Flaming Gorge Dam
Flaming Gorge Dam is a concrete thin-arch dam on the Green River, a major tributary of the Colorado River, in northern Utah in the United States. Flaming Gorge Dam forms the Flaming Gorge Reservoir, which extends into southern Wyoming, submerging four distinct gorges of the Green River. The dam is a major component of the Colorado River Storage Project, which stores and distributes upper Colorado River Basin water.
The dam takes its name from a nearby section of the Green River canyon, named by John Wesley Powell in 1869. It was built by the U.S. Bureau of Reclamation between 1958 and 1964. The dam is high and long, and its reservoir has a capacity of more than, or about twice the annual flow of the upper Green. Operated to provide long-term storage for downstream water-rights commitments, the dam is also a major source of hydroelectricity and is the main flood-control facility for the Green River system.
The dam and reservoir have fragmented the upper Green River, blocking fish migration and significantly impacting many native species. Water released from the dam is generally cold and clear, as compared to the river's natural warm and silty flow, further changing the local riverine ecology. However, the cold water from Flaming Gorge has transformed about of the Green into a "Blue Ribbon Trout Fishery". The Flaming Gorge Reservoir, largely situated in Flaming Gorge National Recreation Area, is also considered one of Utah and Wyoming's greatest fisheries.
History and location
Contrary to its namesake, Flaming Gorge, the dam actually lies in steep, rapid-strewn Red Canyon in northeastern Utah, close to where the Green River cuts through the Uinta Mountains. The canyon, for which the dam is named, is buried under the reservoir almost upstream. Red Canyon is the narrowest and deepest of the four on the Green in the area which made it the best site for the building of a dam. Flaming Gorge, on the other hand, was named by John Wesley Powell on his 1869 expedition down the Green and Colorado rivers for the "brilliant, flaming red of its rocks ."Flaming Gorge Dam is one of six that make up the Colorado River Storage Project, a massive system of reservoirs created in the upper Colorado River Basin by the Bureau of Reclamation from the 1950s to the 1970s. The project itself was the indirect result of a system of agreements signed by the seven U.S. states and two Mexican provinces in the early 20th century dividing the flow of the Colorado River among them. Among the terms stated in the 1922 Colorado River Compact reserved for the Upper Basin states of Wyoming, Colorado, Utah and New Mexico and an equal amount for the Lower Basin states of Arizona, Nevada and California. Due to the Colorado's high year-to-year variations in flow, the upper basin could not fulfill the lower basin's allotments in dry years, and much water was wasted during wet years because of the lack of a means to impound it.
Well before the CRSP's inception in 1956, the Bureau had begun to look for suitable reservoir sites along the upper Colorado and tributaries such as the Green, San Juan and Gunnison Rivers. One of the earlier proposals was called Echo Park Dam, at the confluence of the Green and Yampa Rivers within the Dinosaur National Monument in northwestern Colorado. The Sierra Club, led by David Brower, rallied against the proposal in the media and later in the courts. When the Bureau backed down from the Echo Park proposal, it was seen as one of the environmentalism movement's early victories – but it came with a compromise. A dam would still be built on the Green River, just upstream near a brilliant red-rock canyon called Flaming Gorge. A common misconception is that the building of the controversial Glen Canyon Dam was part of this "compromise for Echo Park", but in reality the Bureau had always planned to build a dam at Glen Canyon regardless of the outcome of the Echo Park debate.
Climate
Construction
The building of Flaming Gorge Dam started just a few months after the CRSP was approved in Congress, when President Dwight D. Eisenhower pressed a button on his desk in the White House and set off the first blast in Red Canyon. Site preparations and geologic inspections continued as Dutch John, the company town that provided housing for the workers, was completed just northeast of the dam site by 1958. More than 3000 people would inhabit Dutch John at the peak of construction. The main contract for dam construction was awarded to Arch Dam Constructors, a conglomerate of Peter Kiewit Sons, Morrison-Knudsen Company, Mid-Valley Utility Constructors Inc. and Coker Construction Company. Actual construction at the dam site did not begin until late 1958, when work began on the diversion tunnel that would send the Green River around the dam site in order to clear it.By April 1959, excavation of the diversion tunnel had been completed and concrete lining was finished on August 17. Work on a pair of earthen cofferdams above and below the dam site commenced when the tunnel was ready and the river was channeled around the dam site on November 19 with the completion of the upper cofferdam. Keyway excavations for the dam on the right abutment and construction of the spillway inlet works in the left abutment was begun in September, and all preliminary canyon wall structures were complete by early 1960. The lower cofferdam was finished in February, allowing workers to pump water out of the space between the two barriers. The silt and sediment that comprised the riverbed had to be removed in order to reach solid rock where foundations could be drilled; this was completed in August 1960, allowing work on the main dam foundations to begin.
