The Corris Railway is a narrow gauge preserved railway based in Corris on the border between Merionethshire and Montgomeryshire in Mid-Wales.
The line opened in 1859 as a horse tramway, running originally from quays on the River Dyfi at Morben and Derwenlas, skirting the town of Machynlleth and then following the Dulas Valley north to Corris and on to Aberllefenni. Branches served the slate quarries at Corris Uchaf, Aberllefenni, the isolated quarries around Ratgoed and quarries along the length of the Dulas Valley.
The railway closed in 1948, but a preservation society was formed in 1966, initially opening a museum; a short section of line between Corris and Maespoeth was re-opened to passengers in 2002. The railway now operates as a tourist attraction. A new steam locomotive was built for the railway, which was delivered in 2005. The two surviving locomotives, plus some of the original rolling stock, are preserved on the nearby Talyllyn Railway.
The gauge of the railway is which is unusual, and was shared by only three other public railways in the United Kingdom: the Talyllyn Railway, the short-lived Plynlimon and Hafan Tramway and the Campbeltown and Machrihanish Light Railway.

History

Precursor schemes: 1850 to 1858

The first proposal to construct a railway to connect the slate quarries in the district around Corris, Corris Uchaf and Aberllefenni with wharves on the estuary of the Afon Dyfi west of Machynlleth was made in November 1850 with Arthur Causton as engineer. At this time slate from the quarries was hauled by horse-drawn carts and sledges to transport their output to the river. The proposed Corris, Machynlleth & River Dovey Railway or Tramroad would have run down the Dulas Valley and then along the north shore of the Dyfi past Pennal to Pant Eidal, near the later main-line Gogarth Halt. The bill was initially withdrawn, then resubmitted in December 1851. The bill specified the tramroad's gauge as ; due to the narrow gauge selected, the House of Lords committee imposed a restriction in the bill that forbade the use of locomotives.
This 1851 scheme was not constructed, and was followed by two further proposals in the early 1850s. Following the plans for a railway along the Dyfi valley, these early proposals were shelved.
In December 1857, a fourth bill was set before Parliament to create the Corris Machynlleth & River Dovey Tramroad. This was similar to the 1851 scheme, proposing a tramway from the "machine house" at Aberllefenni, down to the wharf at "Cae Goch on the River Dovey" with a short onward branch to Morben. The gauge specified for the tramroad was increased to, and the same restriction forbidding locomotives was imposed. This bill was passed on 12th. July 1858.

The Tramroad Era: 1858 to 1878

After more than eight years of proposals, the 1859 scheme was the one that was built. Construction proceeded quickly, and by April 1859 the tramroad opened between Corris and Machynlleth. The line through to Aberllefenni was built later, as was the southern line to Derwenlas. It is thought that the tramroad never reached Morben.
On 3 January 1863 the standard gauge Newtown and Machynlleth Railway had opened, followed on 1 July of the same year by the Aberystwith and Welsh Coast Railway's line from Machynlleth to Borth. These two lines became part of the Cambrian Railways by August 1865. The opening of the standard gauge line to Borth made the section of the CM&RDT from Machynlleth to Derwenlas obsolete. It was much easier to transship slates to the main line at Machynlleth, so the lower section of the tramway was abandoned.
In 1862, a new Bill was deposited, seeking to extend the Upper Corris Tramway to iron ore mines at Tir Stent, near the pub at Cross Foxes. The bill also sought powers to raise further capital for the tramroad and allow the use of locomotives. But the directors of the Aberystwith & Welsh Coast Railway objected and the Bill failed. Another similar Bill was deposited in December 1863, and again the A&WCR opposed it. This time, however, they withdrew their objection; the CM&RDT company had been acquired by Thomas Savin, who was the principle contractor in the construction of the tramroad, and Savin had offered to sell the company to the A&WCR. The second Bill passed on 25 July 1864; it formally converted the tramroad to a railway changing the company's name to the Corris Railway Company', allowed the use of steam locomotives and allowed the abandonment of the section west of Machynlleth.
It took until the 1870s for work to begin to upgrade the Corris Railway to a standard where locomotives could be used. The original tramroad was laid with light bridge rail suitable for waggons to traverse as they were pulled by horses. These rails would not support the weight of much heavier steam locomotives. In 1878 control of the railway passed to the Imperial Tramways Company of London. The new owners saw the potential for passenger traffic on the Corris Railway and ordered the first passenger carriages for the railway, even though the Act of 1864 did not permit passengers to be carried. They also appointed Joseph R. Dix, son of the main-line stationmaster at Machynlleth, as Manager in successor to David Owen.

