The junction is northeast of the site of the former Parkgate and Rawmarsh station, which closed in 1968. At this point the double track former Great Central Railway line from Sheffield Victoria to Mexborough came within 50 yards of the four-track former North Midland Railway line from Leeds to Derby. The original junction was a double track cross-over taking traffic to and from the GC lines to the two "slow" lines of the North Midland in the direction of Leeds and to and from the "slow" lines of the North Midland to the GC, in the direction of Mexborough. Further ‘ladder’ cross-overs were installed in 1973 to make possible a move from the "slow" to the "fast" lines on the North Midland at each end of the junction. This gave access and egress via the GC to the northern end of the newly built Tinsley Marshalling Yard at Sheffield and to its southern end via a connection from the NorthMidland line at Treeton, south of Rotherham. Operation of the junction and the immediate vicinity through new multiple aspect colour light signalling, four aspect on the Midland "fast" lines and three aspect on the Midland "slow" and G.C. lines, was installed controlled from a new power-operated signal box set just to the north of the scissors crossing. The signal box closed in the late 1970s when the new Sheffield power box took over responsibilities for the area, however the building remained, firstly as an emergency facility due to its strategic location, and later as a staff building.
Closures
The construction of the junction allowed a double track curve at Swinton between Swinton Town station and Mexborough to be closed. At the same time, Sheffield to Doncaster trains were re-routed to Sheffield Midland over the new junction as a part of the plan to close Sheffield Victoria, also resulting in the closure of Rotherham Central in 1966.
Rationalisation
In the late 1980s and early 1990s the junction was remodelled. The third and fourth running lines north of the junction were removed and the connection to the G.C. in the Mexborough direction was moved to be a single-line ladder junction north of the existing junction, thus removing the complexity of the double-scissors crossing. To enable trains travelling from Sheffield to Doncaster to call at the new Swinton station the previously lifted double-track curve to the Mexborough line from Swinton was replaced and almost all passenger traffic routed this way – the old G.C line is still used for goods traffic and a limited number of passenger trains run for operational reasons. Today the junction is a known bottleneck with many local stopping trains, fast expresses and freight trains all converging on the junction. Prior to its demise, Railtrack had plans to reinstate the third and fourth running lines north of the junction as far as Swinton junction and remodel Swinton station to increase capacity. These plans were not adopted by Railtrack's successor Network Rail in the short term. However the Yorkshire and Humber Route Utilisation Strategy mentions the quadrupling of this section of line as a possible necessity for Control Period 5, i.e. 2014 at the very earliest.
Industry in the area
The junction is sited within a heavy industrial area. Although the coal mines have closed, the last in 1964, the Parkgate Iron and Steel Company invested heavily in the mid-1960s in the development of a new site alongside the GC with rail access. Nowadays the site is owned by Corus and comprises not just the Aldwarke melting and steel processing but was developed further with the opening of the Thrybergh Bar Mill in 1976. At the north end of the junction, adjacent to the North Midland line, and rail connected to it, is situated the just post-war, and now closed, Roundwood Rolling Mill. However, the former blast furnace and open hearth steel melting plant to the rear of Parkgate and Rawmarsh station are gone, replaced by large retail parks. The road names, however, reflect the railway theme, although most not from the railways of this area. .