Aberdovey railway station


Aberdovey railway station serves the seaside resort of Aberdyfi in Gwynedd, Wales. The station is on the Cambrian Coast Railway with passenger services every two hours calling at all stations between Machynlleth railway station and Pwllheli railway station, including Tywyn railway station,, Harlech railway station and Porthmadog railway station. Passengers can connect at Machynlleth for trains to or,, and.

History

Opened by the Aberystwith and Welsh Coast Railway, then run by the Cambrian Railways, it became part of the Great Western Railway. The line then passed on to the London Midland Region of British Railways on nationalisation in 1948. When Sectorisation was introduced, the station was served by Regional Railways until the Privatisation of British Railways. Until the 1960s there was a summer service between and Pwllheli, via, Shrewsbury and Machynlleth.
The original station building is in use as a private residence. It is located next to a static caravan park which is all that lies between the station and the stretch of coastline between Aberdyfi and Tywyn, and next to the Aberdovey Golf Club.
The station was host to a GWR camp coach in 1939. At least one camping coach was positioned here by the Western Region from 1952 to 1962, there were two from 1957 to 1958 and three from 1959 to 1962 when the London Midland Region took over responsibility for the coaches, they had three here from 1963 to 1971.

Facilities

Originally a two-platform station with a short branch line to the harbour, the station is now a single-platform, unstaffed halt. Like many stations in Wales and the North of England, the station was constructed before standard platform heights were established and is very low. Aberdovey was the third UK railway station to receive a specially designed raised section - a Harrington Hump - to improve accessibility for passengers. This was funded by the Welsh Government.

Services

run a two-hourly service each way on the Cambrian Coast Line from Machynlleth - where the route connects to the main Cambrian Line - to Pwllheli through Aberdyfi. Most services in the May 2016 timetable run to/from Birmingham International via Shrewsbury.