The Dix Years: 1879 to 1906

In 1880 and 1883, two new Acts were obtained which adjusted the tolls on the railway and permitted the carriage of passengers. The second of these Acts was necessary because the owners of the quarries served by the railway objected that passenger trains would interfere with their mineral traffic. Initially the railway ran a test passenger service on the local roads; this proved to be so popular that they were able to pass the parliamentary act over the opposition of the quarry owners. It was also the first instance of a long history of the Corris Railway operating passenger road services in the area.
In December 1878 the first steam locomotive purchased from the Hughes Locomotive Company arrived. By February 1879 it had been joined by the other two that had been ordered and all three had begun work. Although the carriages arrived in 1878 it was not until 1883 that the Act of Parliament was secured to allow the formal commencement of passenger services. A semi-official passenger service had been running since the early 1870s using adapted waggons to convey quarry workers and visitors.
The line was now in its settled form and began to operate a full service under Dix's energetic management. The railway was widely promoted to visitors as the best route to Tal-y-llyn Lake and Cader Idris. The initial passenger service ran from to, with new stations at and opening in 1884. The track was upgraded beyond Corris so that passenger services could reach the line's northern terminus at, with services starting on 25 August 1887, and in the same year stations were also opened at and.
on the "Grand Tour"
The railway developed a network of horse-hauled road services, including providing a link between Corris station and Abergynolwyn station on the Talyllyn Railway. This was promoted as part of a circular "Grand Tour" which took in the two narrow gauge railways and the Cambrian service between Tywyn and Machynlleth.
In 1892 control of Imperial Tramways moved to Bristol and George White of Bristol Tramways became chairman and Clifton Robinson became managing director. In the 1900s Bristol motor buses were sent by the parent company to run the road services.

Decline: 1906 to 1930

Following a dispute with the directors Dix was dismissed and replaced by John J O'Sullivan. The closure of Braichgoch Quarry in 1906 brought the railway its first loss, and although the line continued on through subsequent decades, serving the quarries around Corris and Aberllefenni, it never again showed a profit. As well as slate and passengers, the line hauled timber extracted from the Dyfi forest in the 1910s through 1930s. There was also a constant traffic in coal and general goods to the quarries and communities served by the railway.
After World War I, the decline in slate traffic continued as cheaper foreign slate and alternative roofing materials became popular. O'Sullivan had died in office in 1917; the parent company's Secretary, Frederick H Withers, acted as manager until a new manager, Daniel J McCourt took over in 1921 and was responsible for developing and extending the connecting bus services as partial compensation for the decline in rail traffic.

Takeover and nationalisation: 1931 to 1948

In late 1929 Imperial Tramways sold the Corris to the Great Western Railway, who by that time were the owners of the main line serving Machynlleth, whose primary interest was taking control of the railway's bus routes. After running a bus in direct competition with the railway in 1930, the railway's passenger service was withdrawn at the beginning of 1931. While the GWR did not relish owning another Welsh narrow gauge line, they did perform some track maintenance, and on at least two occasions the rolling stock was repainted.
On 1 January 1948, the line was nationalised along with its parent company, becoming part of British Railways. While the GWR had tolerated the Corris, BR was looking for an excuse to close the loss making railway. In August 1948, that excuse came when the River Dyfi flooded. The waters began to undermine the Corris Railway embankment on the south side of the Dovey Bridge, and although the track was never breached, it was the excuse that BR needed to close the line. The last train ran on 20 August 1948 and the following day the railway was closed, without notice. The Aberllefenni to Corris section was lifted in November 1948, and 10 tons of the rail was purchased by Henry Haydn Jones for use on his Talyllyn Railway. By the end of 1950, track lifting had reached Machynlleth station.
In 1951, the Talyllyn Railway became the first railway in the world to be preserved. The Talyllyn purchased the two remaining locomotives, which had been stored out of use at Machynlleth, along with several goods waggons and the brake van - see List of Talyllyn Railway rolling stock. In 1958, the Talyllyn also purchased one of the Corris carriages, which had been in use as a summerhouse in a garden in Gobowen.

