Chengdu–Dujiangyan intercity railway


The Chengdu–Dujiangyan intercity railway is a dual-track, electrified, passenger-dedicated, higher-speed rail line in Sichuan Province, connecting the provincial capital, Chengdu with the satellite city of Dujiangyan. The line is in length with 15 stations. China Railways CRH1 train set on the line reach a maximum speed of and make the full-trip in 30 minutes, before 2018. The line was built in 18 months and entered into operation on May 12, 2010. The railway is built to withstand an 8.0-magnitude earthquake. The Chengdu–Dujiangyan intercity railway has two branch lines: Pengzhou Branch line is in length with 6 stations, and Lidui Branch line is in length with 3 stations. In 2019, China Railways CRH6A-A train sets on the line started to operate up to.

Route

The railway runs from the Chengdu Railway Station to Dujiangyan's Qingchengshan railway station and passes through Pi County. Bridges and tunnels account for 67.8% of the line's total length. The longest viaduct is some. The line is built to withstand future earthquakes. Sound insulation panels were installed alongside the railway to reduce train noise near the tracks. Clear panels allow passengers to enjoy rural scenery along this route.
The line shortened rail travel time from Chengdu to Dujiangyan by half, and will bring more tourist traffic to Dujiangyan's World Heritage Sites, the city's ancient irrigation system and Mount Qingcheng, a sacred Daoist mountain.

Trains

The route uses CRH1 trains in eight-car train sets, which can carry 661 passengers. Each day, 14 pairs of trains are scheduled daily between Chengdu and Qingchengshan Station, and 1 pair of trains are scheduled daily between Chengdu and Dujiangyan Station. 6 pairs start Chengdu Station and head up the Pengzhou Branch.

Stations

History

On May 28, 2008, 16 days after the Wenchuan earthquake devastated Dujiangyan and the western suburbs of Chengdu, the Chengdu city government and the Ministry of Railways agreed to build a high-speed railway line as part of the reconstruction of the disaster zone. Construction began on November 4, 2008 and involved 20,000 workers at the cost of ¥13 billion. The line entered trial operation on April 1, 2010 and full commercial operation began on May 12, 2010, the second anniversary of the large earthquake that killed some 70,000 people in the region.