Crewe–Liverpool line


The Crewe–Liverpool line is a railway line in North West England, running from on the West Coast Main Line to via Weaver Junction.

History

The line was built in stages by the Liverpool and Manchester Railway, the St Helens and Runcorn Gap Railway and the London and North Western Railway during the mid-19th century. The route became part of the London, Midland and Scottish Railway in 1923, passing to the London Midland Region of British Railways in 1948.

Electrification

The line was electrified at 25 kV AC, using overhead wires under the BR 1955 Modernisation Plan. In 1959, preparations began at Liverpool Lime Street for the first stage of electrification of the West Coast Main Line. On 1 January 1962, electric services between Liverpool Lime Street and Crewe officially began.

Weaver Junction to Liverpool signalling

Re-signalling work from Liverpool to Weaver Junction was underway in 2016. Signal control will move to the Manchester rail operating centre removing five local signal boxes. The signal improvements will improve journey times on this section of track.

Services

Services along the full length of the line are operated by Avanti West Coast and London Northwestern Railway, with East Midlands Railway, Northern and TransPennine Express operating between and Lime Street, a section which is shared by the Liverpool–Manchester lines.