Preservation

Early days: 1966 to 1980

In December 1966 a group of enthusiasts led by Alan Meaden, formed the Corris Society with the aim of preserving what was left of the railway, opening a dedicated museum, and to explore the possibility of reviving some or all of the line. Many of the founding members of the Society were volunteers on the nearby Talyllyn Railway.
Other than at Aberllefenni and Braichgoch quarries, no rails remained in situ along the Corris route. Initially the Society sought to purchase Machynlleth station for its museum, but when this proved impossible it turned its sights elsewhere. The main buildings of Corris station were demolished in 1968 leaving only the adjacent railway stable block standing, and these buildings - badly in need of maintenance - were acquired, along with a short section of trackbed leading southwards. In 1970 the first part of the building was opened as the Corris Railway Museum. A short length of "demonstration" track was laid in 1971.
During the 1970s the Society undertook lengthy negotiations with the relevant authorities to establish the requirements for re-opening the line for passengers, while steadily building up funds and equipment. A new Corris Railway Company, reviving the original name, was incorporated to act as the Society's trading and operating arm, while the Society achieved charitable status. The Museum was extended as more of the building was returned to satisfactory condition.

Restoring from Maespoeth: 1981 to 2001

In 1981 the line's original locomotive shed at Maespoeth was acquired and became the railway's operational base. During the 1980s light track was laid between Maespoeth and Corris, a distance of just under a mile. The formal "first train" back to Corris ran in 1985. In the following years the track was upgraded to passenger standards while negotiations with the authorities continued.

Passenger services resume: 2002 to present

In the summer of 2002 passenger services resumed after a break of seventy-two years, initially diesel-hauled. The railway built a new steam locomotive, to a design based on the Kerr Stuart No.4, which arrived on the railway on 17 May 2005 and runs as No.7. No. 7 went into service on 20 August 2005, fifty-seven years to the day since the last train on the original railway, and now hauls the regular passenger service between Corris and Maespoeth.
The railway is also actively pursuing a southwards extension towards Machynlleth, with the initial aim of extending the line to Tan-y-Coed, midway between Esgairgeiliog and Llwyngwern and some two and a half miles south of Corris. As always, this is involving lengthy negotiations with the authorities, not least due to the line south of Maespoeth running immediately adjacent to the A487 trunk road. While these are continuing the railway has consolidated its facilities at Maespoeth with the construction of a new two-road carriage shed in the adjacent field. In 2015 work began on building the new diversion embankment to enable the southerly extension.
During 2009 the railway marked the 150th anniversary of the first train on the Corris with a series of events, including demonstration horse-worked freight trains and gravity runs of rakes of waggons.
The revived Corris Railway has maintained friendly links with the Talyllyn Railway, which resulted in both of the original Corris locos and rolling stock returning to the railway. In 1996 ex-Corris loco No. 4 returned to celebrate its 75th anniversary. In 2003 ex-Corris loco No. 3 returned on the occasion of its 125th anniversary with a heritage train of coach No 17, brake van No. 6 and two trucks. Corris No. 5 visited the Talyllyn Railway in 1983 and 1990, and No. 7 in October 2011. It hauled a few charter trains and played a part in the TR's Corris Weekend, when it ran with the two surviving ex Corris engines; No. 4 and No. 3 and stock.
Both the surviving original locomotives have visited the Corris since its reopening. In 2012 No. 3 featured in a steam Gala over May Bank Holiday weekend along with the railway's resident steam loco No. 7.
No. 3's boiler ticket expired on 17 May 2012 and the loco was on static display at Maespoeth until February 2013 when the loco left the Corris to tour heritage railways and museums in the UK to raise awareness of the Talyllyn and to raise funds for its overhaul.