Flaming Gorge was built in block-shaped stages of concrete called "forms". The first concrete for the powerhouse was placed on September 8, and construction of the main dam wall began ten days later. In order to accelerate hardening of the concrete, cold water was pumped through metal tubing, or "coils", embedded in the structure. Concrete placement continued until November 15, 1962, when workers topped out the dam. By the end of 1962, both the river outlet works and the spillway tunnel were completed, and the diversion tunnel was closed, allowing water to begin rising behind the dam. The dam's hydroelectric generators were installed by mid–August 1963 and the first unit went into operation on September 27 at the press of a switch by President John F. Kennedy. The dam was officially dedicated by Lady Bird Johnson on August 17 of the following year.
Dimensions and operations
Dam and reservoir
The Flaming Gorge Dam stands high above its foundations and above the Green River. It measures long along its crest, with a maximum base thickness of, while its crest thickness is. The dam contains about of concrete. The reservoir first reached its maximum elevation of in August 1974, with a maximum surface area of. The conservation storage capacity is, of which is active capacity, useful for release and power generation. During floods the reservoir can go about higher, for a total of, spreading over.Power plant
The dam's hydroelectric power plant is located at its base. It consists of three 50,650 kilowatt generators, powered by three Francis design turbines of. The total nameplate generating capacity of the Flaming Gorge Dam is 151,950 kilowatts. Three diameter penstocks feed water to the power plant. The Bureau of Reclamation operates the power plant, and the Western Area Power Administration markets the power generated by the dam. The original 1963 capacity of the powerplant was 108,000 kilowatts, or 36,000 kilowatts per generator. The generators were uprated to their present capacity between August 1990 and April 1992.The power plant originally operated on a peaking basis which caused large daily fluctuations in river flow, with sharp peaks in the daytime and extremely low flows at night. In 1992, the release patterns from the dam were placed under legal constraints due to a biological opinion to protect endangered fish species. In 2006 the release patterns were further modified under an "Action Alternative" designed by the U.S. Fish and Wildlife Service in order to mimic natural flows. The power plant now releases water based on the natural seasonal hydrograph of the Green River before damming. In addition, water flows must be maintained above at all times.
On August 11, 1977, the Unit 2 turbine, jammed after one of the sealing rings on the penstock failed. This event led to the seal rings on all three penstocks being replaced. These seal rings also failed, and were replaced again. However, no major structural damage to the dam occurred.
Spillways
The spillway consists of a long tunnel that runs through the left abutment of the dam. Two gates at the tunnel entrance will pass up to of floodwater. At its upstream end the tunnel is in diameter, and at the discharge point is in diameter. The dam's outlet works consist of two diameter steel pipes through the dam. The discharge capacity of the outlet works is. Due to the large storage capacity of the reservoir, the tunnel spillway is rarely used, except for high water years such as 1983–84. As originally built, the spillway suffered cavitation damage caused by the high velocity of water rushing over the concrete lining. The installation of an aeration slot in the spillway in the mid-1980s remediated these problems.Environmental impacts
By halting floods and artificially increasing low flows, Flaming Gorge Dam has changed the characteristics of the Green River tremendously, especially above its confluence with the Yampa River: "The deafening roar of the spring flood through the Canyon of Lodore in Dinosaur National Monument is subdued to the point that the sound no longer conveys a sense of the power that created this very place."River regulation has led to the growth of riparian zones along the Green River where they would not have developed naturally because of the erosive effects of floods. The reduction in flow changes has also caused a decline in amphibian habitat along the river. The dam traps the river's high sediment loads, which has been detrimental to many native fish stocks. The cold and clear water releases have caused loss of sandbars, bank erosion, and as a result crucial habitat of four species of native fish in parts of the Green River have been lost. On August 28, 2008, the Bureau of Reclamation prepared an EIS on the operation of the dam to meet the river flow required by Section 7 of the Endangered Species Act. The four native fishes affected are the razorback sucker, Colorado pikeminnow, humpback chub, and bonytail chub.
The cold water, however, has allowed the proliferation of introduced trout populations. About of the Green River below the dam is designated as a "Blue Ribbon Trout Fishery", below which the water tends to be warmer and more suitable for native species. In addition, Flaming Gorge Reservoir has become "nationally known for the spectacular fishing available in the reservoir's cool clear water which is ideal for growing large trout".