CityLink


CityLink is a network of Tollways in Melbourne, Australia, linking the West Gate, Tullamarine and Monash Freeways and incorporating Bolte Bridge, Burnley Tunnel and other works. In 1996, Transurban was awarded the contract to augment two existing freeways and construct two new toll roads – labelled the Western and Southern Links – directly linking a number of existing freeways to provide a continuous, high-capacity road route to, and around, the central business district. CityLink uses a free-flow tolling electronic toll collection system, called e-TAG. CityLink is currently maintained by Lendlease Services.

History

The first mention of a southern and western inner city bypass was in the 1969 Melbourne Transportation Plan. The plan advocated for reservations and set aside sinking funds for the new inner city freeway system. It was one of the few freeways connecting to the inner city which was not later abandoned.
The proposal to build CityLink was first announced in May 1992 and received the State Government's formal approval in mid-1994. The contract was awarded in 1995 to a consortium of Australia's Transfield Holdings and Japan's Obayashi Corporation, which then formed Transurban. The total value of the project was estimated in 1996 at about $1.8 billion, and the concession to operate the road was initially due to expire in 2034. This concession has since been extended, and is now due to expire in 2045.
CityLink was built between 1996 and 2000 and was eight times larger than any other road project in Melbourne of that time. Toll plazas for manual tolling were deemed impractical, and delays associated with plaza operations would have decreased the advantages of using the new road. The decision to use only electronic toll collection was made in 1992; at a time when there was little practical experience of such systems. The first of the sections opened to traffic in August 1999, with tolling commencing on 3 January 2000 before final completion occurred on 28 December 2000 with tolling commencing the same year.
The Exhibition Street Extension was not part of the initial project, as the project had been promoted as a bypass that would keep cars out of the CBD. Under a contract announced in April 1998, Transurban would operate the road and collect tolls from road users, with the road being opened in October 1999.

Existing freeways

Previously, the city centre was served by four separate freeways:
CityLink saw the widening and upgrading of the inner sections of the Tullamarine and Monash Freeways, as well tolls being imposed, which attracted criticism from road users.

New freeways

Western link

The elevated Western Link extends the existing Tullamarine Freeway, lengthening it to terminate it five kilometres further south at the West Gate Freeway in Port Melbourne. It includes a new major bridge over the Yarra River in the Docklands; a long elevated section over Dudley Flats and Moonee Ponds Creek and a tube-like sound barrier in Flemington where the road passes close to a number of community housing towers. A short distance to the north of the sound tube, a massive sculptural work was placed, called the Melbourne International Gateway, consisting of a giant yellow beam hanging diagonally across the road and a row of smaller red beams alongside the road. The Tullamarine Freeway was also widened from Bell Street to Flemington Road, with a transit lane being added in each direction.
This section of Freeway was originally designated in the 1969 Melbourne Transportation Plan as part of the F14 Freeway Corridor.

Southern link

The underground southern link directly connects the ends of the West Gate and Monash Freeways into one continuous through-way. This link comprises the Burnley and Domain Tunnels which pass under the Royal Botanic Gardens and the Yarra River, each tunnel channelling traffic in different directions. This link also includes a connection to the CBD from the Monash Freeway over a bridge extension of Exhibition Street over the nearby railway lines.
This section of Freeway was shown in the 1969 Melbourne Transportation Plan as part of the F9 Freeway corridor as a surface-level road.

Citylink–Tulla widening (2015–2018)

Project overview

The freeway had extensive upgrades between 2015 and 2018, including the addition of lanes as part of the CityLink Tulla Widening Project.

Original proposal (2014)

The original project was announced in April 2014 by then-Premier Denis Napthine as an unsolicited proposal by Transurban, with Transurban providing the bulk of the funds for the upgrade. The original design would have involved the widening of the entire Western Link of Citylink up to Bulla Road and the Tullamarine Freeway from Bulla Road to Melrose Drive. In addition, Transurban's tolling concession was extended by a year, to 2035. Work on the original upgrade was expected to commence construction early–mid 2015, and was expected for completion by early–mid 2018. The original project was designed to complement the former East West Link project which was cancelled after Daniel Andrews won government at the State election in November 2014. This led to the original project being postponed, scrapped and modified.

