Bus rapid transit
Bus rapid transit, also called a busway or transitway, is a bus-based public transport system designed to improve capacity and reliability relative to a conventional bus system. Typically, a BRT system includes roadways that are dedicated to buses, and gives priority to buses at intersections where buses may interact with other traffic; alongside design features to reduce delays caused by passengers boarding or leaving buses, or purchasing fares. BRT aims to combine the capacity and speed of a metro with the flexibility, lower cost and simplicity of a bus system.
The first comprehensive BRT system in the world was the Busway in Runcorn New Town, England which entered service in 1971.
, a total of 166 cities in six continents have implemented BRT systems, accounting for of BRT lanes and about 32.2 million passengers every day, of which about 19.6 million passengers ride daily in Latin America, which has the most cities with BRT systems, with 54, led by Brazil with 21 cities. The Latin American countries with the most daily ridership are Brazil, Colombia, and Mexico. In the other regions, China and Iran also stand out. Currently, TransJakarta is considered as the largest BRT network in the world with approximately of corridors connecting the Indonesian capital city.
Terminology
Bus rapid transit takes its name from rail rapid transit, which describes a high-capacity urban public-transit system with its own right of way, multiple-car vehicles at short headways, and longer stop spacing than traditional streetcars and buses. BRT uses buses on a wide variety of rights-of-way, including mixed traffic, dedicated lanes on surface streets, and busways separated from traffic.The expression "BRT" is mainly used in the Americas and China; in India, it is called "BRTS" ; in Europe and Indonesia, it is often called a "busway"; while in the British Isles, it may be called a "quality bus". the term transitway was originated in 1981 with the opening of the OC Transpo transitway in Ottawa, Ontario, Canada.
Critics have charged that the term "bus rapid transit" has sometimes been misapplied to systems that lack most or all the essential features which differentiate it from conventional bus services. The term "bus rapid transit creep" has been used to describe severely degraded levels of bus service which fall far short of the BRT Standard promoted by the Institute for Transportation and Development Policy and other organizations.
Reasons for use
Compared to other common transit modes such as light rail or a metro, bus service is attractive to transit authorities because it does not cost as much to establish and operate: no track needs to be laid, bus drivers typically require less training and a lower stipend as compared to rail operators, and bus maintenance is less complex than rail maintenance. Moreover, buses are more flexible than rail vehicles; a bus route can be altered, either temporarily or permanently, to meet changing demand or contend with adverse road conditions with comparatively little investment of resources.However, conventional buses nearly always take longer to traverse any given route as compared to a car traversing the same route, due to a combination of factors:
- Unless a bus-only lane is present, a bus cannot go faster than other road traffic. This may become especially apparent during rush hour or other periods of substantial congestion.
- With the exception of stops that employ bus bulbs, when a bus stops to pick up or discharge passengers, it exits the flow of traffic and so cannot resume travel until it is safe to merge back in.
- Because nearly all conventional bus routes employ request stops, a bus driver must take time to scan approaching stops for passengers waiting to board, as well as drive slowly enough to stop safely should passengers be present.
- Few bus networks are fareless or use proof of payment fare collection, so a bus must wait to depart a given stop until all passengers boarding at that stop have paid their fare. In the interest of reducing fare evasion, buses typically only have one farebox onboard, so this can take a relatively substantial amount of time when use is heavy.
Bus rapid transit therefore acts as a bridge for such routes. It is somewhat more expensive and less flexible due to the infrastructure required to ameliorate the slowing effects listed above, but still notably less so than rail transit, and offers speed and capacity that, while usually not matching bespoke rail, can far exceed the capacity of conventional buses.
History
The first use of a protected busway was the East Side Trolley Tunnel in Providence, Rhode Island. It was converted from trolley to bus use in 1948. However, the first comprehensive BRT system in the world was the Busway in Runcorn, England. First conceived in the Runcorn New Town Masterplan in 1966, it opened for services in October 1971 and all were operational by 1980. The central station is at Runcorn Shopping City where buses arrive on dedicated raised busways to two enclosed stations. Professor Arthur Ling, Runcorn Development Corporation's Master Planner, claimed to have invented the concept while sketching on the back of an envelope. The town was designed around the transport system so that most residents would be no more than five minutes walking distance, or, from the Busway.in Curitiba, Brazil, was opened in 1974.
