dams, creating three reservoirs. Water from the reservoirs is diverted through of underground water tunnels and down a vertical penstock towards a single underground power station. The smelter became fully operational in 2008 and the hydropower project was completed in 2009.
The Kárahnjúkar Dam is the centrepiece of the five dams and the largest of its type in Europe, standing tall with a length of and comprising of material.
The project has been heavily criticised for its environmental impact and its use of foreign workers.

Description

The hydroelectricity project harnesses the rivers Jökulsá á Dal and Jökulsá í Fljótsdal by creating three reservoirs with five concrete-face rock-filled embankment dams; three on the Jökulsá á Dal and two on the Jökulsá í Fljótsdal. After being used in the Fljótsdalur Power Station, all water used in electricity production is discharged into the river Jökulsá í Fljótsdal.
Three dams on the Jökulsá á Dal; the Kárahnjúkar Dam, the Desjará Dam and the Sauðárdalur Dam create the Hálslón Reservoir. At tall and long, the Kárahnjúkar Dam is the largest dam in the project and the largest of its type in Europe as well. The tall and long Desjará Dam and the tall and long Sauðárdalur Dam are saddle or auxiliary dams that maintain the desired height of the Hálslón Reservoir. Water from the long, capacity Hálslón Reservoir is diverted down a long, diameter headrace tunnel towards the Fljótsdalur Power Station.
On the river Jökulsá í Fljótsdal, the tall and long Kelduá Dam forms the capacity Kelduárlón Reservoir. Downstream from the Kelduá Dam is the tall, long Ufsarstífla dam which forms the Ufsarlón, a much smaller reservoir. Water from the Ufsarlón Reservoir is diverted down a long, diameter headrace tunnel where it joins the Hálslón Reservoir headrace tunnel.
Before each of the headrace tunnels from the Hálslón Reservoir or Ufsarlón Reservoir reach the underground power station, they both join to form a single combined headrace tunnel. The single headrace tunnel later splits into two long, diameter steel-lined penstocks and the water makes a rapid descent down a final vertical penstock into the power station. The underground Fljótsdalur Power Station contains six vertical-axis Francis turbine generators rated at 115 MW each. The power station has a combined capacity of 690 MW and discharge of into the river Jökulsá í Fljótsdal via tailrace tunnels and canals. The power production of 4,600 GWh/year corresponds to a capacity factor of 76%, which is relatively high for a hydroelectric facility. Power produced is then transmitted to Alcoa's Fjarðaál aluminium smelter to the east in Reyðarfjörður.

Fjarðaál aluminium smelter

The Fjarðaál aluminium smelter was completed June 2007 and reached full operation in April 2008. Construction began in 2004 and the facility contains a smelter, cast house, rod production and deep-water port. The smelter employs 450 people and produces 940 tons of aluminium a day, with capacity of 346,000 metric tons of aluminium per year. Fjarðaál means "Fjords Aluminium" in Icelandic.

History

Using the rivers Jökulsá á Dal and Jökulsá í Fljótsdal along with other resources in eastern Iceland has been on the drawing board since the 1970s. From 1975-2002, several international companies had planned or attempted to build a metal plant at Reyðarfjörður that would be powered by a hydroelectricity project similar to the Kárahnjúkar. All failed because of opposition to the project until Alcoa along with the Government of Iceland and Landsvirkjun, Iceland's national power company committed to the massive project in 2002.

Construction

The project is funded by Landsvirkjun, which operates the dams and Fljótsdalur Power Station. The Italian company Impregilo is the largest contractor working on the dams. The total cost of the hydropower project is 1.3 billion USD. The penstock was built in place by the German company DSD-NOELL whereas ATB Riva Calzoni of Italy provided intake structures, wheels gates and sliding gates. In total, more than 4,000 tons of steel were used for the steel liner.
Preparatory work on the project began in August 2002 and construction on the Kárahnjúkar Dam and headrace tunnels for the Hálslón Reservoir began in April 2003. In September of the same year, construction began on the underground power station. Construction on both the Desjará Dam and the Sauðárdalur Dam began in April 2004. In June 2006, construction of the Kelduá Dam and Ufsarstífla Dam began and in September, the Hálslón Reservoir began to fill. In mid-2008, the Kelduá and Ufsarstífla Dams were complete and the Ufsarlón Reservoir headrace tunnel was ready.
Construction on the headrace tunnels was done by three full-face tunnel boring machines, while remaining areas were drilled and blasted. This was the first time that tunnel boring machines were used in Iceland.
The project was documented in a MegaStructures program of the National Geographic Channel, and the Discovery Channel's Extreme Engineering, along with mention in the Sigur Rós 2006 documentary Heima, where the band played at a protest against the building of the dam.
There were several workplace fatalities during the construction process including: Arni Thor Bjarnason, Eilifur Gopi Hammond, Ludvik Alfred Halldorsson and Kresimir Durinic.

Criticism

The dams have been the frequent subject of protests by environmentalists for many reasons. The area is within the second largest unspoiled wilderness in Europe and covers about in total and the rivers that supply water to the project are part of Europe's largest glacier, Vatnajökull. The project as a whole has also been criticised heavily in the book Draumalandið and subsequent 2009 documentary Dreamland. About 70% of the workforce was composed of foreign workers.