Final proposal (2015–2018)

In August 2015 a new proposal to Widen the Citylink and Tullamarine Freeways was put into action by the recently elected Premier Daniel Andrews. The project consists of 2 Stages which would increase the road's daily capacity as well as shorten trips between Melbourne Airport and The CBD During Morning Peak and Afternoon Peak Times. The following upgrades started in October 2015 and May 2016. The entire project is anticipated to be complete by late 2018.
The upgrade involves the construction of a new lane in each direction from Melbourne Airport to Power Street, upgrades to the Bell Street, Flemington Road, English Street and Mickleham Road intersections, and the creation of a dedicated lane between the Calder and Tullamarine Freeways to Bell Street, to reduce weaving. Speed limits will be lowered on parts of the freeway during construction work, and after construction, as a result of lane narrowing. The project will also install an electronic freeway management system, involving CCTV cameras, a variable speed limit, and electronic message signs.
Controversy has arisen due to the proximity of Strathmore Secondary College to the new ramp at Bell Street. The removal of a tree as part of the Flemington Road intersection upgrade also resulted in public protest.

Stage 1 (Bulla Road to Power Street)

Part of The Upgrade is Adding More Lanes between Melbourne Airport and the West Gate Freeway. Between The Citylink and The West Gate Freeway One additional lane in each direction will be added consuming the current emergency lanes as well as lower the current speed limit from 100 km/h down to 80 km/h which sparked major controversy in the public..

Tolling system

There are no toll booths along the entire length of the system, so traffic flow is not impeded.
CityLink uses a DSRC toll system called e-TAG, where an electronic transponder is mounted on the inside of the vehicles' windscreen. Gantries constructed over each carriageway record registration plates and detect the e-TAGs, and deduct toll amounts automatically from the account linked electronically to each tag. Where a tag is not detected, the vehicle's registration is recorded using an automatic number plate recognition system and checked against a database. For infrequent use of the system one can buy a Daypass – by phone, online, at any Australia Post outlet or at participating service stations. A Daypass can be bought in advance or afterwards. If payment has not been made, the vehicle's registered owner will be sent a late toll invoice in the mail, and if the late toll invoice is then not paid a fine will be issued by Civic Compliance Victoria.
In 2018 CityLink tolling accounts were rebranded as Linkt, as part of parent company Transurban combining their existing retail brands.

Controversies

As part of the development of CityLink, existing roads were upgraded and expanded, and tolling points were added. Toll charges now apply to the Monash Freeway and the Tullamarine Freeway. These roads did not cost tolls to use before.
Some nearby roads were altered to restrict rat runs to stop people using neighbourhood back streets as short cuts to avoid the toll. Some people have viewed this as local councils 'forcing' people to use CityLink.
CityLink account holders can, if they make multiple trips in a day, pay more to use the road than a casual user. A 24-hour Pass, for example, is charged at a flat rate, but an account holder pays per trip. Account holders who make multiple trips in a single day may pay more than a pass customer would. However, CityLink recognises this and account customers can remove their e-TAG device and buy a pass for the day: just like casual customers. However, there is a limit to the number of passes that can be bought each 12 months. This limit applies to account holders and casual users.
The contract between the government and CityLink's owner Transurban has protections for both parties. One of these is the ability for Transurban to make a claim against the state government if the state government does something that reduces the number of cars that could use CityLink. In 2001 Transurban commenced legal proceedings against the State of Victoria over the construction of Wurundjeri Way through the Melbourne Docklands. It was alleged that this 'free' road was competing with CityLink and causing it to earn less revenue. This can potentially also be applied if the capacity of other roads or rail routes parallel to CityLink are expanded, however the contract specifically excludes compensation if the metropolitan rail network is extended to Melbourne Airport.
CityLink received negative media coverage when it was wrongly claimed that CityLink account holders' credit card details were stored on Transurban's public webserver and that someone had broken into the system and stolen tens of thousands of customers details. Customer details were stolen, not by an intruder via the web, but by a former employee who had misused access to the secure IT systems.
The two CityLink tunnels have regularly featured as discussion points on talkback radio, firstly for air quality. In the early days of operation, the air quality in the tunnels appeared smoggy. CityLink worked a way around the problem by adjusting the venting system which improved quality and dispersed exhaust fumes more effectively. The second issue was regarding the use of massive quantities of fresh drinking water pumped into the system to stabilise the tunnel environs. After some time, CityLink sought and obtained approval from the State Government to build a water recycling plant which meant they could rely primarily on recycled, and not drinking, water.