About the railway

The Corris Railway had several unusual features:

Stations and halts

The Corris Railway had numerous branch lines, mainly built to serve the slate quarries along its route. The principal branches were:
Only the Aberllefenni Quarry tramway may have been locomotive worked, and in the 1960s and 1970s a tractor was used to haul waggons along it. The rest of these branches were operated by gravity and horses.
Other temporary branches were built to aid forestry works from the First World War until the 1930s.

Quarries served

The principal reason for the existence of the Corris Railway was to serve the slate quarries of this district. Although usually referred to as quarries, those on the Narrow Vein were usually underground mine workings, following the course of the vein, while those on the Broad Vein were more usually opencast quarries. The outliers in the south of the valley were also opencast. This list shows the main quarries that the railway served:
The railway also served Y Magnus, a slate enamelling works situated between Aberllefenni and Garneddwen with its own tramway.

Locomotives

Original railway

Three locomotives were supplied in 1878, and partially rebuilt between 1883 and 1900 from s to s. By the 1920s the locomotives were badly worn. A new locomotive, No. 4, was supplied in 1921. In 1923, parts from Nos. 1 and 3 were combined to produce one working locomotive, which carried the number 3. The remaining original locomotive, No 2, was held in reserve until 1928. A report dated 12 October 1929 stated that locomotives 1 and 2 had been "marked off for some time as scrap" and the remains of both engines were handed over to a local scrap merchant and excluded from the assets taken over by the GWR.
The locomotives that ran on the original Corris Railway between 1878 and 1948 were:
NumberImageBuilderTypeWorks NumberBuiltNotesCurrent StatusCurrent location
1Hughes Locomotive Company, in Falcon Works3241878Originally built as an, scrapped 1930ScrappedN/A
2Hughes Falcon Works3221878Originally built as an, scrapped 1930ScrappedN/A
3Hughes Falcon Works3231878Originally built as an. In 1927 it was rebuilt using parts from all three Hughes locomotives. Purchased by the Talyllyn Railway in 1951, and named Sir Haydn.OperationalTalyllyn Railway
4Kerr Stuart40471921Tattoo class locomotive, purchased by the Talyllyn Railway in 1951. Then given the name Edward Thomas.OperationalTalyllyn Railway

Preserved railway

Locomotives brought to the restored Corris Railway since 1967 have been numbered in the original locomotive numbering series, from 5 onwards. They are:
NumberImageNameBuilderTypeWorks NumberBuiltNotesCurrent StatusPassenger train certified
5Alan MeadenMotor Rail Simplex222581965Purchased in 1974, ex-Staveley Lime Products, Hindlow, Derbys. Formerly gauge. Named in honour of the Society's founder.OperationalNo
6Ruston and Hornsby5184931966Purchased in 1982, ex-BICC Prescot, Merseyside. Formerly gauge.OperationalYes
7Winson Engineering
and Drayton Designs
172005Built for the railway, based on the Kerr Stuart "Tattoo" class design of No. 4OperationalYes
8Hunslet72741973Ex-Houghton Main Colliery, Barnsley. On long term loan from the National Coal Mining MuseumAwaiting overhaulNo
9AberllefenniClaytonB04571974Ex-Aberllefenni Slate Quarry. Donated and named by Wincilate LtdOperationalNo
10Corris RailwayUnder constructionBased on the first three locomotives which first ran the line. Being built as funds are raised and expected to be complete within 5 to 10 years.Under constructionN/A
11Orenstein & Koppel257211957Purchased in 2015 from Austria, rewired, regauged and repainted in Romania May 2015OperationalYes

Usage

Locomotive 7 is the only steam engine, but will share passenger duties with locomotive 10 on completion. Locomotive 11 is the main diesel motive power unit for both works trains and out of season passenger trains, supported by the lighter diesel locomotives 5 and 6, which are currently the main works and shunting units.