The second BRT system in the world was the Rede Integrada de Transporte, implemented in Curitiba, Brazil, in 1974. Most of the elements that have become associated with BRT were innovations first suggested by Curitiba Mayor architect Jaime Lerner. Initially just dedicated bus lanes in the center of major arterial roads, in 1980 the Curitiba system added a feeder bus network and inter-zone connections, and in 1992 introduced off-board fare collection, enclosed stations, and platform-level boarding. Other systems made further innovations, including platooning in Porto Alegre, and passing lanes and express service in São Paulo.
In the United States, BRT began in 1977, with Pittsburgh's South Busway, operating on of exclusive lanes. Its success led to the Martin Luther King Jr. East Busway in 1983, a fuller BRT deployment including a dedicated busway of, traffic signal preemption, and peak service headway as low as two minutes. After the opening of the West Busway, in length in 2000, Pittsburgh's Busway system is today over 18.5 miles long.
The OC Transpo BRT system in Ottawa, Canada, was introduced in 1983. The first element of its BRT system was dedicated bus lanes through the city centre, with platformed stops. The introduction of exclusive separate busways occurred in 1983. By 1996, all of the originally envisioned 31 km Transitway system was in operation; further expansions were opened in 2009, 2011, and 2014. As of 2019, the central part of the Transitway has been converted to light rail transit, due to the downtown section being operated beyond its designed capacity.
In 1995, Quito, Ecuador, opened trolleybus BRT. The TransMilenio in Bogotá, Colombia, opening in 2000, was the first BRT system to combine the best elements of Curitiba's BRT with other BRT advances, and achieved the highest capacity and highest speed BRT system in the world.
In January 2004 the first BRT in Southeast Asia, TransJakarta, opened in Jakarta, Indonesia., at, it is the longest BRT system in the world.
buses travelling on O-bahn in Adelaide, Australia.
Africa's first BRT system was opened in Lagos, Nigeria, in March 2008 but is considered as a light BRT system by many people. Johannesburg's BRT, Rea Vaya, was the first true BRT in Africa, in August 2009, carrying 16,000 daily passengers. Rea Vaya and MIO were the first two systems to combine full BRT with some services that also operated in mixed traffic, then joined the BRT trunk infrastructure.
Main features
BRT systems normally include most of the following features:Dedicated lanes and alignment
Bus-only lanes make for faster travel and ensure that buses are not delayed by mixed traffic congestion. A median alignment bus-only keeps buses away from busy curb-side side conflicts, where cars and trucks are parking, standing and turning. Separate rights of way may be used such as the completely elevated Xiamen BRT. Transit malls or 'bus streets' may also be created in city centers.Off-board fare collection
Fare prepayment at the station, instead of on board the bus, eliminates the delay caused by passengers paying on board.Intersection treatment
Prohibiting turns for traffic across the bus lane significantly reduces delays to the buses. Bus priority will often be provided at signalized intersections to reduce delays by extending the green phase or reducing the red phase in the required direction compared to the normal sequence. Prohibiting turns may be the most important measure for moving buses through intersections.Platform-level boarding
Station platforms should be level with the bus floor for quick and easy boarding, making it fully accessible for wheelchairs, disabled passengers and baby strollers, with minimal delays.High-level platforms for high-floored buses makes it difficult to have stops outside dedicated platforms, or to have conventional buses stop at high-level platforms, so these BRT stops are distinct from street-level bus stops. Similar to rail vehicles, there is a risk of a dangerous gap between bus and platform, and is even greater due to the nature of bus operations. Kassel curbs or other methods may be used to ease quick and safe alignment of the BRT vehicle with a platform.
A popular compromise is low-floor buses with a low step at the door, which can allow easy boarding at low-platform stops compatible with other buses. This intermediate design may be used with some low- or medium-capacity BRT systems.
