The Birmingham–Peterborough line is a cross-country railway line in the United Kingdom, linking Birmingham, and, via and. Since the Beeching Axe railway closures in the 1960s, it is the only direct railway link between the West Midlands and the East of England. The line is important for cross-country passenger services, East of Peterborough, the route gives access from the Midlands to various locations in the east of England, such as, and via the West Anglia lines. It is also strategically important for freight, as it allows container trains from the Port of Felixstowe to travel to the Midlands and beyond.
History
The present route is an amalgamation of lines that were built by separate companies. The sections were:
In the 1980s, local services were worked by Class 105Diesel Multiple Units and long-distance services, such as those between and, were operated by formations of Class 31 locomotives with rakes of four Mark 1 carriages. From 1986 the first Sprinter trains operated on the line, Class 150s, subsequently replaced by Class 156 SuperSprinter units from 1988. From this time, the service operated hourly between Birmingham New Street and with alternate services continuing to or. Central Trains operated the route from privatisation, and for operational convenience combined services on the route either side of Birmingham New Street, which created through services such as and to Cambridge and Stansted Airport and to Stansted Airport, although these were subsequently cut back - services to Aberystwyth ceased in 2001, although a few services continued to terminate at until 2004, whilst Liverpool was removed in 2003 to improve performance. The service in 2016 consists of two trains per hour between Birmingham and, one of the two calling at limited stops to Leicester and continuing to Stansted Airport via, Ely and Cambridge, operated by CrossCountry. East Midlands Railway operates a handful of services along the section between Syston and Peterborough as part of its London service via. In addition, there are a few services between and Norwich operated by EMT which also serve. Cross Country services are exclusively worked by Class 170Turbostar units, while EMT use Class 158Express Sprinter trains on services to Norwich and Class 222 Meridian trains for London services. In addition, EMT also operate an evening to Nottingham service which is worked by a Class 153 SuperSprinter. Freight trains use the route between the West Midlands and the East Anglia, primarily container trains to the Port of Felixstowe and sand trains to King's Lynn.
Current developments
Felixstowe and Nuneaton freight capacity scheme
This is a large project with a number of elements that will allow more railfreight traffic between the Haven ports and the Midlands. The work was prompted by the 'Felixstowe South' expansion at the Port of Felixstowe. It is also in response to the predicted increase in the number of high-cube shipping containers arriving at the ports that cannot currently be accommodated on the route. The percentage of high-cube containers is expected to increase from 30% in 2007 to 50% in 2012. Without loading gauge enhancement these larger containers would have to be transported by road or via a longer rail route via London that is already operating at capacity. Network Rail completed the gauge enhancement from Ipswich to Peterborough in 2008. Work will take place in three phases:
* Raising speed restrictions for freight trains between Ipswich and Peterborough
Phase 2b
*Capacity enhancement Peterborough to Nuneaton during CP5
The work, detailed in the Network Rail Freight Route Utilisation Strategy, should be completed by 2014. at an estimated cost of £291 million. The government is providing £80 million and it will also receive £5 million from Network Rail and £1 million from the East of England Development Agency. It has been estimated that the scheme would take 225,000 lorries off the road. In February 2010 Network Rail confirmed that it would construct the 1 km 'Bacon Chord' in Ipswich to allow trains to travel between the East Suffolk line and the Ipswich–Ely line without reversing into Ipswich Station and to also perform work to increase capacity between Ely–Peterborough line at a total cost of £50m. It was stated that the work would 'take 750,000 lorries off the roads'.
Peterborough to Nuneaton gauge
Enhancement of a section of the Birmingham–Peterborough line involving the reconstruction of 14 bridges, 11 tracking lowering/slewing schemes and one accommodation bridge. The cost is estimated at £40.5 million. The West Coast Main Line is already cleared to W10 and the route from Nuneaton to Birmingham is already cleared to W12. W10 gauge clearance was achieved on 4 April 2011 and GBRf trains requiring W10 gauge began using the route that day.
Nuneaton North Chord
The Nuneaton North Chord was completed and opened on 15 November 2012. The chord allows freight traffic approaching Nuneaton from Felixstowe via the Birmingham–Peterborough line to proceed north on the West Coast Main Line without conflicting with southbound main-line trains. It consists of a one-mile chord from the existing flyover over the West Coast Main Line to join the line to the north. The cost of this work was £25.6 million. A Transport & Works Act Order for the Nuneaton North Chord was granted by the Secretary of State for Transport in July 2010. Work began in mid-2011.