Carriages

Historic

The original railway had ten four-wheel, tramcar-like carriages, built at the Falcon Works, Loughborough, and numbered from 1 to 10, with a brake van from the same source taking the number 11. The first bogie carriage, also from Falcon, which looked like two four-wheel bodies mounted on a single chassis, received number 12, and the four-wheelers were rebuilt over a five-year period on new chassis to form five bogie vehicles. A renumbering had the rebuilds as 1 to 5 and the former 12 becoming 6.
Two all-new carriages to a similar design were built by the Metropolitan Railway Carriage and Wagon Company Ltd and numbered 7 & 8. Nos. 1 to 6 disappeared, presumed scrapped, after 1930; however Nos. 7 and 8 were used by a GWR employee at his home in Gobowen and subsequently preserved. No. 8 was recovered in 1958 and rebuilt for use on the Talyllyn Railway as their No.17 while No.7 was recovered ten years later and is on display in the Corris Railway Museum. The brake van was also preserved on the Talyllyn but has been substantially rebuilt after being damaged in a fire.
Sequential NumberNumber
Old CR system
Number
New CR system
Wheel typeBody typeBuilderFate
114-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
224-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
334-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
444-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
554-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
664-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
774-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
884-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
994-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
10104-wheelShort tramFalcon WorksBodywork incorporated into new bogie coach.
1111114-wheelCorris brake vanFalcon WorksIn service at Talyllyn Railway as TR 6.
12126BogieCorris bogieFalcon WorksScrapped after 1930.
131BogieCorris bogieCorris RailwayScrapped after 1930.
142BogieCorris bogieCorris RailwayScrapped after 1930.
153BogieCorris bogieCorris RailwayScrapped after 1930.
164BogieCorris bogieCorris RailwayScrapped after 1930.
175BogieCorris bogieCorris RailwayScrapped after 1930.
187BogieCorris bogieMetropolitan Carriage & WagonOwned by Corris Railway. Partially restored as museum exhibit.
198BogieCorris bogieMetropolitan Carriage & WagonOwned by Talyllyn Railway. Fully restored and in service as TR 17..

Current

As nineteen passenger vehicles ran on the original railway, the preservation Society has numbered its new build carriages from 20 onwards.
Carriage 7 is an original bogie carriage, but not available for service. It is on display in the railway museum at Corris.
Carriage 20 is similar in appearance to the bogie vehicles, but on a shorter, ex-National Coal Board four-wheel chassis. The southern compartment has now been adapted for the use of the train guard.
Carriage 21 and carriage 22 have been designed to appear as similar as possible to the original 19th Century bogie vehicles, but constructed to 21st Century safety standards with a steel chassis based on the Talyllyn Railway's standard bogie carriage design and a steel skeleton with timber cladding for the body. Carriage 21 has a plain roof, and carriage 22 has a clerestory roof, similar to those carried by two original carriages in the 1920s. Since September 2015 the railway has been able to run an authentic-looking "1920s" train with the "Tattoo" locomotive and two bogie carriages 21 and 22. Carriage 23 is another plain roof example; assembly of the woodwork for the body commenced in autumn 2015, with the panelling and beading completed by the end of 2017; painting and fitting of seats continued during the Coronavirus lockdown, and the completed carriage was mounted on its bogies and test run in July 2020.
Carriage 24 is currently under construction at Maespoeth. It will have a clerestory roof. The main frame is constructed, and the metal body frame has been added.
NumberWheel typeBody typeRoof typeEntered serviceNotes
7BogieCorris all-wooden originalElliptical1898Partially restored. Not in service.
204-wheelCorris style new buildElliptical2002Built on ex-NCB chassis.
21BogieCorris steel-framed new buildElliptical2003
22BogieCorris steel-framed new buildClerestory2015
23BogieCorris steel-framed new buildElliptical2020Completed, awaiting commissioning.
24BogieCorris steel-framed new buildClerestory-Under construction.