The BTR-3 is an Eight-wheel drivearmored personnel carrier developed in 2000-2001 by an international consortium. The companies involved in the project include the Kharkiv Morozov Machine Building Design Bureau of Ukraine, the ADCOM MANUFACTURING Company of Abu-Dhabi, UAE, and the State Scientific Technical Centre of Artillery & Rifle Arms of Ukraine. Although somewhat similar in appearance to the Russian BTR-80, the BTR-3U is an all-new production vehicle rather than an update of the existing in-service vehicle.
Armament
The BTR-3U is fitted with the one-person KBA-105 "Shkval" unified fighting module which can accommodate 30mm gun, 7.62mm coaxial machine gun, 30mm automatic grenade launcher and anti-tank guided weapons. This module was developed by the State Scientific Technical Centre of Artillery & Rifle Arms of Ukraine. The Shkval fighting module design is versatile, but can also with another turret.
The 125 mm KBA-3 tank gun
The Cockerill CSE 90LP with 90mm Cockerill LP
The KBA-105 one person manned turret with 30 mm ZTM-1 dual-feed autocannon that has 350 rounds of ready-use ammunition or Stiletto turret with 30mm ZTM-2.
A total of 2,500 rounds are carried for the 7.62mm coaxial machine gun.
The 30 mm AGS-17D grenade launcher is mounted on the left side of the turret, having 29 rounds of ready-use ammunition, with additional 87 rounds being carried in reserve.
Cockerill CPWS 30 turret with 30mm autocannon.
Six 81 mm electrically operated smoke/aerosol grenade launchers are mounted three either side of the turret rear and firing forwards.
The sighting systems include a commander's 1PZ-3 observation periscope and a TKN-4S Agat stabilised sight which is integrated with the missile fire control system.
BTR-3DA has BM-3M Shturm-M weapon station armed with ZTM-1 30mm autocannon, KT-7,62 machine gun, KBA-117 30mm grenade launcher, six smoke grenade launchers 902B Tucha, and ATGM system, Barrier.
Equipment design
The standard equipment of the BTR-3U also includes hydraulically amplified powered steering on the front four road wheels and a central tire-pressure regulation system that allows the driver to adjust the tire-pressure to suit the terrain being crossed. The BTR-3U is fitted with French Michelin tires. The BTR-3U engine compartment consists of a Deutz BF6M1015 diesel developing 326 hp coupled to an Allison MD3066 fully automatic transmission. The power pack and transmission are fitted by the Kharkiv Morozov Machine Building Design Bureau with the technical assistance of the Deutz AG and the Allison Transmission companies. The engine compartment is fitted with an automatic double-action fire extinguishing system. The vehicle is fully amphibious, propelled when afloat by a single water jet mounted at the rear of the hull. To prepare the vehicle for water, the driver erects a trim vane and switches on the bilge pumps from within the vehicle. The troop compartment accommodates six soldiers who enter and leave the vehicle by a door in either side of the hull. The lower part of the door folds downward to form a step, with the upper part opening forwards. There are also hatches in the roof and firing ports with associated vision devices provided in the sides and front of the vehicle. An air conditioning system is fitted as standard to ensure crew comfort in hot conditions.
Variants
BTR-3U "Hunter": initially known as BTR-94K. As described.
* BTR-3U Guardian: version for UAE Marines with "Buran-N1" turret.
BTR-3E: has a new UTD-20 engine.
* BTR-3E1: latest version with BM-3 "Shturm" turret and new engine MTU 6R106TD21
BTR-3DA: upgraded version purchased by the Ukrainian armed forces in 2017. BTR-3DA is BM-3M Shturm-M weapon station armed with ZTM-1 30mm autocannon, KT-7,62 machine gun, KBA-117 30mm grenade launcher.
: 96 BTR-3E1s delivered with the price tag of 4 billion baht, 120 more on order from Ukraine. The first 2 of 96 BTR-3E1 have been delivered at U Tapao Airport on 17 September 2010. The second batch of 121 BTR-3E1s with a price tag of 5 billion baht have been ordered by Royal Thai Army and 14 BTR-3E1s have been ordered by Royal Thai Navy to be used by Royal Thai Marine Corps in August 2010 with the MTU Engine and Edison Gear. The Royal Thai Army plans to use the BTR-3E1 as the backbone for one regiment of create the Mobile Infantry regiment which require 288 BTR-3E1s even the first 96 BTR-3E1 would be enough to create only one mobile infantry battalion. The first 96 BTR-3E1 consisted of seven variation models including 64 BTR-3E1 for infantry mobilization, four BTR-3E1 for commanders, three BTR-3E1s for field medics, nine BTR-3E1s for mobilized 81-mm grenade launchers, four BTR-3E1s for mobilized 120-mm grenade launchers, six BTR-3E1s for ATMS anti-tank rocket unit, and six BTR-3E1s for salvaging tasks. Furthermore, the Ukrainian government has given five BTR-3E1s for free including four BTR-3E1s for infantry mobilization and one BTR-3E1 for salvaging tasks in addition to the first batch of 96 BTR-3E1s, while making a contract for the maintenance of nine BTR-3E1. The batch of 12 BTR-3E1s for Royal Thai Marine Corps have reached Thung Prong Port in Sattahip on 24 June 2011 and the ceremony has been held on 29 July 2011. These BTR-3E1 vehicles are to replace the aging V-150armoured vehicles which will be kept in the Reconnaissance Battalion of Royal Thai Marine Corps before being deployed in three southern provinces. Another order for 15 BTR-3E1 and 6 BTR-3RK vehicles was placed by the Royal Thai Army in August 2013.