The MIO system in Cali pioneered in 2009 the use of dual buses, with doors on the left side of the bus that are located at the height of high-level platforms, and doors on the right side that are located at curb height. These buses can use the main line with its exclusive lanes and high level platforms, located on the center of the street and thus, boarding and leaving passengers on the left side. These buses can exit the main line and use normal lanes that share with other vehicles and stop at regular stations located on sidewalks, located to the right side of the street. For the system to work, users have the right to receive "credit" on the electronic cards: in this manner, passengers that have no money left on the cards can take the bus on sidewalk stops where there is no possibility to recharge these cards. This means that the balance in the card can be negative, up to two ticket fares, so passengers can take the bus in the street and recharge the card once they reach a main line station. As the card itself costs more than the maximum negative balance, the passenger has no incentive to default on his negative credit. Transmilenio in Bogotá followed suit in 2014 also creating routes that can use main line stations and regular sidewalk stations, but instead of giving credit to passengers to allow boarding the bus on sidewalks, published a map readable in smart phones giving the location of a dense network of 4,000 recharging points, located in internet cafes and other business, that use a swipe-card terminal for recharging. This system has the additional benefit of diminishing queues on main line stations.
Additional features
High capacity vehicles
High-capacity vehicles such as articulated or even bi-articulated buses may be used, typically with multiple doors for fast entry and exit. Double-decker buses or guided buses may also be used. Advanced powertrain control may be used for a smoother ride.Quality stations
BRT systems typically feature significant investment in enclosed stations which may incorporate attractive sliding glass doors, staffed ticket booths, information booths, and other more standard features listed above. They will often include level boarding, using either low-floor buses or higher boarding platforms level, and multiple doors to speed passenger boardings and enhance accessibility to disabled passengers. Fare validation upon entry to the station in a similar manner to that used on entry to a subway system is also common, particularly at busy stations. An example of high-quality stations include those used on TransMilenio in Bogotá since December 2000, the MIO in Cali since November 2008, Metrolinea in Bucaramanga since December 2009, Megabús in Pereira since May 2009. This design is also used in Johannesburg's Rea Vaya. The term "station" is more flexibly applied in North America and ranges from enclosed waiting areas to large open-sided shelters.Prominent brand or identity
A unique and distinctive identity can contribute to BRT's attractiveness as an alternative to driving cars, marking stops and stations as well as the buses.Large cities usually have big bus networks. A map showing all bus lines might be incomprehensible, and cause people to wait for low-frequency buses that may not even be running at the time they are needed. By identifying the main bus lines having high-frequency service, with a special brand and separate maps, it is easier to understand the entire network.
Public transit apps are more convenient than a static map, featuring services like trip planning, live arrival and departure times, up-to-date line schedules, local station maps, service alerts, and advisories that may affect one's current trip. Transit and Moovit are examples of apps that are available in many cities around the world. Some operators of bus rapid transit systems have developed their own apps, like Transmilenio. These apps even include all the schedules and live arrival times and stations for buses that feed the BRT, like the SITP in Bogotá.
In tunnels or subterranean structures
A special issue arises in the use of buses in metro transit structures. Since the areas where the demand for an exclusive bus right-of-way are apt to be in dense downtown areas where an above-ground structure may be unacceptable on historic, logistic, or environmental grounds, use of BRT in tunnels may not be avoidable.Since buses are usually powered by internal combustion engines, bus metros raise ventilation issues similar to those of motor vehicle tunnels. Powerful fans typically exchange air through ventilation shafts to the surface; these are usually as remote as possible from occupied areas, to minimize the effects of noise and concentrated pollution.
A straightforward way to reduce air quality problems is to use internal combustion engines with lower emissions. The 2008 Euro V European emission standards set a limit on carbon monoxide from heavy-duty diesel engines of 1.5 g/kWh, one third of the 1992 Euro I standard. As a result, less forced ventilation will be required in tunnels to achieve the same air quality.
Another alternative is to use electric propulsion, which Seattle's Metro Bus Tunnel and Boston's Silver Line Phase II implemented. In Seattle, dual-mode buses manufactured by Breda were used until 2004, with the center axle driven by electric motors obtaining power from trolley wires through trolley poles in the subway, and with the rear axle driven by a conventional diesel powertrain on freeways and streets. Boston is using a similar approach, after initially using trolleybuses pending delivery of the dual-mode vehicles in 2005.
