The Eastern Mediterranean pipeline or simply EastMed is a planned offshore/onshore natural gas pipeline, directly connecting East Mediterranean energy resources to mainland Greece via Cyprus and Crete. The project, currently in design, will transport natural gas from the off-shore gas reserves in the Levantine Basin into Greece, and in conjunction with the Poseidon and IGB pipelines into Italy and other European regions. The pipeline will have a length of approximately 1,900 km, reach depths of 3km, and have a capacity of 10 billion cubic meters per year. Construction of the pipeline is expected to be cost approximately €6 billion. The pipeline is being developed by IGI Poseidon S.A., a 50-50% joint venture between the Greek gas utility DEPA and the Italian gas utility Edison. On 2 January 2020, the EastMed Pipeline accord was signed in Athens by the leaders of Greece, Cyprus, and Israel. On 19 July 2020, the Israeli government officially approved the accord, allowing the signatory countries to move forward with plans to complete the pipeline by 2025.
Timeline
In 2013 the construction of the EastMed pipeline was designated under European Commission Regulation 347/2013 as a Project of Common Interest and during the 2015-2018 period the Commission contributed more than €34.5 million to complete technical, economic and environmental studies for the project. The Energy Triangle of Greece, Cyprus, and Israel signed an intergovernmental agreement for the EastMed gas pipeline in Tel Aviv on 20 March 2019 in the presence of United States Secretary of StateMike Pompeo, in a sign of support from Washington for the project. American interest on the pipeline is explained by Washington's demand that its European partners maintain a diversification policy of their energy imports. The pipeline will diversify European gas supplies and lessen dependence on Russian Natural Gas. In April 2019, the European Commission labeled the EastMed pipeline as a Project of Common Interest, having contributed €34.5 million to complete technical studies for the project. On 7 May 2019, Italian prime ministerGiuseppe Conte stated, at an event near Rome, that Italy will oppose the construction of Poseidon pipeline; the last section of EastMed connecting Greece and Italy via the Adriatic Sea, putting the entire project under consideration. However, on 1 January 2020, it was reported that the Italian Minister of Economic DevelopmentStefano Patuanelli had sent to his Greek counterpart a letter of support for the EastMed pipeline, thus reinstating the backing of Italy for the project. On 2 January 2020, the accord to construct the pipeline was signed in Athens by the leaders of Greece, Cyprus, and Israel. Cypriot President Nikos Anastasiadis and Israeli Prime MinisterBenjamin Netanyahu characterised the accord as "historic". The accord includes provisions for ensuring the security of the pipeline and a common tax regime. The Israeli government approved the accord on 19 July 2020, allowing the project to move forward. Following a final investment decision between the countries in 2022, construction of the pipeline is scheduled for completion by 2025.
Route
The pipeline will connect the Leviathan and Aphrodite gas fields in the Eastern Mediterranean to Europe. The pipeline will begin in the Levantine Basin and make landfall in Cyprus, where a compressor station will be located. From Cyprus, the pipeline will continue west for approximately 700 km, reaching depths of 3 km, and make landfall in eastern Crete. A compressor station on Crete will enable the supply of natural gas to the island. From Crete, the pipeline will continue northwest and make landfall in the eastern Peloponnese, near the village of Agios Fokas. The pipeline will cross the Peloponnese in a NW direction, cross the Gulf of Patras, and continue along western mainland Greece, ending in the Thesprotia region. From there, the proposed Poseidon pipeline will connect to Italy.
EastMed Gas Forum
In January 2019, seven energy ministers in the region penned a deal to set up the East Mediterranean Gas Forum. Total S.A., Eni and Novatek and Exxon have signed exploration and production agreements with the relevant governments. Turkey is referred to being the exception to regional tranquility. The current state members of the group are: Egypt, Cyprus, Israel, and Greece. Representatives of Palestine and Jordan have attended the meetings of the East Mediterranean Gas Forum. In January 2020, France and the United States asked to join the Forum, as a member and permanent observer respectively.