By Act of Parliament of 1897, the GWR was authorised to make an eastwards connection between the BHR and the Portishead Railway, and then create the West Loop at which would face south towards and. This connection would allow a doubling of BHR rail access capacity to the Great Western main line. In 1905, it was proposed to undertake the authorised extension of the BHR from Wapping Wharf across Spike Island. It would then junction into two branches: a western branch to Wapping via a line alongside the New Cut; and to Canons Marsh on the northside of the River Avon, which would then merge with the Portishead Railway. Under a joint agreement, Bristol Corporation and the GWR engaged as their Chief Engineer J.C. lnglis. The building contractor was John Lysaght and Co., while Armstrong Whitworth were engaged to design the hydraulic movement system. Construction of the span-bridge started in 1905, with two squared rock-faced limestone piers, the southern one of which would pivot the swinging span. This supported a moveable Whipple Murphy truss span, weighing, with total metal work of the entire bridge weighing in at. With the bridge able to operate both ways, each opening/closing cycle consumed of water from the Floating Harbour. The bridge control cabin, road and railway signal boxes, and the reversible hydraulic motor were all housed in a single structure perched on stilts above the upper road deck. The original estimate for the bridge was £36,500, with the GWR agreeing to pay half. The final cost was £70,389, to which Bristol Corporation asked the GWR to increase its contribution. After further negotiation the GWR contributed £22,000.
Operations
Designed and opened as the freight-only Wapping Wharf Branch, the bridge was opened on 3 October 1906 by the Lady Mayoress, Mrs A.J.Smith. With both railway and road operations and bridge maintenance undertaken by the GWR, it opened on average ten times a day until February 1934. The controlling railway signals were interlocked with the signal boxes on either side of the river, making it impossible for signals to be cleared unless the bridge span was locked in the closed position.
Decommissioning
Bristol Corporation rescinded the GWR's obligation to maintain the swing apparatus in 1951, after which it was welded shut. After the completion of a new A370 roaddual carriageway system in the docks area, and the opening of the replacement Plimsoll Bridge to the west in 1965, the road deck and signal cabin were removed. section of the bridge The BHR's connection with Temple Meads was closed and the track lifted in 1964, and the Canons Marsh branch closed the following year. The Western Fuel Company continued to use the line from the Portishead branch over the swing bridge and Wapping marshalling yard for commercial coal traffic. The rail line over the bridge was singled in 1976, and shut operationally after Western Fuel ceased railway operations in 1987. The bridge was revisited by GWR Pannier Tank No.1369 in 1996, prior to the re-opening of the residual BHR as a visitor attraction.
Present
Grade II listed in May 2000, The single track rail line remained in place over the bridge, but was highly overgrown. Network Rail later lifted the track from the bridge to. The other side of the railway level has been converted into rail trail foot and cycle path, part of the Pill pathway. It is listed on the Heritage at Risk Register. In 2015 it was announced that the bridge would close for a period of 12 months from the autumn for a complete renovation in connection with the MetroBus project. The bridge now carries a separate single bus lane and a wider cycle and pedestrian path.