In 2004, Seattle replaced its "Transit Tunnel" fleet with diesel-electric hybrid buses, which operate similarly to hybrid cars outside the tunnel and in a low-noise, low-emissions "hush mode" when underground. The need to provide electric power in underground environments brings the capital and maintenance costs of such routes closer to those of light rail, and raises the question of building or eventually converting to light rail. In Seattle, the downtown transit tunnel was retrofitted for conversion to a shared hybrid-bus and light-rail facility in preparation for Seattle's Central Link Light Rail line, which opened in July 2009. In March 2019, expansion of the light rail in the tunnel moved busses back to surface streets.
Performance
A BRT system can be measured by a number of factors. The BRT Standard was developed by the Institute for Transportation and Development Policy to score BRT corridors, producing a list of rated BRT corridors meeting the minimum definition of BRT. The highest rated systems received a "gold" ranking. The latest edition of the standard was published in 2016.Other metrics used to evaluate BRT performance include:
- The vehicle headway is the average time interval between vehicles on the same line. Buses can operate at headways of 10 seconds or less, but average headways on TransMilenio at busy intersections are 13 seconds, 14 seconds for the busiest section of the Metrobus.
- Vehicle capacity, which can range from 50 for a conventional bus up to some 200 for an articulated vehicle arranged for standing passengers. Merobus Istanbul operates both Mercedes-Benz Citaro with a capacity of 150 and Mercedes CapaCity with a capacity of 193.
- The effectiveness of the stations to handle passenger demand. High volumes of passengers on vehicles required large bus stations at busy interchange points.
- The effectiveness of the feeder system — can these deliver people to stations at the required speed.
- Local passenger demand. Without a local demand for travel, the capacity will not be used.
Location | System | Peak passengers per hour per direction | Passengers per day | Length |
Bogotá | TransMilenio | 35,000 – 40,000 | 2,154,961 | 113 |
Ahmedabad | Janmarg | 450,000 | 125 | |
Guangzhou | Guangzhou Bus Rapid Transit | 26,900 | 1,000,000 | 22 |
Curitiba, Brazil | Rede Integrada de Transporte | 13,900 – 24,100 | 508,000 | 81 |
Mexico City, Mexico | Mexico City Metrobus | 18,500 | 1,800,000 | 140 |
Belo Horizonte, Brazil | Sistema MOVE | 15,800 – 20,300 | 1.100.000 | 24 |
Istanbul | Metrobus | 7,300 – 19,500 | 800,000 | 52 |
New Jersey | Lincoln Tunnel XBL | 15,500 | 62,000 | |
Brisbane | South East Busway | 15,000 | 23 | |
Jakarta | Transjakarta | 172 | ||
New York | Select Bus Service | 30,195 |
Comparison with light rail
After the first BRT system opened in 1971, cities were slow to adopt BRT because they believed that the capacity of BRT was limited to about 12,000 passengers per hour traveling in a given direction during peak demand. While this is a capacity rarely needed in the US, in the developing world this capacity constraint was a significant argument in favor of heavy rail metro investments in some venues.When TransMilenio opened in 2000, it changed the paradigm by giving buses a passing lane at each station stop and introducing express services within the BRT infrastructure. These innovations increased the maximum achieved capacity of a BRT system to 35,000 passengers per hour. Light rail, by comparison, has reported passenger capacities between 3,500pph to 19,000pph. "From these findings … there is little evidence to support the view that can carry more than busways.". There are conditions that favor light over BRT, but they are fairly narrow. To meet these conditions you would need a corridor with only one available lane in each direction, more than 16,000 passengers per direction per hour but less than 20,000, and a long block length, because the train cannot block intersections. These conditions are rare, but in that specific instance, light rail would have a significant operational advantage. However, "... any perceived advantages of over BRT are primarily aesthetic and political rather than technical … due to the perceived capacity constraint of BRT there are currently no cases in the US where should be favored over BRT."
Comparison with conventional bus services
Conventional scheduled bus services use general traffic lanes, which can be slow due to traffic congestion, and the speed of bus services is further reduced by long dwell times.In 2013, the New York City authorities noted that buses on 34th Street, which carried 33,000 bus riders a day on local and express routes, traveled at, only slightly faster than walking pace. Even despite the implementation of Select Bus Service, dedicated bus lanes, and traffic cameras on the 34th Street corridor, buses on the corridor were still found to travel at an average of 4.5 mph.
