Bujagali–Tororo–Lessos High Voltage Power Line


Bujagali–Tororo–Lessos High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Bujagali, in Uganda to another high voltage substation at Lessos, in Kenya.

Location

The power line starts at Bujagali Hydroelectric Power Station, in Jinja District, as a 220kV high voltage power line. From here, the line travels to the eastern Ugandan town of Tororo, a distance of about. At Tororo, the voltage is stepped up to 400kV, and the line travels in that state, through the town of Eldoret, to Lessos, in Nandi County, a total distance of approximately.

Overview

This power transmission line connects the electricity grid of Uganda to that of neighboring Kenya. It is in line with The Nile Equatorial Lakes Subsidiary Action Program, Interconnection of Electric Grids Project, led by Regional Manager, Grania Rubomboras.
The power line satisfies Uganda's need to export electricity to Kenya. It also satisfies Kenya's need to sell electricity to Uganda and the countries to the west of Kenya, including Rwanda, Burundi and the Democratic Republic of the Congo.

Construction in Uganda

The Bujagali–Kenya border section is jointly funded by the government of Uganda, the African Development Bank, and the Japan International Cooperation Agency.

Construction in Kenya

The Lessos–Uganda border section is jointly funded by the government of Kenya and the African Development Bank, at an initial cost of KSh2.3 billion. Construction is ongoing, with commercial commissioning, expected in December 2019.