In the 1960s, Reuben Smeed predicted that the average speed of traffic in central London would be without other disincentives such as road pricing, based on the theory that this was the minimum speed that people will tolerate. When the London congestion charge was introduced in 2003, the average traffic speed was indeed which was the highest speed since the 1970s. By way of contrast, typical speeds of BRT systems range from.
Cost
The capital costs of implementing BRT are lower than for light rail. A study by the United States Government Accountability Office from 2000 found that the average capital cost per mile for busways was $13.5 million while light rail average costs were $34.8 million. However, the total investment varies considerably due to factors such as cost of the roadway, amount of grade separation, station structures, traffic signal systems and vehicles.Operational costs of running a BRT system are generally lower than light rail, though the exact comparison varies, and labor costs depend heavily on the wages which vary between countries. For the same level of ridership and demand, higher labor costs in the developed world relative to developing countries will tend to encourage developed world transit operators to prefer operate services with larger but less frequent vehicles. This will allow the service to achieve the same capacity while minimizing the number of drivers. This may come as a hidden cost to passengers in lower demand routes who experience a significantly lower frequencies and longer waiting times. In the developing world the operating cost advantages of BRT over light rail or streetcar are much greater due to lower wages. In the study done by the GAO, BRT systems usually had lower costs based on "operating cost per vehicle hour", "operating cost per revenue mile", and "operating cost per passenger trip", mainly because of lower vehicle cost and lower infrastructure cost. The initial capital costs of diesel BRT are also much less lower than a trolleybus system.
Proponents of light rail argue that the operating costs of BRT are not necessarily lower than light rail. The typically larger light rail vehicles enjoy reduced labor costs per passenger, and the unit capital cost per passenger can be lower than BRT. Furthermore, light rail vehicles have proven useful lifespans of forty years or more, as opposed to buses that often have to be replaced after less than twenty years.
An ambitious light rail system runs partly underground, which gives free right-of-way and much faster traffic compared to passing the traffic signals needed in a surface level system. Underground BRT, suggested as early as 1954, is rare and expensive. As most buses run on diesel, air quality can become a significant concern in tunnels, but the Downtown Seattle Transit Tunnel is an example of using hybrid buses, which switch to overhead electric propulsion while they are underground, eliminating diesel emissions and reducing fuel usage. An alternative is an elevated busway, which is also costly. A desire for grade separation indicates that a rail alternative may be better.
vehicles are used in Metz, France.
Criticism
BRT systems have been widely promoted by non-governmental organizations such as the Shell-funded EMBARQ program, Rockefeller Foundation and Institute for Transportation and Development Policy, whose consultant pool includes the former mayor of Bogota, Enrique Penalosa.Supported by contributions of bus-producing companies such as Volvo, the ITDP not only established a proposed "standard" for BRT system implementation, but developed intensive lobby activities around the world to convince local governments to select BRT systems over rail-based transportation models.
Environmental issues
Unlike electric-powered trains commonly used in rapid transit and light rail systems, bus rapid transit often uses diesel- or gasoline-fueled engines. The typical bus diesel engine causes noticeable levels of air pollution, noise and vibration. It is noted however that BRT can still provide significant environmental benefits over private cars. In addition, BRT systems can replace an inefficient conventional bus network for more efficient, faster and less polluting BRT buses. For example, Bogotá previously used 2,700 conventional buses providing transportation to 1.6 million passengers daily, while in 2013 TransMilenio transported 1.9 million passengers using only 630 BRT buses, a fleet less than a quarter in size of the old fleet, that circulates at twice the speed, with a huge reduction in air pollution.To reduce direct emissions some systems use alternative forms of traction such as electric or hybrid engines. BRT systems can use trolleybuses to lower air pollution and noise emissions such as those in Beijing and Quito. The price penalty of installing overhead lines could be offset by the environmental benefits and potential for savings from centrally generated electricity, especially in cities where electricity is less expensive than other fuel sources. Trolleybus electrical systems can be potentially reused for future light rail conversion. TransJakarta buses, uses cleaner compressed natural gas-fueled engines. While Bogotá started to use hybrid buses in 2012: they use regenerative braking to charge batteries when the bus stops and then use electric motors to propel the bus up to 40 km/h, speed at which the regular diesel engine starts automatically, with considerable savings in fuel consumption and pollutant dispersion. Furthermore, the lifetime of individual buses is generally shorter than their rail-based counterparts, potentially making the BRT system more expensive to operate in the long term.
Overcrowding and poor quality service
Many BRT systems suffer from overcrowding in buses and stations as well as long wait times for buses. In Santiago de Chile the average of the system is six passengers per square meter inside vehicles. Users have reported days where the buses take too long to arrive, and are usually too overcrowded to accept new passengers. As of June 2017 the system has 15% of approval from the users and has lost 27% of its passengers, who have turned mostly to cars.In Bogotá the overcrowding is even worse; the average of TransMilenio is eight passengers per square meter . Only 29% feel satisfied with the system. The data also show that 23% of the citizens agree with building more TransMilenio lines, in contrast of the 42% who consider that a rapid transit system should be built.
Several cases of sexual assault have been reported by female users in TransMilenio. According to a 2012 survey made by the secretary of the woman of Bogota, 64% of women said they had been victims of sexual assault in the system. The system has even been ranked as the most dangerous transport for women.
The bad quality of the system has occasioned an increment in the number of cars and motorcycles in the city, the citizens prefer these transport means over TransMilenio. According to official data the number of cars increased from approximately 666.000 in 2005 to 1.586.700 in 2016; the number of motorcycles is also growing, 660.000 were sold in Bogota in 2013, twice the number of cars sold.
In Jakarta there have been also reports of overcrowding in buses and stations, low frequency of the routes and many reports of sexual harassment cases as well as problems with buses that burn on their own. The quality of the service is so bad that in 2015 the Jakarta governor apologized for the bad service.
Failures and reversals
A principal criticism of BRT systems is that they may not accomplish their promise of an efficient, rapid flow of passengers along their dedicated bus lanes. The unpopularity of Delhi's BRT and the increasing riots and spontaneous user demonstrations in Bogotá raise doubts about the ability of BRTs to tackle issues such as the traffic jams induced by dedicated lanes. Overcrowded stations and BRT vehicles may fail to keep pace with increased ridership, and may eventually need to be replaced with high-capacity rail systems.The lack of permanence of BRT has also been criticized, with some arguing that BRT systems can be used as an excuse to build roads that others later try to convert for use by non-BRT vehicles. Examples of this can be found in Delhi, where a BRT system was scrapped, and in Aspen, Colorado, where drivers are lobbying the government to allow mixed-use traffic in former BRT lanes as of 2017. Similarly, the Belfast Chamber of Trade and Commerce has called for bus lanes to be scrapped in certain areas of the city "as an experiment." Bangkok was also making plans to scrap a set of bus-only lanes, as of early 2017. New Orleans ran buses on Canal Street in a dedicated right of way beginning in the 1960s. This style of service was maintained until 2004 when streetcar service was restored on this route segment. This perceived lack of permanence has made BRT lines significantly less attractive to real estate developers than rail lines.
Experts also attribute the failure of BRT to land use structure. Cities that are sprawled and have no mixed use have poor ridership to make BRT economically viable. In Africa, the African Urban Institute criticized the viability of ongoing BRTs across the continent.
Replacing BRT with higher capacity modes
While the Los Angeles Metro Orange Line is sometimes cited as an example of a successful North American BRT line, its very success has led to overcrowding and long-term plans to replace it with a rail line. The problem in replacing an existing BRT corridor with a rail line is that service disruptions are unavoidable during construction and this lack of reliability may hurt ridership.Impact
A 2018 study found that the introduction of a BRT network in Mexico City reduced air pollution.General information
- Institute for Transportation and Development Policy
- A very comprehensive 800 guide to creating a successful BRT system by the Institute for Transportation and Development Policy
- Transportation Research Board
- Transportation Research Board
- An international Centre of Excellence for BRT development
- Transportation Research Board
- . University of Minnesota Center for Transportation Studies, Department of Mechanical Engineering
Country-specific information
- Institute for Transportation & Development Policy
- U.S. General Accounting Office
-
Databases
- Database of Bus Rapid Transit systems around the world